  1. Slide 1: Advancing Cactus, a Long-Life, Low-Cost Copper Project in Arizona

    ASCU:TSX ASCUF:OTCQX Advancing Cactus, a Long-Life, Low- Cost Copper Project in Arizona Invest in Sustainability | February 2026

  2. Slide 2: Cautionary Statements

    2 Cautionary Statements Non- Financial Measures: This presentation contains certain non-IFRS financial measures, including Capex, sustaining capital/capex, sustaining costs, EBITDA, C1 cash costs, free cash flow, AISC and AIC. The Company believes that these measures, together with measures determin

  3. Slide 3: Cautionary Statements: Forward-Looking Statements

    3 Cautionary Statements Forward-Looking Statements This presentation (including any accompanying commentary from the presenter) contains “forward-looking statements” and/or “forward-looking information” (collectively, “forward-looking statements”) within the meaning of applicable securities legislat

  4. Slide 4: Arizona Sonoran Investment Highlights

    4 Arizona Sonoran Investment Highlights Low-risk development Past producing copper mine, with 22-year project mine life in Arizona Tier 1 location - ARIZONA Focus on Simplicity Strong social license and Conventional Mining Methods and Heap Leaching known State-led permitting process Compelling econo

  5. Slide 5: Tight Capital Structure & Quality Ownership

    5 Tight Capital Structure & Quality Ownership CAPITAL STRUCTURE OWNERSHIP 9.9% Hudbay Market Capitalization C$1.4 B 21% 5% Nuton Shares Outstanding (M) 208.7 Institutional Options (M) 7.8 Management 3% RSU’s (M)(1) 1.0 Float DSU’s (M) 0.7 Index Inclusions: S&P/TSX Small Cap Fully Diluted Share Capit

  6. Slide 6: Efficient Open Pit Development at the Cactus Project

    6 Efficient Open Pit Development at the Cactus Project 100% Owned Cactus Project on Private Land in Casa Grande, AZ Water Power Roads / Adjacent to Social Cactus West •Onsite •Opportunity to Railroad the Industrial Support for area the Project and East permitted use 100% •Easy access water access cl

  7. Slide 7: Cactus PFS: Conventional Technology, Focusing on Simplicity and Execution

    7 Cactus PFS: Conventional Technology, Focusing on Simplicity and Execution Surface Mine, Heap Leach and SX/EW 513 million tons 0.52% CuT 5.3 billion pounds Industry Leading Capital Intensity LoM Material Mined LoM Grade Mineral Reserve Estimate $10,894 per tonne* Capital Intensity 75% 3,988 million

  8. Slide 8: Cactus PFS: Low Execution Risk and Strong Economics

    8 Cactus PFS: Low Execution Risk and Strong Economics $4.25/lb $6.00/lb NPV8% after-tax $2,301 M $4,711 M Cactus IRR after-tax 22.8% 35.9% West Deposit Payback Period 5.3 yrs 3.8 yrs Initial CAPEX* $977 M $977 M Parks/Salyer Deposit LOM FCF* $7,162 M $12,479 M Copper Cathodes Recovered over 22 year

  9. Slide 9: Optimized Mine Plan to Deliver Consistent Production and Cash Flows

    9 Optimized Mine Plan to Deliver Consistent Production and Cash Flows Execution plan of the oxides and enriched ores resulting in higher quality ore up front and consistent recoveries and free cash flows over the life of mine Cactus PFS Project Production Schedule PFS Production Profile • 513 millio

  10. Slide 10: Compelling Copper Price Sensitivities and Leverage to Copper Price

    10 Compelling Copper Price Sensitivities and Leverage to Copper Price Each 10% increase to the Copper Price, increases NPV after-tax by ~$600 million Project Metrics COPPER PRICE BASE CASE COMEX Price $3.75/lb $4.00/lb $4.25/lb $4.50/lb $5.00/lb $5.50/lb $6.00/lb $7.00/lb NPV8% Pre-Tax $ millions 2,

  11. Slide 11: Leading Profitability Index at the Cactus Project

    11 Leading Profitability Index at the Cactus Project Capex, NPV and Annual Production $3,000 150,000 Annual Production (Cu tonnes) Top 10 Copper Developers – North America PFS $2,500 Yrs 1-10 +50ktpa Developers In Millions of US$ $2,000 100,000 $1,500 NPV (after-tax) $1,000 50,000 Initial Capital Ex

  12. Slide 12: Cactus Would Rank as Third Largest Cathode Producer in the USA

    12 Cactus Would Rank as Third Largest Cathode Producer in the USA Mine County and State Owner Operation Processing Freeport (72%) 1 Morenci Greenlee, AZ Open Pit SX/EW & Conc Sumitomo (28%) Bingham 2 Salt Lake, UT Rio Tinto Open Pit Concentrator Canyon 3 Safford Graham, AZ Freeport-McMoRan Open Pit

