Slide 1: Annual General Meeting Presentation
For personal use only Annual General Meeting Presentation 29 November 2013 Greg Solomon 1
Slide 2: Tasman Project Locations
Tasman Project Locations For personal use only Lake Torrens (1803 km2) IOCGU Lucas Hill (627 km2) IOCGU Parkinson Dam (194 km2) Epithermal Au, Ag, Zn/Pb Central Gawler (832 km2) Au 2
Slide 3: Lake Torrens Project
Lake Torrens Project For personal use only Bouguer Gravity (+residual insert) EL 4322 3
Slide 4: Vulcan IOCGU - Summary
Vulcan IOCGU - Summary For personal use only • Very large hematite-dominant IOCGU system (~ 12km2) 30km north of Olympic Dam • 17 holes now completed: First stage- 2010-2011 -8 holes drilled by Tasman in its own right Second Stage- 2012-2013- 9 holes drilled by Tasman under Tasman/Rio Tinto (“RTX”)
Slide 5: Vulcan IOCGU Project
Vulcan IOCGU Project Residual Gravity Image showing Tasman Drilling For personal use only Footprint of Carrapateena deposit at same scale 5
Slide 6: Vulcan IOCGU - First Stage VUD 1-8
Vulcan IOCGU - First Stage VUD 1-8* For personal use only • 57 m of strong chalcopyrite/pyrite - VUD 3 • +160m “classic” min. hematite-rich breccias - VUD 7 • Classic zoning (bornite/chalcopyrite/pyrite) - VUD 8 • Re – Os dating of MoS2 confirms age at 1590 Ma (equivalent to other IOCGU deposits) *
Slide 7: VUD 3: High Grade Cu - Au - U3O8
VUD 3: High Grade Cu - Au - U3O8 For personal use only 0.34m at 5.9% Cu, 2.23g/t Au 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8 7
Slide 8: VUD 7: +160m of Hematite Breccia
VUD 7: +160m of Hematite Breccia For personal use only 8
Slide 9: VUD 8: Silica-Hematite Breccia
VUD 8: Silica-Hematite Breccia For personal use only (+ bornite - chalcopyrite) 9
Slide 10: Vulcan: Second Stage - VUD 9-17
Vulcan: Second Stage - VUD 9-17* For personal use only • VUD 11 137.0m at 0.14% Cu, 0.18g/t Au and 0.08kg/t U3O8, from 1027m • VUD 12 517.7m at 0.15% Cu and 0.04g/t Au from 819.7m • VUD 15 145m at 0.49% Cu, 0.26g/t Au, 1.21g/t Ag and 0.06kg/t U3O8 from 1191m, inc: - 52m at 0.87% Cu, 0.46g/t Au, 1.13
Slide 11: VUD 11: Hematite Rich Breccias
VUD 11: Hematite Rich Breccias For personal use only 11
Slide 12: VUD 12: Coarse Chalcopyrite in Hematite Rich Breccia
VUD 12:Coarse Chalcopyrite in Hematite For personal use only Rich Breccia 12
Slide 13: VUD 15: Hematite replacement textures
VUD 15: Hematite replacement textures For personal use only 13
Slide 14: VUD Remobilised mineralisation
VUD 15 Remobilised mineralisation For personal use only 14
Slide 15: Vulcan IOCGU: Other elements of interest
Vulcan IOCGU: Other elements of interest For personal use only • Palladium: – 137m at 130ppb Pd, inc. 20m at 280ppb Pd (VUD 11) – Max. value 3,000ppb Pd (VUD 7) • Molybdenum: – 11m at 0.09% Mo, max. value 0.41% Mo (VUD 3) • Iron: – 240m at 61% (hematite, VUD 9) – 186m at 60% (hematite, VUD 15) • Rar
Slide 16: Vulcan SG vs Fe (%)
Vulcan SG vs Fe (%) For personal use only 60% Fe 6.0 VUD7 5.5 VUD9 VUD11 VUD12 5.0 VUD15 4.5 4.0 3.5 3.0 2.5 0 10 20 30 40 50 60 70 16
Slide 17: Vulcan Project: Time Line
Vulcan Project: Time Line For personal use only 17
Slide 18: Competent Person's Statement
Competent Person’s Statement For personal use only The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists. Robert Smith and Michael Glass
Slide 19: Disclaimer
Disclaimer For personal use only The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors, Robert Smith and Michael Glasson at the time of writing. It is the nature of all scientific conclusions that they a