Slide 1: A compelling platinum story
A compelling platinum story y Bank of America Merrill Lynch Gl b l M Global Metals l and d Mi Mining i C Conference f May 2011

Slide 2: Disclaimer
Di l i Disclaimer The information presented in this presentation is of a general nature and the forward looking information, opinions and beliefs of the Company and its affiliates are based ono various market related assumptions. Changes in market circumstances after the production of the informatio

Slide 3: About RBPlat
About RBPlat 3

Slide 4: About Royal Bafokeng Platinum (RBPlat)
Ab t Royal About R l Bafokeng B f k Pl ti m (RBPlat) Platinum (RBPl t) • Black-owned and controlled, controlled mid-tier PGMs pro oducer • Assets located on Western Limb of Bushveld Co omplex, South Africa • 67% interest in Bafokeng Rasimone Platinum Mine M (BRPM), unincorporated JV with Anglo Plati

Slide 5: Prime location on the Western Limb
P i Prime llocation ti on th the W Western t n Limb Li b 5

Slide 6: A long and proud history
A long l and d proud d hi history t Royal Bafokeng Discussions between Merensky openca ast BRPM JV restructuring; JSE listing completed Nation purchases RBN and AngloPlat to commences RBPlat obtains 67% interest land form JV 1860s 1925 1990s 1997 1998 2002 Dec 2009 Jan 2010 Nov 2010 Platinum discove

Slide 7: Ownership structure
O Ownership hi structure t t Royal Bafokeng Hold dings Anglo Platinum Public Investors 100% 100% Royal Bafokeng Platinum m Holdings Rustenburg Platinum Mines 30 25% 30.25% 57.13% 12.62% 33% 100% Royal Bafokeng Reso ources 67% Bafokeng Rasimone Platin num Mine Project expansion Operations Styldrift I

Slide 8: Our strategy
O strategy Our t t • Achieve operational excellence at BRPM (optimising volumes and reducing costs) • Grow organically through Styldrift • g Styldrift Bring y II forward as an expansion p p j project • Build flexibility in the business with co-ex xtraction • Pursue value enhancing acquisitions and s

Slide 9: Successful IPO
S Successful f l IPO • JSE listing completed November 2010 Geographical spread of public investo • share code: RBP • R2.98 billion raised (R1bn attributablle to RBPlat) 4% 1% 1% 5% • significantly oversubscribed • strong offshore support 12% • 164,095,215 shares in issue • 5 343 shareholders at 31 D

Slide 10: Our business
Our business qa? ROYAL BAFOKENG www.bafokengplatinum.co.za 10

Slide 11: Well-established shallow Merensky producer
Well established shallow Merensk Well-established ky producer on Western Limb, well-developedd infrastructure • 12 years of operation • well-understood, defined geology • sophisticated 3D seismic exploration • Shallow depth • Boschkoppie mine: twin decline shaftt complex at 500m • Styldrift I projec

Slide 12: Well-established shallow Merensky producer (continued)
Well-established W ll t bli h d shallow h ll M Merensky ky producer d on Western Limb, well-developed infrastructure (continued) • Focus on Merensky, Merensky with significant qua ality UG2 • Merensky production growth at Styldrrift I from 2017 • UG2 to gradually replace Merensky prroduction from 20

Slide 13: Attractive margins with scope for cost reduction
A Attractive i margins i with i h scope ffor cost reduction d i • High grade, grade attractive prill split • significant base metal revenue contrribution (nickel 11% in 2010) • Improvement opportunities • continued i d optimisation i i i off production d i n volumes l • cost optimisation through exp

Slide 14: Poised to grow organically and through consolidation
Poised to grow organically and d through consolidation • High-grade resource base with organic gro owth potential • Supportive, well capitalised shareholders • Leading internal growth projects on last remaining r shallow M Merensky k reeff • increase in production planned with Styldrift S I project

Slide 15: Poised to grow organically and through consolidation (continued)
Poised to grow organically and d through consolidation (continu ued) • Boschkoppie based on current LOF plan Boschkoppie, ns • production expected to be maintaine ed at 2.4mtpa until 2033 • UG2 to be introduced from 2014 • Styldrift I, based on current approved plans • R11.8 billion expansion projec

Slide 16: Value-enhancing transactions with Impala
Poised to grow organically and d through consolidation (continu ued) Value-enhancing transactions with Impala • K commercial Key i l tterms agreed d on: • 7-year mining arrangement with Impala a via Impala’s #6 & 8 shafts Wesizwe • resource of 780koz of UG2 Project 2 • 30-year mining arrangement wit

Slide 17: Our operations
+= 5 — ti = <x < N cok = 8 zo oS: 5 4 a . i 2 ay z i : = b , ‘ ite us ae pogh ‘ a ' a Give s —/ ( ar palae Fs Our operations

Slide 18: Safety and Health
S f t and Safety d Health H lth • LTIFR improved 15% to 1.0 per 200 000 hours h worked in FY2010 • Three fatalities in FY2010 • Safety strategy focused on high-energy high energy rrelated events LTIFR FIFR 3 0.04 0.03 2 0.02 1 0.01 0 0 2008 2009 2010 2008 2009 2010 18