  13. Slide 13: Disciplined Financing Strategy to Minimize Cost of Capital

    13 Disciplined Financing Strategy to Minimize Cost of Capital PFS economics provide strong platform for project financing based on DFS in 2H 2026 Currently engaging with ~15 financial groups: Favourable economics • Commercial banks supportive of initial capital debt financing: • Traditional project

  14. Slide 14: High Margin Copper Project at $4.25/lb Copper

    14 High Margin Copper Project at $4.25/lb Copper Annual Revenue, EBITDA and Free Cash Flow Profile $16.9 billion $1,500 LoM Revenue $1,000 $840 million US$ (in millions) $783 $662 $694 $755 $580 $619 $591 $649 $543 $500 $429 $494 Average Annual Revenue $293 $239 $282 $259 $190 $202 $181 $86 $0 $12 -

  15. Slide 15: Supportive Social License and Known State-led Permitting Process

    15 Supportive Social License and Known State-led Permitting Process Permits Casa Grande and Maricopa Counties • Received Dust Permit from Pinal County in January 2026 Social Licence • Permit amendments to include Parks/Salyer; the 2021 PEA is fully Somewhat Support permitted (Stockpile, CW, CE) (air

  16. Slide 16: Fully-funded to Deliver Major Catalysts in 2026

    16 Fully-funded to Deliver Major Catalysts in 2026 2026 Workstreams US$105M cash balance – US$75M Budget Activity Q1 2026 Q2 2026 Q3 2026 Q4 2026 Early Development Activities APS Engineering Geological and Geotechnical Infill to Measured Geotechnical / Hydrological Condemnation Operational Readiness

  17. Slide 17: Clear Next Steps at the Cactus Project

    17 CLEAR NEXT STEPS AT THE CACTUS PROJECT Path to Near Term Construction Decision and Onsite Cathode Production 2027- 2024 2025 2026 2028 Early Development 2029 Buy-down Royalties 24 month MRE Update Activities construction* First Cathode Appoint H&P Debt Project 2024 PEA Finalize Permits Production

  18. Slide 18: ASCU Value: +256% Year-over-Year

    ASCU Value: +256% Year-over-Year 18 Momentum and Accumulation Building as ASCU advances the Cactus Project $8.00 5,000 THOUSANDS HBM/Nuton $21.6M PP Closes ($1.68/share) C$86.3M PP 2026 Work 4,500 $7.00 Financing Closed Jan 31, 2025 Plan C$51.75 M (2.00/sh) Dec 2 Dust Jan 14 4,000 Bought Deal Closes

  19. Slide 19: Few Quality Developers Filling the Copper Supply Gap

    19 Few Quality Developers Filling the Copper Supply Gap Consensus P/NAV & Estimated Start Date Ratio | Estimated Production Date ~0.13x Gap to Average PFS Valuation ~0.20x Gap to Average FS Valuation Construction FS PFS PEA / Resource 2026 2030 2028 2030 2034 2028 2032 2029 2027 n.a. n.a. n.a. 2030

  20. Slide 20: Arizona Sonoran Valuation Waterfall

    20 Arizona Sonoran Valuation Waterfall Valuation Waterfall – Base Case $4.25/lb Cu 2,500 2,000 $2 million US$ Millions US$2,301 million 1,500 ~US$1.5 billion gap 1,000 500 US$850 million 0 Cactus NPV (after-tax 8%) Net Debt Market Capitalization Valuation Waterfall – Comex Pricing - $6.00/lb Cu 5,00

  21. Slide 21: Benchmarking ASCU Relative to Americas Copper Development Projects

    21 Benchmarking ASCU Relative to Americas Copper Development Projects Arizona Developers Americas Developers Other Arizona Projects Market Capitalization (US$M)(1) $887 $2,839 $607 $1,121 $1,026 $718 $500 $9,213 $2,704 P/NAV Multiple(2) 0.5x 1.1x 0.8x 0.7x 1.1x 0.4x 0.5x 1.4x 1.1x Cactus Santa Cruz

  22. Slide 22: Clear Path to Final Investment Decision as early as Q4 26

    22 Clear Path to Final Investment Decision as early as Q4 2026 VALUE QUALITY • Average annual production of LOW RISK 103,000 tonnes over first 10 Large Copper Porphyry Project years, would make Cactus the Brownfield (Low Capital) Management third largest copper cathode Open Pit Tier 1 Location produ

  23. Slide 23: Contact

    Alison Dwoskin, CPIR George Ogilvie, P.Eng Vice President, Investor Relations President, CEO & Director adwoskin@arizonasonoran.com gogilvie@arizonasonoran.com +1 (647) 233-4348 (cell) +1 (416) 723-0458 (cell) www.arizonasonoran.com | www.cactusmine.com

