    14 October 2025 ASX:MM8 Investor Presentation For personal use only Medallion Metals Limited Managing Director, Paul Bennett will be providing a range of investor updates this week including a presentation to the Australian Gold Conference. The presentation to be delivered is attached. This announce

  2. Slide 2: Ravensthorpe-Forrestania Sulphide Production Strategy

    ASX: MM8 medallionmetals.com.au For personal use only Ravensthorpe- Forrestania Sulphide Production Strategy Rapid pathway to strong cashflows, leveraging infrastructure to unlock value and returns Investor Presentation OCTOBER 2025

  3. Slide 3: Important Notices

    Important Notices (Read in conjunction with Appendices 6 & 7) Nature of Document This presentation has been prepared and issued by Medallion Metals Ltd (Company) to provide general information about the Com pany. The information in this document is in summary form and should not be relied upon as a

  4. Slide 4: Investment Highlights: Rapid, Low Capex, High Margin Gold Production

    Investment Highlights: Rapid, Low Capex, High Margin Gold Production Attractively priced near-term Western Australian gold production opportunity For personal use only Asset Quality Valuation Upside Strategic Positioning 1.2Moz AuEq1,2 Strong returns Infrastructure, Global Mineral Resource at Ravens

  5. Slide 5: Corporate Overview

    Corporate Overview ASX: MM8 Price/Volume (12 months) 0.70 5.0 For personal use only 0.60 4.0 0.50 Volume (M) 0.40 3.0 John Fitzgerald Paul Bennett David Kelly Siobhan Pelliccia $/share Non-Executive Chair Managing Director Non-Executive Non-Executive 0.30 2.0 Director Director 0.20 1.0 0.10 0.00 0.0

  6. Slide 6: Sulphide Production Strategy

    Sulphide Production Strategy Low-capex, low-risk, rapid path to production and near-term cashflow For personal use only Resource + Infrastructure = Cashflow Leverage FNO infrastructure − Flotation plant, TSF, grid power − Camp, airstrip, supporting infrastructure & Bring Ravensthorpe Mineral systems

  7. Slide 7: Scoping Study Production Metrics

    Scoping Study Production Metrics High grade, high recovery of gold-copper-silver to concentrate & ore Refer to Appendix 3 for further information relating to the Scoping Study. For personal use only 2.7Mt @ 3.9g/t Au & 0.6% Cu 0.5Mt per annum 5.5 years Dore & Concentrate 98% Au, 80% Cu 70kozpa AuEq

  8. Slide 8: Scoping Study Financial Metrics

    Scoping Study Financial Metrics Modest upfront capital and rapid payback deliver outstanding risk adjusted returns on investment Refer to Appendix 3 for further information relating to the Scoping Study. For personal use only Levered to Growth Financial Base Spot (11/9/25) Project Cashflow (base cas

  9. Slide 9: RGP Mineral Resource

    RGP Mineral Resource Significant mineral system within 400m of surface, open in multiple directions Refer to Appendices 1 & 2 for further information relating to RGP Mineral Resources. Isometric projection of Kundip MRE, looking down and to the east. For personal use only 2.5km system strike length,

  10. Slide 10: District Scale Growth Opportunity

    District Scale Growth Opportunity Multiple opportunities to develop the Forrestania-Ravensthorpe belts into a significant gold producing region Forrestania Greenstone Belt For personal use only (FGB) Discovery Potential Highly prospective Underexplored ~1.3Moz @ 5g/t Au ~160km strike tenement packag

  11. Slide 11: Pathway to FID and First Cashflow

    Pathway to FID and First Cashflow Multiple catalysts for potential re-rating as Medallion advances workstreams to achieve Final Investment Decision (FID) and progress to production Q3 CY25 Q4 CY25 Q1 CY26 Q2 CY26 Q3 CY26 Q4 CY26 For personal use only CORPORATE Exclusivity Binding Documents Transacti

  12. Slide 12: Why Invest in Medallion Metals

    ASX : MM8 Why Invest in Medallion Metals Low risk and rapid transition to high margin producer in Western Australia For personal use only Medallion Value Proposition Grade + Scale Tier-1 Jurisdiction Clear Plan 5.7Mt @ 4.6g/t Au + 0.6% Cu; WA, permits advanced, Path to +70kozpa, dominant sulphide on

  13. Slide 13: Appendices

    12 For personal use only Appendices

  14. Slide 14: RGP Mineral Resources – Sulphide Subset

    Appendix 1 RGP Mineral Resources – Sulphide Subset Mineral resource estimate for the Ravensthorpe Gold Project (fresh component) For personal use only Mineral resources estimate for the Kundip Mining Centre – COG > 2.0g/t AuEq, August 2025 Total Resources kt Au g/t Au koz Cu % Cu kt Indicated 3,150

  15. Slide 15: RGP Mineral Resources - Global

    Appendix 2 RGP Mineral Resources - Global Mineral resource estimate for the Ravensthorpe Gold Project, August 2025 For personal use only Mineral resources estimate for the Kundip Mining Centre – August 2025 INDICATED INFERRED TOTAL RESOURCES kt Au g/t Au koz Cu % Cu kt kt Au g/t Au koz Cu % Cu kt kt

  16. Slide 16: Scoping Study Outcomes & Assumptions

    Appendix 3 Scoping Study Outcomes & Assumptions Project Statistics Parameter Units Base Case Spot Pricing Production Study Highlights: Mill throughput rate ktpa 500 500 • Initial production inventory of 2.7Mt @ 3.9 g/t Au & 0.6 % Cu for 342 koz Au & 16 kt Cu contained Life of mine years 5.5 5.5 • To

  17. Slide 17: Forrestania Asset Sale Agreement – Summary Terms

    Appendix 4 Forrestania Asset Sale Agreement – Summary Terms Binding, conditional agreement to acquire the Forrestania Nickel Operation (FNO), between Medallion & IGO Ltd (Transaction) For personal use only Transaction Transaction Rights & Obligations Conditions Precedent Assets Consideration post Tr

  18. Slide 18: Approvals Pathway – Advanced Status

    Appendix 5 Approvals Pathway – Advanced Status Forrestania fully permitted, Ravensthorpe significantly advanced For personal use only EPBC Act (Cth) EP Act (WA) Mining Act (WA) − Environment Protection and Biodiversity − Ministerial Statement 1143 allows − EPBC Act & EP Act = Primary Approvals Conse

  19. Slide 19: Additional Disclosures

    Appendix 6 Additional Disclosures Cautionary Statement The Scoping Study (Study) referred to in this presentation has been undertaken by Medallion to evaluate the technical and com mercial viability of establishing an underground mining operation at its Ravensthorpe Gold Project and trucking of the

  20. Slide 20: Risk Factors

    Appendix 7 Risk Factors Exploration & Development The reader should understand that mineral exploration and development are high-risk undertakings. There can be no assurance that future exploration of the Company’s tenements, or any other mineral licences that may be acquired in the future, will For