Odyssey Gold Limited · ASX:ODY
Odyssey Gold — Investor Presentation (August 2022)
18 slides from Odyssey Gold's investor presentation, Aug 1, 2022
Slide 1: Staged Exploration and Development of the Tuckanarra Gold Project
For personal use only STAGED EXPLORATION AND DEVELOPMENT OF THE TUCKANARRA GOLD PROJECT Company Presentation | Q3 2022 | ASX: ODY
Slide 2: Disclosures & disclaimers
Disclosures & disclaimers IMPORTANT INFORMATION For personal use only This presentation has been prepared by Odyssey Gold Ltd (“Odyssey Gold” or the “Company”). This presentation is for information purposes only and should not be considered as an offer or invitation to subscribe for or purchase any
Slide 3: Investment Highlights
Investment Highlights UNLOCKING THE SCALE AND POTENTIAL OF THE TUCKANARRA DISTRICT For personal use only Enviable position in the proven Murchison Goldfields, WA Drilling has grown the Cable-Bollard system along strike to 2km and to a vertical depth of 160m Previous mining at Cable-Bollard in the 19
Slide 4: Untested Depth Potential
Untested Depth Potential For personal use only ▪ Tuckanarra has limited drilling at depth. 0 1* 2* 3* 4* 5* 5* 6* 7* ▪ The Murchison Goldfields are well known for high-grade ore shoots extending to +1,000m depth. 3000 2500 -500 2000 Number of Drillholes 1500 -1000 1000 500 -1500 *Sources (See ODY Pr
Slide 5: Strategy to Add Value
Strategy to Add Value For personal use only Staged Exploration and Development Approach Targeting compelling extensions of the five historical high grade (2.5g/t) pits at Tuckanarra. Substantial exploration success already achieved. Monetise resources defined utilizing extensive regional processing
Slide 6: Pathway to Maiden JORC Resource
Pathway to Maiden JORC Resource For personal use only 45km of drilling since 2020 will form the basis for a maiden JORC Resource 6
Slide 7: Highway Zone
Highway Zone New regional structure and distinct from the For personal use only 2km long Cable-Bollard Trend Recent drilling has returned encouraging results including*: CBRC0056 ▪ 5m @ 3.8g/t Au (170m) ▪ 13m @ 3.7g/t Au (180m) ▪ 11m @ 7.8g/t Au (199m) including 6m @ 13.8g/t Au (199m) CBRC0058 ▪ 4m
Slide 8: Cable-Bollard Trend – A Scalable Opportunity
Cable-Bollard Trend – A Scalable Opportunity Previous resource development and open pit mining was focused on laterite and For personal use only oxide mineralisation due to low gold prices Odyssey has recognised the potential for significant strike and plunge extensions to the mineralisation Mineral
Slide 9: Cable-Bollard | Highway Zone Extension
Cable-Bollard | Highway Zone Extension For personal use only 480m eastern extension to the Cable-Bollard mineralisation 9
Slide 10: Near-Term Catalysts
Near-Term Catalysts For personal use only • Report Assays for 6,000m of completed drilling • Infill and extension of Highway Zone and Maybelle with RC drilling • Drilling of early-stage targets with AC/RAB • RC drilling of Advanced targets • Diamond drilling of high-grade underground targets. 10
Slide 11: Board & Management with a proven track record
Board & Management with a proven track record For personal use only CAPITAL STRUCTURE BOARD OF DIRECTORS ODY SHARES ON ISSUE 612.43M Ian Middlemas – Chairman Highly regarded Chairman and resources executive. Mr Middlemas is currently the Chairman of a PRICE (as at 26/07/2022) A$0.045 number of publi
Slide 12: For further information, please contact
For personal use only ASX: ODY For further information, please contact: Level 9, 28 The Esplanade, Perth WA 6000 T: +61 8 9322 6322 E: info@odysseygold.com.au Matt Briggs, Managing Director +61 8 9322 6322 www.odysseygold.com.au
Slide 13: Appendix 1: Stakewell | Early-stage targets
Appendix 1: Stakewell | Early-stage targets For personal use only Greenstone Target Initial focus on 8km of the 18km long Singleton Formation greenstone between the Stakewell and Tuckanarra projects where folding for greenstones coincides with regional fault flexure. The Highway Greenstones are larg
Slide 14: Appendix 2: Significant Oxide Mining Potential
Appendix 2: Significant Oxide Mining Potential 1km laterite mineralisation blanket along Cable-Bollard trend For personal use only Thick oxide mineralisation at surface Low-cost processing options available including trucking to nearby mills Laterite and oxide mineralisation outlined at Cable-Bollar
Slide 15: Appendix 3: Bottle Dump
Appendix 3: Bottle Dump For personal use only Previously mined at >3g/t Au Mineralisation exposed in base of pit. High grade shoot defined for 360m plunge Recent result of 14m @ 8.2g/t Au from 28m below the pit Standalone project 2km East of Cable-Bollard 15
Slide 16: Appendix 4: Maybelle
Appendix 4: Maybelle Mineralisation exposed at the base of shallow pit For personal use only Potential cutback of open pit High grade plunges defined in Odyssey Gold drilling Result of 4m @ 53.9g/t Au1 demonstrates 100m of vertical continuity 1Refer ASX announcement 25 July 2022 16
Slide 17: Appendix 5: Maybelle North
Appendix 5: Maybelle North Not previously mined For personal use only Shallow oxide Au mineralisation at surface extending for 460m 11 holes recently completed (assays pending) to screen for high grade depth extensions 17
Slide 18: Appendix 6: Stakewell - Kohinoor
Appendix 6: Stakewell - Kohinoor Potential for further depth extensions of Kohinoor shoot For personal use only Potential cutback of open pit Potential for additional stacked lodes, which have only been drilled near surface 18