Arizona Sonoran Copper Co., Inc.
Arizona Sonoran Copper — Investor Presentation (November 2021)
36 slides from Arizona Sonoran Copper's investor presentation, November 2021
Slide 1: Corporate Presentation – November 2021
ASCU:TSX Corporate Presentation – November 2021 COPPER Invest in Sustainability
Slide 2: Cautionary Information
Cautionary Information This presentation (“Presentation”) is being furnished on a confidential basis in order to provide readers certain information with respect to the business and operations of Arizona Sonoran Copper Company Inc. (the “Company” or “ASCU”). This presentation contains forward-lookin
Slide 3: Management Team with Proven Track Record
Management Team with Proven Track Record STRONG SPONSOR SUPPORT George Ogilvie, P.Eng. Ian McMullan, P.Eng., MBA Rodney Prokop, CPA, MBA Rita Adiani, LLB Hons President, CEO & Director COO CFO SVP Strategy & Corporate Development • Investment advisor to three +30 years of management, +25 years of mi
Slide 4: Experienced Board of Directors
Experienced Board of Directors David Laing, B.Sc. Eng Thomas Boehlert, ICD.D George Ogilvie, P.Eng. Chair of the Board of Directors Director President, CEO & Director +40 years experience in the mining industry with roles across +30 years in the agribusiness, mining & energy. Experienced finance ope
Slide 5: The Cactus Mine Project’s Path to Restarting Operations
The Cactus Mine Project’s Path to Restarting Operations Sacaton Begins US$20M ASARCO Remediation ARIZONA SONORAN COPPER COMPANY Production Complete Next 1964 1974 1984 2019 2019 2020 2021 Steps Sacaton Production Suspends • Purchases • Issues PEA • Declaration • PFS and FS Studies Discovery Commence
Slide 6: Why ASCU?
Why ASCU? Brownfield, Scalable Development Private Landownership = Project in Tier 1 Jurisdiction Lower risk permitting process • 100% ownership of Arizona-based past producing • State-and-County Led Permitting Framework mine with in place infrastructure ✓ Water Permit received (access to water) • M
Slide 7: Capital Structure & Current Ownership
Capital Structure & Current Ownership Capital Structure As at November 16, 2021 Ownership Shares Outstanding (M)(1) 69.8 Management, RCF Warrants (M) 6.7 6% Directors, Employees & Options (M) 1.7 Consultants Tembo 5% 38% RSU’s (M)(2) 1.2 Fully Diluted Share Capital (M) 79.4 Other & Retail 30% Cash U
Slide 8: Our ESG Framework – Setting the Pace for Net Zero Carbon Emissions
Our ESG Framework – Setting the Pace for Net Zero Carbon Emissions ▪ ASCU is actively exploring use of renewable energy for its operations including development of an onsite solar farm ▪ Ability to further reduce carbon footprint by Arizona Public Service’s transition to renewable resources (65% by
Slide 9: Journey Towards Net Zero
Journey Towards Net Zero Production and Reporting • Establishing reporting KPIs • Reporting to international standards (e.g. SASB, TCFD) Construction PFS / FS • Investment in low carbon • Design parameters used to scope technologies and minimizing direct impacts (Scope 1 & 2) • Energy efficiencies (
Slide 10: Located At The Intersection Of Arizona’s Three Copper Porphyry Belts
Located At The Intersection Of Arizona’s Three Copper Porphyry Belts Arizona is the USA's leading copper-producing state which accounted for 74% of domestic output of copper in 2020(1) Cactus Project and Parks/ Salyer Deposit Arizona ranked No. 2 for the year 2020 in Fraser Institute’s Investment At
Slide 11: Cactus Site Overview - +4,600 acres
Cactus Site Overview - +4,600 acres ASCU:TSX ARIZONASONORAN.COM 11
Slide 12: Cactus Site – Brownfield Advantage with Ready Access to Infrastructure