Slide 19: Geology, layout and access
G l Geology, llayoutt and d access BRPM layout Shaft layout Vent shaft (surface to level 9) Chairlift decline Belt decline Material decline Level 9 Vertical dams Level 10 Source: Company Orebody access North Shaft South Shaft Samp ple prep Ore co onveyed to plant Belt riding 19

Slide 20: Resource optimisation strategy and exploration
R Resource optimisation i i i strategy a and d exploration l i • Geology 3D seismic survey • well-understood, high-quality orebod dy • total drillholes: 5,327 • intersection points: 7,787 7 787 • total drilled metres: 1,200km • aeromagnetic and 3D seismic surveyss Exploration drilling Aeromagnetic s

Slide 21: Production
P d ti Production • Smooth operational handover from 4 January 2010 • Operational strategy aimed at optimising throughput and revenue • tonnes milled — increased byy 12% to t 2.41Mt • improved stoping crew efficiency, inttroduction of UG2, plant maintenance • Head grade dropped 5% to 4.31g/t Descrip

Slide 22: On-mine cash costs
O On-mine i cash h costs t • On-mine cash costs steady at R707/t mille ed • Lower grade negatively affects per ounce e costs • Business improvement p strategy gy implemen p ted in Q3 2010 2010 2009 % change Labour Employe ees 6 793 6 605 3 On-mine cash cost/tonne milled R/t 707 704 — On-mine cash co

Slide 23: Boschkoppie replacement projects
B Boschkoppie hk i replacement l t projjjects t • Boschkoppie Phase II • R2.43 billion Merensky replacement project, p extension of the Phase 1 north and south shaft comple exes • started 2005, 2005 nearing completion • North shaft scheduled for completionn May 2011 • South shaft scheduled for compl

Slide 24: Boschkoppie production profile
B Boschkoppie hk i production d ti profil file kt Revised Bosschkoppie production 3,000 2,500 2,000 1,500 1,000 500 ‐ 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Boschkoppie South ‐ Merensky Boschkoppie South ‐ UG2 Boschkoppie North ‐ Merensky Boschkoppie North ‐ UG2 24

Slide 25: Styldrift I Project
St ld ift I Project Styldrift P j t • R11 8 billion expansion project R11.8 • Project commenced in Q1 2009, productio on scheduled to ramp up from 2015 • Surface earthworks and civil construction materiallyy complete p • Shaft sinking (early pre-sink) commenced in Q4 2010, • currently at 60m depth a

Slide 26: Progress at Styldrift
P Progress att Styldrift St ld ift 26

Slide 27: Styldrift I production profile
St ld ift I production Styldrift d ti profile fil kt Styldrift I production 3,000 2,500 2,000 1,500 1,000 500 ‐ 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Styldriftt I – Merensky 27

Slide 28: Resources and reserves
R Resources and d reserves 100% Inclusive R Resource RBPlat 67% Description Mt 4E g/t 4eMoz Mt 4E g/t 4eMoz Boschkoppie Merensky Measured 15.15 7.42 3.62 10.15 7.42 2.42 Indicated 11 45 11.45 6 94 6.94 2 55 2.55 7 67 7.67 6 94 6.94 1 71 1.71 Inferred 8.05 7.63 1.98 5.39 7.63 1.32 MR Total 34.65 7.31

Slide 29: Capex and funding
Capex and funding 29

Slide 30: Capital expenditure
C it l expenditure Capital dit 1,200,000 1,000,000 800,000 on R millio 600,000 400,000 200,000 ‐ FY2010 FY2009 FY2008 Boschkoppie Phase 2 Boschkoppie Phase 3 Styldrift UG2 2 Feasibility MIG plant SIB Concentrator upgrade Other 30

Slide 31: Funding
F di Funding • R250 million facility for funding of intra-m month working capital • Unused R500 million revolving credit facillity • Policyy not to hedge g F di off Styldrift Funding St ld ift I Project P j t Cash from Equity Operations 22% 50% Debt 28% 31

Slide 32: Our investment case
Our investment case za www. bafokengplatinum.co

Slide 33: Market fundamentals
M k t fundamentals Market f d t l • Encouraging price performance across PGM metals • Driven by market deficit, mine reserve de epletion in medium to longer term • ETF demand remains steady • Physical demand recovery anticipated forr 2012 PGM prices Jan 200 08 ‐ Apr 2011 ($/oz) 2 500 2,500 12 000 12

Slide 34: Platinum market balance
Pl ti Platinum market k tbbalance l '000oz Secondary Supply Russia 12,000 North America Zimbabwe South Africa Adjusted Supp ply Demand Demand incl. ETFs E 10 000 10,000 8,000 6,000 4,000 2,000 0 2005 2006 2007 2008 2009 2010E 2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F 2020F Source: SFA (O

Slide 35: A compelling story
A compelling lli story t • Compelling sector with strong demand and supply fundamentals • Well-established, shallow, Western Limb b Merensky producer with well well-developed developed infrastructure • Attractive margin operations with scope for cost reduction • Experienced management team with clea

Slide 36: Thank you
Thank you
Source: company website
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
H1 2020 Earnings Presentation39 slides · 2020
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019