Slide 1: Outlook for the Powder River Basin
Outlook for the Powder River Basin June 28, 2010 Rocky Mountain Coal Mining Institute Conference

Slide 2: Powder River Basin - Outline
Powder River Basin - Outline • Basin overview • Production and stripping ratios • Safety statistics • Delivered coal prices and transportation • Market threats and opportunities • Alpha PRB operations

Slide 3: Forward looking statements
Forward looking statements Statements in this presentation which are not statements of historical fact are “forward-looking statements” within the “safe harbor” provision of the Private Securities Litigation Reform Act of 1995. These forward- looking statements are based on the information available

Slide 4: Powder River Basin Overview
Powder River Basin Overview Source: U.S. Geological Survey Open-File Report 2008-1202 Bureau of Land Management • There are 20 mines located in the PRB, 13 of which are located in the Wyoming portion. • One out of every five US homes and businesses is powered by coal mined in Wyoming. • The largest

Slide 5: Gillette PRB Coal Field
Gillette PRB Coal Field Northern Mines -74 million tons -8,000-8,400 Btu/lb Central Mines -101 million tons -8,400-8,600 Btu/lb Southern Mines -242 million tons -8,600-8,800 Btu/lb Total 2009 Gillette Coal Field Production: 417 million tons Source: MSHA 7000-2, Velocity Suite

Slide 6: Historical PRB Production
Historical PRB Production • PRB production has steadily increased over the last twenty years with the exception of a dip in 2009. • The EIA estimates that PRB production will reach 474 million tons in 2010. • Other basins have fluctuating production levels whereas PRB has demonstrated a consistent u

Slide 7: 2009 Top Producers and Production
2009 Top Producers and Production • Peabody, Arch, Cloud Peak, Alpha and Peter Kiewit are the top 5 producers in the PRB. • The top 5 producers account for 93% of basin production. • PRB accounts for approximately 41% of US coal production. • Low price, low sulfur, and desirable combustion character

Slide 8: As mines expand westward, stripping ratios increase
• As mines expand westward, stripping ratios (and costs) increase due to greater overburden and thinning seams. • Mines in the Southern part of the region will need to cross over to the other side of the Joint Line. • The USGS estimates that over 1 B tons of coal may be left un-mined beneath the Joi

Slide 9: Reportable Injury Rates by Basin
Reportable Injury Rates by Basin • PRB had only 1 injury for every 3.2 million tons of coal mined on annual basis. • Two-thirds of US coal mines operate each year without a single lost time work injury. • Between 1990 and 2008, there was a 70% decrease in total US coal mining injuries. Source: MSHA

Slide 10: U.S. Coal-Fired Power Plants by Coal Origin
U.S. Coal-Fired Power Plants by Coal Origin Source: Velocity Suite

Slide 11: Significant Increase in PRB Exports
Significant Increase in PRB Exports Source: Genscape • PRB exports have steadily increased over time. • Thriving Asian coal demand has led to a significant increase of PRB exports. • PRB coal compares favorably to Indonesia coal.

Slide 12: Transportation costs dwarf FOB costs in the PRB
• Unlike the other basins, transportation costs dwarf FOB costs in the PRB. • PRB is a very competitive basin provided that rail rates remain reasonable. • Average transportation cost in PRB is $1/MMBtu. For other basins, the average transportation cost is $0.47/MMBtu. • Average coal price in PRB is

Slide 13: PRB Challenges -- Regulatory Issues
PRB Challenges -- Regulatory Issues • Section 404 Water Permit – Section 404 of the Clean Water Act regulates the discharge of dredged, excavated, or fill material in wetlands, streams, rivers, and other U.S. waters. – Like the East, the 404 issue will affect the PRB. – The Nationwide Permit 21 will

Slide 14: Illinois Basin Challenge
Illinois Basin Challenge • Increased scrubbers, lower SO2 allowance prices, low mining costs and advantageous transportation options may allow ILB coal to displace PRB coal at some units. • PRB is losing its low sulfur advantage due to more scrubbers coming online and low allowance prices. • Average

Slide 15: Natural Gas Challenge -- Delivered Basin Cost
Natural Gas Challenge -- Delivered Basin Cost Source: EIA 923, Velocity Suite, ANR • PRB costs are more competitive when delivered to Western and Midwestern plants. • PRB delivered costs: • Western $1.34 • Midwestern $1.85 • Eastern $3.27 • Southeastern $3.44

Slide 16: Natural Gas Challenge - Generation Costs
Natural Gas Challenge - Generation Costs • Gas is much more competitive in the Southeast and Eastern regions. • Gas generation costs don’t pose much threat to the PRB at today’s prices. • If delivered coal prices climb high enough or gas prices fall low enough, all basins could be at risk. Heat rate

Slide 17: Market Opportunities
Market Opportunities • A decline in CAPP production due to MTR regulations and 404 permits could present more opportunities for PRB coal. • There are 13 plants currently under construction that will primarily burn PRB coal. These plants total approximately 7,000 MW which equates to around 24 million

Slide 18: Alpha 2009 Sales & Production Overview
Alpha 2009 Sales & Production Overview 2009 Coal Sales* 2009 Production * Coal sales include broker coal

Slide 19: Alpha Coal West - 2009 (Belle Ayr, Eagle Butte)
Belle Ayr Eagle Butte Alpha Coal West - 2009 • BNSF/UP rail access • 28.4 million tons • 8,550 Btu, 0.63 Lb. SO 2 /MMBtu • 255 MM tons reserves • BNSF rail access • 21.9 million tons • 8,420 Btu, 0.88 Lb. SO 2 /MMBtu • 505 MM tons reserves § Truck/shovel mining method § 630 employees

Slide 20: Summary
Summary • All coal basins have challenges, but the PRB’s challenges are more manageable. • PRB should be able to continue to provide a significant portion of US coal for many years to come and new international markets may emerge. • Alpha is well-positioned as one of the top 5 PRB producers.
Source: SEC EDGAR · 8-K filed Jun 28, 2010
More decks from Alpha Natural Resources Inc
J.P. Morgan Global High Yield & Leveraged Finance Conference (February 2015)36 slides · Feb 23, 2015
Barclays CEO Energy-Power Conference 201435 slides · Sep 2, 2014
2014 BMO 23rd Global Metals and Mining Conference; Sterne Agee 2014 Boston Executive Summi33 slides · Jun 17, 2014
2014 BMO 23rd Global Metals and Mining Conference / Brean Capital 2014 Global Resources &30 slides · May 28, 2014
2014 BMO 23rd Global Metals and Mining Conference30 slides · Feb 24, 2014
Tuohy Brothers' 4th Annual Energy Conference (August 2013)26 slides · Aug 5, 2013