Slide 1: Transition Technology for a Low Carbon Future
Synertec Corporation Limited (ASX: SOP) ‘Transition Technology for a Low Carbon Future’ ‘The only ASX-listed company focused on zero-emission remote continuous industrial-scale energy production.’
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by Synertec Corporation Limited (Synertec or the Company) on behalf of the Forward looking statements, forecasts and estimates, by their very nature, involve known and unknown risks and Company and its subsidiaries (the Group). are subject to uncertaint
Slide 3: Disclaimer (continued)
Disclaimer (continued) The Joint Lead Managers are acting as lead managers and bookrunners to the Placement. A summary of the key (i) disclaim all responsibility and liability (including, without limitation, any liability arising from fault, negligence or terms of the placement agreement between Syn
Slide 4: Executive Summary
Executive Summary Synertec – Technologies for a world in transition Synertec is the only ASX-listed company focused on zero-emission remote continuous industrial-scale energy production. We partner with organisations looking to lead the charge in finding clean, cost-effective ways to execute their i
Slide 5: Integrating Technology and Engineering for 25+ years
Integrating Technology and Engineering for 25+ years At this critical juncture for the global economy, Synertec can deliver immediate solutions to help solve the challenges of energy efficiency, security and reliability that governments and commercial leaders require Technology Engineering Synertec’
Slide 6: Technologies for a World in Transition
Technologies for a World in Transition We are partnering with organisations looking to lead the charge in finding clean, cost-effective ways to execute their industrial processes while simultaneously reducing their carbon footprint 1 2 3 Powerhouse LNG Custody Transfer Composite Dry Powder AI-contro
Slide 7: Powerhouse Technology
Powerhouse Technology Synertec Corporation Limited (ASX:SOP) | September 2022 7
Slide 8: Powerhouse – Reliable Renewable Power in Remote Locations
Powerhouse – Reliable Renewable Power in Remote Locations Cost-effectively replacing fossil fuels solves the world’s CO2 problem and Powerhouse is the technology to do just that The Challenge The Solution • Energy industry is one of the heaviest emitting sectors • Powerhouse’s breakthrough technolog
Slide 9: Market Position
Market Position Powerhouse fits a large gap in the market to satisfy critical continuous industrial applications Solar Generation Systems – Sizing Spectrum Small Scale Powerhouse Large Grid Scale POWERHOUSE <50kW 50kW to 10 MW 10 MW + • Off-the-shelf systems • Modular, rapid deployment, portable sol
Slide 10: The ESG Value Proposition is Compelling – In Australia and the USA
The ESG Value Proposition is Compelling – In Australia and the USA Prototype environmental credentials proven in the field to meaningfully address climate change The Opportunity Global mining & energy companies have publicly committed to a substantial reduction in GHG emissions, working towards net
Slide 11: The Technology is Globally Applicable
The Technology is Globally Applicable Intelligently decarbonising industry with Artificial Intelligence, sunlight and batteries AI-driven – Multi-satellite-driven big-data solar algorithms enabling accurate prediction of local solar irradiance levels to automate load management Predictive - AI-predi
Slide 12: System Design - Overview
System Design - Overview Powerhouse is a solar PV and BESS system intelligently designed with AI-driven controls for industrial grade applications Battery Battery House 1 House 2 750 kWh 750 kWh Site electrical AI Control System micro grid Site Equipment PV Array 300 kW peak Aerial photo of prototyp
Slide 13: The Market Opportunity
The Market Opportunity Synertec’s Powerhouse technology can be utilised on any remote site globally Staged development and rollout program to drive growth across multiple target markets in Australia and United States CSG exploration & Mining exploration & Agriculture Manufacturing Community Batterie
