Slide 1: A New Mining Prescription of Low-Cost Supply (The Styldrift Project)
A NEW MINING PRESCRIPTION OF LOW-COST SUPPLY (THE STYLDRIFT PROJECT) STEVE PHIRI SFA OXFORD THE OXFORD PLATINUM LECTURES 15 MAY 2015
Slide 2: Disclaimer
Disclaimer The information presented in this presentation is of a general nature and the forward-looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im
Slide 3: Contents
CONTENTS 1. Our approach in a challenging environment 2. Styldrift I and II 3. Conclusion
Slide 4: Tailored strategies drive efficiencies and create value
Tailored strategies drive efficiencies and create value Towards operational Pursue value enhancing Build flexibility Grow organically excellence opportunities • LTIFR and SIFR have improved • Effective operational flexibility • Focus on high grade Merensky • Secured two value adding by 47% and 46% r
Slide 5: Since 2011 the South African PGM market has been characterised by
Since 2011 the South African PGM market has been characterised by Falling PGM demand Sovereign debt crisis •Expect medium to longer term rebound Slow economic growth •Strategically develop quality assets - Styldrift I and II Escalating input costs •Maintain the first quartile producer position Minin
Styldrift Mine – A high-grade, shallow, mechanised Merensky mine High quality Shallow Key operating Production ramp Merensky Merensky Mine statistics up Resource grade of 6.94g/t 4E R11 billion capital Mechanised mining First production Q1 2016 investment Resource of 72.90Mt 320koz 4E per annum Stea
Slide 8: Styldrift is a well advanced high-margin project with substantial by-product credits
Styldrift is a well advanced high-margin project with substantial by-product credits Styldrift I orebody strategy High quality resource 16 Bubble size = resource oz (4E) • Merensky resource of 133Mt Styldrift I Merensky, Resource valuation ($/4E oz) 15 72.9Mt Styldrift I portion is 92.9Mt 14 • UG2
Slide 9: Styldrift is a well advanced high margin project with substantial base metal credits
Styldrift is a well advanced high margin project with substantial base metal credits Styldrift is in the first quartile for by-product credits Base metals content at Styldrift well above Revenue from PGMs (4E) Revenue from base metals 100% South Africa average 19% 16% 7% 80% • South African producti
Slide 10: Styldrift II pre-feasibility provides positive business case
Styldrift II pre-feasibility provides positive business case Pre-feasibility study • Study resulted in a positive business case • Mechanised mine design • Early access utilising Styldrift I infrastructure • Feasibility starts in Q2 2015 > Power and water supply applications > EIA approval process >
Slide 11: Conclusion
CONCLUSION >
Slide 12: Royal Bafokeng Platinum: An attractive investment proposition
Royal Bafokeng Platinum : An attractive investment proposition Lower political risk Black-owned and controlled - exceeds all statutory BEE requirements Lower labour risk Employees and owners are aligned Long-life assets Long life Merensky producer Excellent growth Low risk growth: +/- 70% increase i