Medallion Metal Ltd · ASX:MM8
Medallion Metal — Medallion Metals — Canaccord Noosa Mining Conference (November 2026)
19 slides from Medallion Metal's conference presentation, Nov 11, 2026
Slide 1: Building a Scalable WA Gold Producer
rsonal use only Building a Scalable WA Gold Producer November 2026 ASX:MM8 medallionmetals.com.au
Slide 2: Important Notices
Important Notices (Read in conjunction with Appendices 4 & 5) ASX:MM8 Nature of Document This presentation has been prepared and issued by Medallion Metals Ltd (Company) to provide general information about the Company. The information in this document is in summary form and should not be relied rso
Slide 3: Capital Light | Strong Margins | Growth Optionality
Capital Light | Strong Margins | Growth Optionality ASX:MM8 rsonal use only Ravensthorpe Gold Project Forrestania Gold Project Production Profile Growth 950koz @ 5.2 g/t AuEq Infrastructure + Production Dual Production Assets 1,2 75kozpa Initial Production Rate Cosmic Boy Processing Plant Early Prod
Slide 4: Corporate Overview
Corporate Overview Board & Management rsonal use only Capital Structure (as at 2/11/26) 928m Shares on issue $353m $0.38 JOHN FITZGERALD NON-EXECUTIVE CHAIR PAUL BENNETT MANAGING DIRECTOR DAVID KELLY NON-EXECUTIVE DIRECTOR SIOBHAN PELLICCIA NON-EXECUTIVE DIRECTOR Market cap Share price $97m 32m Cash
Slide 5: Feasibility Study | Strong Project Economics
Feasibility Study | Strong Project Economics ASX:MM8 Capital-efficient pathway to ~ 80kozpa AuEq with clear Growth Strategy rsonal use only Base Case Metrics 77kozpa $2,279/oz $861M $443M 87% 1YR (A$5,200/oz) AVG METAL PROD. AISC PROJECT NPV(8) IRR PAYBACK *pre-tax CASHFLOW Project Capex $138M Produ
Slide 6: Early Processing Strategy
Early Processing Strategy ASX:MM8 Low capital, Low risk, Revenue generation rsonal use only Existing Plant Activated to Recover Gold Carbon Stripping & Dore Smelt with Third Party $2.1M Implementation Capital, Rapid Payback 260kt Contracted to Date @ $100/t Stable Revenue Source Early Cashflow Opera
Slide 7: Kundip Mining Centre (KMC)
Kundip Mining Centre (KMC) ASX:MM8 Sulphide MRE: 950koz AuEq @ 5.2g/t AuEq rsonal use only 1.1Moz Global MRE Significant Mineralised 120km+ Drilled System Shallowly drilled for an Archaean Gold Lode Lodes open at depth and along strike New lode positions confirmed at Gem & Harbour View Increasing Cu
Slide 8: Forrestania Gold Project (FGP)
Forrestania Gold Project (FGP) ASX:MM8 Infrastructure with embedded option on gold discovery rsonal use only 900km2 Tenement Package, dominant greenstone position Historical & Fertile Goldfield (Bounty 1.3Moz @ 5g/t) Mature field underexplored for gold Extensive Dataset: Drilling, Geochem & Geophys
Slide 9: Lounge Lizard
Lounge Lizard ASX:MM8 Emerging Second Feed Source for Cosmic Boy rsonal use only Large Historical Dataset (450 drill holes) Drilled over 1km strike @ 25m centres Drilling to > 450m depth, open at depth/strike 3,000m drill program underway Mineral Resource update pending Option Study for Second Feed
Slide 10: Development Pathway
Development Pathway On ground activity across RGP & FGP rsonal use only 10
Slide 11: Pathway to Production
Pathway to Production ASX:MM8 Key Development Milestones Across Ravensthorpe and Forrestania rsonal use only Q2 2026 Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 RAVENSTHORPE (RGP) KMC Drilling KMC Approvals Mine Site Early Works Mine Development First Ore & Stable Production FORRESTANIA (FGP) Forrestani
Slide 12: Building a Scalable Gold Business
Building a Scalable Gold Business Production Base, Infrastructure Advantage and Multiple Long-Term Growth Options rsonal use only Assets, Team & Production Clear Pathway Strategy Re-rate Attractively priced & Permitted, Funded & Capital efficient, rapid & backable business Executing low risk path to
Slide 13: Appendices
rsonal use only Appendices
Slide 14: RGP Mineral Resources – Sulphide Subset
Appendix 1 RGP Mineral Resources – Sulphide Subset ASX:MM8 Mineral Resource Estimate for the Ravensthorpe Gold Project (fresh component) rsonal use only Mineral Resources Estimate for the Kundip Mining Centre – COG > 2.0g/t AuEq, August 2025 Total Resources kt Au g/t Au koz Cu % Cu kt AuEq g/t AuEq
Slide 15: RGP Mineral Resources - Global
Appendix 2 RGP Mineral Resources - Global ASX:MM8 Mineral Resource Estimate for the Ravensthorpe Gold Project, August 2025 rsonal use only Mineral resources estimate for the Kundip Mining Centre – August 2025 INDICATED INFERRED TOTAL RESOURCES kt Au g/t Au koz Cu % Cu kt kt Au g/t Au koz Cu % Cu kt
Slide 16: Project Statistics
Project Statistics Appendix 3 Parameter Units Base Case Spot Pricing Production Feasibility Outcomes & Assumptions Mill throughput rate Life of mine ktpa years 650 5.7 650 5.7 ASX:MM8 Ore mined and processed Mt 3.5 3.5 Study Highlights: Au grade g/t 3.6 3.6 rsonal use only • Initial production inven
Slide 17: Additional Disclosures
Appendix 4 Additional Disclosures ASX:MM8 Cautionary Statement The Feasibility Study (Study) referred to in this presentation has been undertaken by Medallion to evaluate the technical and commercial viability of establishing an underground mining operation at its Ravensthorpe Gold Project and truck
Slide 18: Risk Factors
Appendix 5 Risk Factors ASX:MM8 Exploration & Development The reader should understand that mineral exploration and development are high-risk undertakings. There can be no assurance that future exploration of the Company’s tenements, or any other mineral rsonal use only licences that may be acquired
Slide 19: Contact
rsonal use only CONTACT MAIN OFFICE PROJECTS info@medallionmetals.com.au Level 1, 50 Kings Park Road, 91 Queen Street, West Perth WA 6005 Ravensthorpe WA 6346 medallionmetals.com.au (08) 6424 8700 Cosmic Boy Concentrator, @MM8_Medallion Cosmic Boy-Diggers Rocks Rd, Forrestania WA
Medallion Metals — Canaccord Noosa Mining Conference (November 2026) on 6ix