  1. Slide 1: Advancing the 2.8Moz Misima Gold Project

    Advancing the 2.8Moz Misima Gold Project ACN 009 148 529 November 2018 T: +61 2 8021 7492 For personal use only www.kingstonresources.com.au Misima Mine, mid 1990’s

  2. Slide 2: Focused gold company with two advanced exploration projects

    Kingston AGM 2018 Focused gold company with two advanced exploration projects For personal use only • Misima Gold Project (70%) 2.8Moz1 JORC • Livingstone Gold Project (75%) highly prospective Resource, historical, highly profitable large scale location within the Bryah Basin, with multiple open pit

  3. Slide 3: Misima Gold Project (70%) – Existing 2.8Moz resource

    Misima Gold Project (70%) Existing 2.8Moz resource For personal use only • 82.3Mt @ 1.1 g/t Au & 5.3 g/t Ag1 • Open along strike and down dip • Significant untapped exploration potential outside of the resource Misima gold mining heritage • Long mining history from 1888 – multi-million ounce endowme

  4. Slide 4: Landowners support drives success

    Misima landowners support drives success • Misima has a long mining history – 130 years of successful For personal use only and profitable gold mining on Misima. Active artisanal mining environment today • Highly trained and educated resident workforce, with over +100 FIFO Misima residents today • K

  5. Slide 5: Exploration targets

    Misima exploration targets Umuna Extensions: 2.8Moz Au For personal use only resource open along strike and down dip – potential for shear-hosted and skarn mineralisation Misima North: >4km untested strike open to the north, supported by historic u/g mining, geochemistry, and KSN structural review.

  6. Slide 6: Regional exploration targets

    Misima regional exploration targets Kingston has already identified multiple surface targets outside of the current resource For personal use only Ginamwamwa • Misima field work commenced December 2017 delivering immediate success with discovery of a new prospect at Ginamwamwa located adjacent to fo

  7. Slide 7: Current drilling

    Misima current drilling An extensive exploration drilling campaign is underway, the first undertaken at the project in almost 20 years. For personal use only Initial targets for current drill program: • Umuna Shear: testing down-dip beneath historic drilling at North Kulumalia and Central Umuna zone

  8. Slide 8: Current drilling – GDD013 intersection

    Misima current drilling GDD013 intersection: For personal use only • 6m @ 1.44 g/t Au and 1.98 g/t Ag, from 55m • 5m @ 0.95 g/t Au and 2.22 g/t Ag, from 138m • 40m @ 3.17 g/t Au and 10.88 g/t Ag, from 234m – including 6m @ 14.06 g/t and 13.33 Ag, from 268m 270-272m 10.6g/t Au + 9.4 g/t Ag 272-274m 2

  9. Slide 9: Active work program advancing

    Active work program advancing Phase I For personal use only Established extensional drilling exploration team Underway Complete Commence field Commence feasibility work Umuna North work Underway Commence geochemical Phase II extensional Environmental field work and infill drilling studies begin Comp

  10. Slide 10: Livingstone Gold Project (75%)

    Livingstone Gold Project (75%) • Located 140km NW of Meekatharra in Western For personal use only Australia over 220km2 • Historic WMC soil anomaly at Livingstone’s Find hosts numerous old workings • Livingstone North historical underground mined ~1,260oz at avg 21.65 g/t Au (1939) Homestead Prospec

  11. Slide 11: Livingstone Kingsley discovery

    Livingstone Kingsley discovery Kingsley prospect has now defined mineralisation over 1km1 • 4m @ 76.25 g/t Au from 88m For personal use only • 4m @ 3.49 g/t Au from 4m & 24m @ 1.06g/t Au from 24m • 28m @ 2.26 g/t Au from surface, – including 8m @ 5.57 g/t from surface • 16m @ 1.95 g/t Au from 56m, –

  12. Slide 12: Livingstone Gold Project

    Livingstone Gold Project Latest drilling highlights strike length and grade at Kingsley prospect. For personal use only 12

  13. Slide 13: In summary

    In summary • A 2.8Moz Au resource that is growing in scale and grade through exploration For personal use only • Highly credible global JV partners in Nippon Metals and Mitsui • Aiming to re-establish Misima as a large scale and low cost open pit gold mine • Livingstone Gold Project in WA also has c

  14. Slide 14: Board and Management

    Board and Management Anthony Wehby – Chairman Anthony was a founding director and former Chairman of Aurelia Metals Ltd, an ASX listing mining company, in his role oversaw the progression of the company from exploration through to production. Prior roles include Chairman of Tellus Resources and a di

  15. Slide 15: Disclaimer

    Disclaimer Forward Looking Statements Certain statements contained in this presentation, including information as to the future financial or operating performance of Kingston Resources Limited (“KSN”) and its projects, are forward looking statements. Such forward looking statements: For personal use