FY26 FINANCIAL RESULTS AND KEY ACHIEVEMENTS 2nd September 2026 SYNERTEC CORPORATION LIMITED (ASX:SOP) ENGINEERING SOLUTIONS FOR A BETTER FUTURE
Slide 2: Disclaimer
DISCLAIMER This presentation has been prepared by Synertec Corporation Limited (Synertec or the Company) on behalf Forward looking statements, forecasts and estimates, by their very nature, involve known and unknown risks of the Company and its subsidiaries (the Group). and are subject to uncertaint
Slide 3: Three Structural Changes in FY26
THREE STRUCTURAL CHANGES IN FY26 SYNERTEC IS AT AN INFLECTION POINT – BASE RESTORED, CONTINUED TECHNICAL EXCELLENCE, GROWTH CONTRACTED $4.6m $2.5m $20.9m Operating cash turnaround Technology recurring revenue Growth contracted Net operating cash flow +$0.5m. First full- Powerhouse recurring revenue,
Slide 4: Financial Performance Highlights
FINANCIAL PERFORMANCE HIGHLIGHTS TURNAROUND OPERATING CASHFLOW TURNAROUND EBITDA PERFORMANCE +19% +35% $1.5m Nil Group revenue (vs pcp) Engineering contribution margin (vs pcp) Corporate cost-out Powerhouse R&D Spend Synertec Corporation Limited (ASX:SOP) | FY26 Financial Results and Key Achievement
Slide 5: Engineering Business
ENGINEERING BUSINESS ENERGY & DEFENCE & WATER TRANSPORT LIFE SCIENCES RESOURCES MANUFACTURING Synertec Corporation Limited (ASX:SOP) | FY26 Financial Results and Key Achievements | 5
Slide 6: Industry Segment Resilience
INDUSTRY SEGMENT RESILIENCE PRE-QUALIFIED ON NINE ENGINEERING INFRASTRUCTURE PANELS. Engineering Client capital programs are expanding Barrier to entry Exclusivity Pre-qualified for major capital Specialist works reserved to projects panel members $7.3bn ~$32bn Melbourne Water Sydney Water Revenue v
Slide 7: Powerhouse Delivers >99.95% Availability Over Six Years
POWERHOUSE DELIVERS >99.95% AVAILABILITY OVER SIX YEARS GRID-FORMING AND ISLANDED, WITH NO FOSSIL-FUEL BACK-UP. 99.95% 6 years Zero Uptime Continuous operation Unplanned callouts Better than, across six years of Fossil-fuel free, remote Gen 2: 99.98% over 2.5 years, continuous operation Queensland o
Slide 8: Powerhouse Selected by Santos After Competitive Tender Process
POWERHOUSE SELECTED BY SANTOS AFTER COMPETITIVE TENDER PROCESS MOOMBA CENTRAL OPTIMISATION PROJECT Two Powerhouse units operating within the Moomba Power Station alongside five 12MW gas fired generators. SANTOS BENEFITS 1) Spinning reserve, held in the battery • Improving operational flexibility acr
Slide 9: Four Market Segments, Revenue in Three
FOUR MARKET SEGMENTS, REVENUE IN THREE POWERHOUSE MARKET ENGAGEMENT SEGMENTATION. Remote Urban Industry Resilience Grid Resilience Renewable microgrids; high availability, Compact, lower-noise for urban Fast-response battery supporting Edge-of-grid and weak-network solutions; low maintenance, remote
Slide 10: Powerhouse Is Scaling
POWERHOUSE IS SCALING POWERHOUSE PORTFOLIO CONTINUES TO SCALE ACROSS MARKET SEGMENTS • The graph illustrates accelerated industry uptake broken down by market segment. • Powerhouse is delivered into mission critical applications, in hazardous, highly regulated operations. • Industry engagement is bu
Slide 11: Three Measures for FY27
THREE MEASURES FOR FY27 Measure Detail Powerhouse pipeline conversion 1 Convert and expand pipeline and deployment Convert the panel pipeline, expand geographic footprint and deliver with improved 2 Engineering conversion margins 3 Maintain cost discipline Manage costs to improve margins as the busi
Slide 12: Contact Details
Michael Carroll Managing Director | CEO M: +61 419 351 676 E: michael.carroll@synertec.com.au Yash Gala CFO M: +61 409 388 430 E: yash.gala@synertec.com.au HEAD OFFICE Ground Floor, 2 - 6 Railway Parade, Camberwell, Victoria. 3124 Tel: +61 3 9274 3000 synertec.com.au