  24. Slide 24: Appendix

    Appendix

  25. Slide 25: Parks/Salyer – Heap Leach and SXEW Processing of Copper Cathodes

    25 Parks/Salyer – Heap Leach and SXEW Processing of Copper Cathodes PARKS/SALYER MINERAL RESERVES Conventional mining and premium copper grades Grade Grade Contained Contained Contained Contained Material Tons Cu Total Cu • Greenfield open pit Type kt CuT Tsol Total Cu Cu Tsol Short Total Cu % (k lb

  26. Slide 26: Cactus Layback - Heap Leach and SXEW Processing of Copper Cathodes

    26 Cactus Layback - Heap Leach and SXEW Processing of Copper Cathodes CACTUS WEST MINERAL RESERVES Conventional Mining Grade Grade Contained Contained Contained Contained Material Tons Cu Total Cu • Brownfield, open pit layback Type kt CuT Tsol Total Cu Cu Tsol Short Total Cu % (k lbs) (k lbs) Tonne

  27. Slide 27: Exploration Upside in the Casa Grande District

    27 Exploration Upside in the Casa Grande District A A’ Cactus Property W. Maricopa- Santa Cruz Casa Grande Gap Zone Hwy (approx.) A’ Exploration Opportunity A For further details on the Project, refer to the 2025 PFS Technical Report available on the Company’s website and on www.sedarplus.ca. See al

  28. Slide 28: Key PFS Advancements

    28 Key PFS Advancements Operations: • Streamlined mine plan leaches oxides and enriched ore from Parks/Salyer and Cactus West open pits, reducing estimated LOM but improving overall ore grade reporting to the processing circuit and simplifying the execution of the project • Primary Sulphides and Cac

  29. Slide 29: Three Sophisticated Large Cap Corporate Endorsements

    29 Three Sophisticated Large Cap Corporate Endorsements 2025 2025 2022 9.9% ownership Existing NSR purchase 6.0% ownership • Purchased for a 15% premium to • 2.5% NSR for US$55 million • Innovation venture of leading the 5-day VWAP • Subsequent ASCU buy down of global mining company • Observer on th

  30. Slide 30: Arizona Produces 70% of Copper Needs in the USA

    30 Arizona Produces 70% of Copper Needs in the USA Access road from the State hwy to Cactus Union Pacific Railroad parallel to the highway ASCU:TSX | ASCUF:OTCQX ARIZONASONORAN.COM

  31. Slide 31: Compelling Free Cash Flow Generation and Annual EBITDA Margins

    31 Compelling Free Cash Flow Generation and Annual EBITDA Margins Optimized Mine Plan and Cash Flows in PFS Focus on Leachable Ores with no effect to LOM Free Cash Flow Free Cash Flow 2025 PFS and Cumulative FCF to 2024 PFS $1,000,000 $10,000 US$ millions Cumulative $8,000 US$ (000’s) $500,000 $6,00

  32. Slide 32: Benchmarking: Junior Copper M&I and Grade vs. EV/lb

    32 Benchmarking: Junior Copper M&I and Grade vs. EV/lb M&I Copper Equivalent Mineral Resources, Millions of Tonnes and Grade 0.60% 0.51% 0.40% 0.50% 0.46% 0.54% 0.51% 0.42% 0.48% 0.60% 0.51% 0.80% 0.62% 1.00% 0.50% 5.39% 0.56% 2.40% 0.40% 1.53% 22.6 12.3 10.0 7.2 7.1 6.5 5.9 5.1 5.0 4.8 4.6 3.5 3.4

  33. Slide 33: Copper Producer Benchmarking (Enterprise Value and Production)

    33 Copper Producer Benchmarking (Enterprise Value and Production)(1) Rerate opportunity as Cactus advances to targeted cathode production in 2029 600 $10,000 2025 PFS $9,245 $9,205 $9,000 180 $8,000 Annual Production(1) (Mlbs CuEq) 150 Enterprise Value (US$M) $7,000 $6,050 $6,000 120 $5,000 90 $4,00

  34. Slide 34: Leading Capital Intensity – Greater Value for Capital Deployed

    34 Leading Capital Intensity – Greater Value for Capital Deployed Peer Benchmarking – Mine Life vs Capital Intensity (Based on Average Annual Copper Equivalent Production)(1) Years | Avg. Annual Capital Intensity | Bubble Size Based on Annual Production Milling SX/EW SX/EW & Milling $25,000 Santo Do