Cactus Site – Brownfield Advantage with Ready Access to Infrastructure Powerline and onsite substation connected to Arizona Public Service Electric Historic data, core shack, maps etc. Power substation Vent raise and u/g development to historic orebody Rail spur (to ship concentrate to refinery) Sha
Slide 13: Key Permits in Place – Process with Definitive Timelines
Key Permits in Place – Process with Definitive Timelines ▪ Private land ownership supports State & County level permitting process with a streamlined process ▪ No federal nexus Permit Permit Office Status/Expected Completion Air Quality Permit Pinal County Renew yearly Arizona Pollution Discharge El
Slide 14: Open Pit and Underground Mining
Open Pit and Underground Mining OPEN PIT LAYBACK UG PORTAL FROM OPEN PIT Year Pre-stripping and waste removal Year In-pit UG development starts (assumes 24 pit benches mined) 1 6 Open-pit stripping from years 1-4 with some material reporting Year 6 - Twin Decline, 10,000 ft (3,048 m) to leach pads (
Slide 15: Cactus Production Schedule – Heap Leach & SX/EW Processing
Cactus Production Schedule – Heap Leach & SX/EW Processing CACTUS PRODUCTION SCHEDULE(1)(2) 55,000,000 55,000 Organic Growth Opportunities: 50,000,000 In-Pit and Near-Pit Optimization 50,000 Parks/Salyer 45,000,000 NE Extension 45,000 40,000,000 40,000 Recovered Cu Short Tons 35,000,000 35,000 Mined
Slide 16: Robust Returns from Lowest Capital Intensity vs Peer Group
Robust Returns from Lowest Capital Intensity vs Peer Group INITIAL CONSTRUCTION COST CONSTRUCTION CAPEX BREAKDOWN (US$M) BREAKDOWN US$124M Direct & Indirect Leach Pads, SXEW Total Cost Components Ponds & Pipelines Facility Capital Cost Directs Subtotal $18.4 $45.9 $64.3 18% Indirects Subtotal $3.1 $
Slide 17: Robust Project Economics
Robust Project Economics KEY PROJECT METRICS (1)(2) Over LOM Mine Life 18 years Average Production 28 ktpa (56Mlbs) Operating Costs • Avg OPEX over LOM (US$/t milled) • US$9.06/ton • Avg C1 Cost over LOM (US$/lb) • US$1.55/lb • Avg AISC over LOM (US$/lb) • US$1.88/lb (incl. royalty) Capex • Initial
Slide 18: Positive Initial Metallurgical Testwork
Positive Initial Metallurgical (Bottle Roll / Column Leach) Testwork AVERAGE METALLURGICAL 01 Simple heap-leach/SXEW process considered for 1.3 billion pounds of leachable copper (LOM) PERFORMANCE CRITERIA Net Net Gross Copper Net Acid Resource Source Copper Acid Recovery Consumption Component Infor
Slide 19: Multi-Billion Pound Starter Mineral Resource Base
Multi-Billion Pound Starter Mineral Resource Base • Leachable resource: • 1.1Blbs Indicated • 1.2Blbs Inferred • Leachable Stockpile included at no mining cost, CACTUS & STOCKPILE – TOTAL CONTAINED COPPER: • 224Mlbs contained Cu Indicated Resource– 1,610,700k lbs Inferred Resource– 1,978,800k lbs Mi
Slide 20: Cactus Leachable-Only Mineral Resource Estimate
Cactus Leachable-Only Mineral Resource Estimate Grades Significantly Increase Underground OPEN PIT - UNDERGROUND - STOCKPILE - LEACHABLE RESOURCE Indicated Resource – 1,065,900 Klbs Inferred Resource –1,211,300 Klbs Open Pit & Stockpile Underground Indicated & Inferred Leachable Resource Indicated &
Slide 21: Significant In-Pit Upside Potential
Significant In-Pit Upside Potential Mineral Resource Expansion and Process Optimization Included in PEA Economics 51% of Leachable material from PEA*: • Low-risk resource conversion 18 yr LOM & ~US$1 billion FCF drilling underway • Existing PEA pit shell run at OPTIMIZATION EVIDENCE OF US$2.27/lb Cu
Slide 22: PEA Base Case: Open Pit and Underground
PEA Base Case: Open Pit and Underground ASCU:TSX ARIZONASONORAN.COM 22
Slide 23: Historic and Current Cactus Mine Project Drilling
Historic and Current Cactus Mine Project Drilling ASCU:TSX ARIZONASONORAN.COM 23
Slide 24: PFS and DFS Drilling Program
