NLMK · RUS:NLMK
NLMK — Investor Presentation (July 2013)
16 slides from NLMK's investor presentation, Jul 23, 2013

Slide 1: NLMK Kaluga
NLMK KALUGA 23 July 2013

Slide 2: Disclaimer
DISCLAIMER This document is confidential and has been prepared by NLMK (the “Company”) solely for use at the presentation of the Company and may not be reproduced, retransmitted or further distributed to any other person or published, in whole or in part, for any other purpose. This document does no

Slide 3: NLMK Group Russian Assets
NLMK GROUP RUSSIAN ASSETS NLMK Kaluga Crude steel: Stage 1 – 1.5 m t Long steel: Stage 2 – 0.9 m t Usinsky-3 Stage 3 (estimate) – 0.6 m t Coal deposit (Licence to develop) Zhernovskoye Coal deposit (Licence to develop) Moscow RUSSIA NLMK Kaluga Moscow Altai-Koks Coke: 4.66 m t США Kaluga VIZ-Steel T

Slide 4: NLMK Russia Long Division
NLMK RUSSIA LONG DIVISION • Part of NLMK Group since December 2007 • Capacities: o Steel (EAF) – 3.7 million t o Long products – 2.9 million t Moscow Yekaterinburg o Scrap – 3.5 million t NLMK Kaluga UZPS • Long product market share in Russia: c. 20% NSMMZ • Sales regions: over 95% of sales to the R

Slide 5: Strategic Goals
STRATEGIC GOALS • Strategic priorities NLMK RUSSIA LONG MARKET SHARE IN 2015 o Develop scrap-collecting facilities to maximize cost- 35% 33% efficient sufficiency in scrap 30% 25% 23% o Expand market presence 20% o A flexible sales strategy and improved customer 15% 12% service 10% o Expand the rang

Slide 6: NLMK Kaluga: Company Overview
NLMK KALUGA: COMPANY OVERVIEW • Location: Kaluga region, Borovsky district, Vorsino CRUDE STEEL AND ROLLED STEEL PRODUCTION CAPACITIES AT NLMK KALUGA Industrial Park, c.~70 km away from Moscow 1,6 m t/y 1,5 1,5 1,5 • Production site area: 202 ha 1,4 1,2 • Capacity: 1.5 m t/y of steel, 1 0,9 0,8 from

Slide 7: NLMK Kaluga Competitive Advantages
NLMK KALUGA COMPETITIVE ADVANTAGES o A developed construction sector o High level of long steel consumption The market o Shortage of long steel in the region o Surplus of scrap collection in the region o Low transportation costs Efficiency o Developed scrap collection network o Energy- and resource-

Slide 8: Construction Sector in Central Russia
CONSTRUCTION SECTOR IN CENTRAL RUSSIA • The Central region of Russia has the highest AMOUNT OF CONSTRUCTION ACTIVITIES IN 2012 density of population Moscow and the Moscow 17% o 59.5 people/km2, 7 times higher than the Russian region average Central Region w/o Moscow 8% and the Moscow region • The mo

Slide 9: Long Products Market
LONG PRODUCTS MARKET • Long product consumption exceeds pre-crisis levels REBAR MARKET, CONSUMPTION IN THE RUSSIAN FEDERATION o Consumption of long steel products used in construction in 2,5 mt Import, share in % ~20% 25% Russia in 2012 grew by 10% year-on-year to 15.6 m t record 2008 level 2,0 20%

Slide 10: Scrap Market
SCRAP MARKET • Significant export substitution potential in Russia SCRAP MARKET BALANCE IN RUSSIA m t/month Scrap exports, m t o Export accounts for ~29% (or 5.8 m t/y) of annual 3 In 2012, the share of export in 7 scrap processing volumes total scrap processing was ~29% 5,8 5,8 2,5 6 ~30% • Regiona

Slide 11: Cost Advantages
COST ADVANTAGES • Low transportation costs for the delivery of raw NLMK KALUGA VS. RUSSIAN PEERS materials and finished steel 105% 104% o Developed captive scrap collection network 100% 100% 100% 100% “Vtorchermet NLMK” in the region 95% o In 2013, a new shredder was launched in 90% Podolsk (Moscow

Slide 12: Equipment and Products
EQUIPMENT AND PRODUCTS • Equipment suppliers o Steelmaking - Siemens VAI o Long product rolling - SMS Meer • Universal high performance continuous rolling mill Rebar Sections o Ability to roll rebar at high speed and produce А500S bars in small and medium sections at a single line А240 bars complian

Slide 13: Corporate Responsibility
CORPORATE RESPONSIBILITY • Air protection o Modern dust and gas cleaning systems with efficiency of at least 99% o Emissions less than 1kg per tonne of steel (almost 7 times lower than for its Russian peers) • Water protection o Closed water supply system o Low level of natural water consumption due

Slide 14: Thank You!
THANK YOU! 14

Slide 15: Appendix
APPENDIX

Slide 16: NLMK Russia Long Division
NLMK RUSSIA LONG DIVISION NLMK RUSSIA LONG OPERATING CAPACITIES • Captive scrap processing 3.5 m t/y NLMK KALUGA • EAF steelmaking • EAF steelmaking capacities 2.2 m t/y 1.5 m t/y • Long products (Nizhniye Sergi) • Long product capacities 1 m t/y 0.9 – 1.5 m t/y • Long products (Berezovsky) 1 m t/y
Source: Internet Archive copy of nlmk.com
More decks from NLMK
нлмк — ESG Presentation (2025)21 slides · Dec 23, 2025
Q4 2021 Earnings Presentation27 slides · Feb 3, 2022
ESG Presentation (December 2021)32 slides · December 2021
Q3 2021 Earnings Presentation25 slides · Oct 21, 2021
Investor Presentation (October 2021)50 slides · October 2021
Q2 2021 Earnings Presentation26 slides · Jul 22, 2021