  35. Slide 35: Mining-Savvy Management Team with Track Record of Execution

    35 Mining-Savvy Management Team with Track Record of Execution George Ogilvie, P.Eng. Bernie Loyer Nick Nikolakakis, BASc, MBA PRESIDENT, CEO & DIRECTOR SENIOR VICE PRESIDENT, Projects VP FINANCE AND CFO +35 years of management, operating and technical +40 years building and delivering large scale m

  36. Slide 36: Experienced Board of Directors

    36 Experienced Board of Directors David Laing, B.Sc. Eng George Ogilvie, P.Eng. Isabella Bertani, FCPA, FCA CHAIR OF THE BOARD OF DIRECTORS PRESIDENT, CEO & DIRECTOR DIRECTOR +40 years experience in the mining industry with roles across +30 years of management, operating and technical experience in

  37. Slide 37: Average Annual Revenues of an estimated $962 million over first 10 years

    37 Average Annual Revenues of an estimated $962 million over first 10 years TABLE 4: LoM OPERATING COST AND CASH FLOW ESTIMATES ACTIVITY US$ (millions) US$ /ton Processed LOM REVENUE 16,948 - Mining Cost Breakdown Mining 3,518 6.86 Drilling and Blasting 7% Process Plant 1,297 2.53 Operating Cost Est

  38. Slide 38: ASCU is poised to be a low-cost copper producer

    38 ASCU is poised to be a low-cost copper producer LoM OPERATING AND PRODUCTION COST ESTIMATES LoM (US$) Cost Elements Total Cost ($M) $ / ton Processed $ / lb Copper $ / ton Mined 2nd Quartile Costs amongst Mine Operating Cost 3,518 6.86 0.88 1.59 global mining peers Process Plant Operating Cost 1,

  39. Slide 39: Strategic Capital Deployment for Strong Copper Returns

    39 Strategic Capital Deployment for Strong Copper Returns Initial Capex driven by expanded tank house capacity, site reconfiguration, and increased haulage capacity Sustaining Capex driven by heap leach pads, land payments and SXEW plant expansion TABLE 5: CAPITAL COST ESTIMATES Initial Capital Brea

  40. Slide 40: Cathodes Produced Onsite and Ready for End User

    40 Cathodes Produced Onsite and Ready for End User Simplified and Optimized Flow Sheet SIMPLE HEAP LEACH PROCESS: • Truck and shovel • Truck placement (years 1-3) • Conventional stacking (years 4-20) • Two-stage crushing and screening of all material types with crushing size of minus ¾” P80 size for

  41. Slide 41: Simple and Efficient General Plan Arrangement on 7,348 Acres

    41 Simple and Efficient General Plan Arrangement on 7,348 Acres For further details on the Cactus Project, refer to the 2025 PFS Technical Report available on the Company’s website and on www.sedarplus.ca. ASCU:TSX | ASCUF:OTCQX ARIZONASONORAN.COM 41 See also the Cautionary Statements on Slide 3 and

  42. Slide 42: ESG – Setting the Pace for Net Zero Carbon Emissions

    42 ESG – Setting the Pace for Net Zero Carbon Emissions ASCU is actively exploring use of renewable energy for its operations with the goal of becoming a “Net Zero Carbon Emissions” copper producer Ability to also reduce carbon footprint by Arizona Public Service’s transition to renewable resources

  43. Slide 43: Reactivating a Brownfields Property Using New Technologies

    24 Reactivating a Brownfields Property Using New Technologies ASARCO Sacaton ARIZONA SONORAN COPPER COMPANY Production of primary sulphides using US$20M Remediation Heap leach and SXEW operation considered flotation mill Complete 2019 2019- Next 1964 1974 1984 2023 2024 2025 2022 Steps* Sacaton Prod

  44. Slide 44: Cactus Project Mineral Reserve Estimate

    44 Cactus Project Mineral Reserve Estimate NOTES to Mineral Reserve Estimate table: Grade Grade Contained Contained Contained Contained 1. Mineral Reserves have an effective date of September 17, 2025. The Qualified Material Tons CuT Cu Total Cu Cu Tsol Total Cu Total Cu Person for the open pit esti

  45. Slide 45: Cactus Project Mineral Resource Estimate

    45 Cactus Project Mineral Resource Estimate NOTES to Mineral Resource Estimate table: Contained Contained 1.Mineral Resources are inclusive of Mineral Reserves Material Tons Grade Grade Total Cu (k Cu Tsol (k 2.Total soluble copper grades (Cu TSol) are reported using sequential assaying to calculate

  46. Slide 46: Technical Notes

    46 Technical Notes Cactus Project For more information on the Cactus Project, including the 2025 Pre-feasibility Study (the “PFS”) and Mineral Resource Estimates (or MRE) and Mineral Reserve Estimates (collectively, “MRMRE”) referenced in this presentation, refer to the NI 43-101 technical report en