PFS and DFS Drilling Program • Over 30,000 m of drilling targeted: • 15,000 m at Cactus West targeting 100% conversion of Inferred Resource to the Indicated Resource category within the PEA pit shell • 4,000 m at Cactus East targeting 100% conversion of Inferred Resource to the Indicated Resource ca
Slide 25: Significant Open Pit Upside Within Existing PEA Pit Shell - Cactus West
Significant Open Pit Upside Within Existing PEA Pit Shell - Cactus West • PEA pit shell optimizations for the Cactus West resource reflect a US$2.27/lb copper price (based on the cashflows generated using a US$3.15/lb copper price) • There is potential room to expand the PEA inventory through: • imp
Slide 26: Mineral Resource Growth Opportunities Beyond Cactus Mine
Mineral Resource Growth Opportunities Beyond Cactus Mine ASCU:TSX ARIZONASONORAN.COM 26
Slide 27: Organic Expansion Potential – Parks/Salyer
Organic Expansion Potential – Parks/Salyer PARKS/SALYER HIGHLIGHTS ✓ Down trend from Cactus, Parks/Salyer exhibits the same geological characteristics ✓ Horst structure ✓ North of the chalcopyrite/ pyrite zone boundary ✓ Coincident with historic IP anomalies ✓ Drilling indicates mineralization impro
Slide 28: Opportunities to Replicate Cactus Ore Body – NE Orientated Long Section
Opportunities to Replicate Cactus Ore Body – NE Orientated Long Section 4 KM STRIKE LENGTH NE Extension Hole- id From (ft) To (ft) Length (ft) TCu (%) Mineral Zone 1,016.5 1,044.5 28.0 1.27 oxide 1,078.5 1,125.8 47.3 0.95 oxide 1,161.0 1,208.8 47.8 3.05 oxide S-68 1,275.0 1,290.1 15.1 1.96 enriched
Slide 29: Benchmarking ASCU to Copper Developers
Benchmarking ASCU to Copper Developers 1.01x 1.00x P/NPV Market Cap $139 PEA NPV8% $312 0.71x Peer Average: 0.70x P/NAV 0.59x 0.58x 0.55x (Analyst Consensus Nav) 0.44x 0.48x 0.35x P/NPV Incl. Post IPO Net Cash FDITM Market Capitalization (US$M) $139(1) $570 $218 $1,264 $348 $557 $305 $436 Asset Name
Slide 30: Key Investment Highlights
Key Investment Highlights • Our Core Values Are Supported by an ESG Framework • Copper Market Fundamentals Are Strong • Mature Capital Structure • Experienced Leadership Team and Board with a Proven Track Record • Brownfield, Scalable Development Project in Tier 1 Jurisdiction • Robust Project Econo
Slide 31: Investor Relations Contact
Alison Dwoskin, CPIR Director, Investor Relations adwoskin@arizonasonoran.com +1 (647) 233-4348 (cell) George Ogilvie, P.Eng President, CEO & Director gogilvie@arizonasonoran.com +1 (416) 723-0458 (cell) www.arizonasonoran.com | www.cactusmine.com
Slide 32: Appendix
Appendix ASCU:TSX ARIZONASONORAN.COM 32
Slide 33: General Site Arrangement
General Site Arrangement Sources/Notes: 3D rendering of Figure 16-10 of Integrated Cactus PEA ASCU:TSX ARIZONASONORAN.COM 33
Slide 34: Simple Heap Leach & SXEW Flowsheet
Simple Heap Leach & SXEW Flowsheet • Leach material mined from the Stockpile Project and new mining operations will be placed in 20 ft (6 m) lifts on lined heap leach pads • The initial oxide materials pad is 8.5 million ft2 (790 thousand m2) to hold approximately 40 Mt of leach material (2-3 years
Slide 35: Integrated Cactus PEA Summary
Integrated Cactus PEA Summary Assumption / Outcome Value / Results(1) Copper Price MARKET US$3.35/lb CAPITALIZATION Total Mineralized Material Moved 179 Mt (US$M) Annual Average Processing Rate Over LOM 10 Mtpa Stockpile Project: CuAS: 90%, CuCN: 40% Average Recovery Rates Over LOM OP / UG: CuAS: 90
Slide 36: Strong Copper Market Fundamentals
Strong Copper Market Fundamentals Consistent Rising Demand from Key Sectors Supply Constraints To Meeting Primary Demand in Medium Term 50 Total Copper Consumption Forecast by Industry, 2000-2040 35 45 Base Case Production Capability 40 30 35 25 Primary Demand Copper (Mt) 30 Copper (Mt) 25 20 20 15
Arizona Sonoran Copper Company — Investor Presentation (November 2021) on 6ix