Slide 14: The Proposed Commercial Model – In Australia and the USA
The Proposed Commercial Model – In Australia and the USA Strong pre-tax cash flows over fixed long-term ‘BOOM’ agreement Construction and supply chain Proposed roll-out strategy Revenue Model • Key component supply chain identified & • Initial orders can be supplied • Build-Own-Operate-Maintain conf
Slide 15: Santos Agreements
Santos Agreements Commercial agreements are in place with Santos to provide a ready end-customer Goods and Services Contract with Santos (ASX:STO): • Original MOU progressed as-planned to a master Goods and Services Contract (‘GSC’) to streamline future orders • Work Orders for future commercial ins
Slide 16: Pathway to Commercialisation
Pathway to Commercialisation Initial rollout of Powerhouse units is to be on brownfield sites to eliminate fossil-fuel generated power Key recent developments include: Phase Estimated Status Completion • Successful Factory Acceptance Testing Concept design Q4 FY21 Complete • Successful delivery and
Slide 17: Other Technologies
Other Technologies Synertec Corporation Limited (ASX:SOP) | September 2022 17
Slide 18: LNG Custody Transfer System (CTS)
LNG Custody Transfer System (CTS) High precision Eliminates fugitive Leverage to Developing measurement Synertec-installed emissions - growing demand marine-based system for the land-based competitive for LNG as a solution with fiscal transfer of systems in place advantage marine fuel GasLog LNG Cur
Slide 19: Composite Dry Powder (CDP)
Composite Dry Powder (CDP) Potential to Enhances Treatment of Wider applications convert mud into operational safety Synertec has hydrocarbon in mining tailings non-polluting high- and lowers IP/supply licence drilling mud & and sewage strength building transportation from GreenTech wastewater sludg
Slide 20: Capital Raising Details
Capital Raising Details Synertec Corporation Limited (ASX:SOP) | September 2022 20
Slide 21: Capital Raise Overview
Capital Raise Overview Raising $5.0 million (before costs) through a placement of 31.25 million new fully Offer structure & size paid ordinary shares to institutional & sophisticated investors Use of Proceeds $0.16 per share, a 13.5% discount to the last closing price of $0.185 as at 8 $1.0m Offer P
Slide 22: Indicative Timetable
Indicative Timetable EVENT AEST DATE Placement closes By 5.00pm Friday, 9 September 2022 Announcement of results of Placement By 9.00am Tuesday, 13 September 2022 Trading halt lifted By 9.00am Tuesday, 13 September 2022 Trading resumes on ex-entitlement basis By 9.00am Tuesday, 13 September 2022 Set
Slide 23: Group Outlook
Group Outlook Synertec Corporation Limited (ASX:SOP) | September 2022 23
Slide 24: Investment Opportunity
Investment Opportunity Technologies for a world in Powerhouse technology Underpinned by deep technical & Robust balance sheet & financial transition progressing to commercialisation management skillset performance • Three advanced technologies to • Agreements with Santos for • ~90 highly skilled eng
Slide 25: Appendices
Appendices Synertec Corporation Limited (ASX:SOP) | September 2022 25
Slide 26: Sustainable Business Focus
Sustainable Business Focus The global focus on carbon emissions reductions presents an historic investment opportunity in Synertec’s Technology and Engineering solutions Environment Social Governance • Developing technologies to • Working with industry to reduce • Transparency and accountability sup
Slide 27: Corporate Snapshot
Corporate Snapshot Synertec Corporation Ltd Key Shareholders* Company Management ASX Code ASX:SOP 15.9% Northwest Nonferrous Australia Mining Shares on issue (post Placement) 388,610,560 10.1% Regal Funds Management 50.7% Placement Offer Price (cents per Share) 16.0 9.6% Perennial Value Management M
Slide 28: Michael Carroll David Harris
Michael Carroll David Harris Managing Director Executive Director | CFO | Company Secretary M: +61 419 351 676 M: +61 434 408 668 E: michael.carroll@synertec.com.au E: david.harris@synertec.com.au Head Office - Ground Floor, 2-6 Railway Parade, Camberwell, VIC, 3124 Tel: +61 3 9274 3000 Perth Office