  1. Slide 1: Bioremediation

    Slide 1: Bioremediation

    Infra & Research Pvt. Ltd. An ISO : 9001 : 2008 Organization Bioremediation www.effwa.co.in

  2. Slide 2: These Lakes Now History

    Slide 2: These Lakes Now History

    : THESE LAKES HISTORY x hs

  3. Slide 3: Painful Realty

    Slide 3: Painful Realty

    PAINFUL REALTY

  4. Slide 4: Causes

    Slide 4: Causes

    Causes Encroachment Dumping of Wastes Sewage Ingress Effluent Ingress Surface runoff Carrying Sediments Farmland runoff Carrying Nutrients

  5. Slide 5: Balanced Ecosystem

    Slide 5: Balanced Ecosystem

    Balanced Ecosystem Waste generated by animalcules, dead decaying flora is biodegraded by specific micro-organisms. Oxygen in water is maintained (2 – 8 ppm) through surface air contact and slow turn around of water (thermal inversion) and Photosynthesis. No algal bloom or excessive eutrophication (w

  6. Slide 6: Impacts

    Slide 6: Impacts

    Impacts Sludge & Toxic Waste buildup Silting, D.O. Depletion, flora and fauna decay, built up of COD, pathogens Buildup of organic N2, Ammonia, Nitrates and Phosphates Excessive plant growth Vicious cycle of growth and decay of flora and fauna Blocks lake water photosynthesis, generate ugly bloom

  7. Slide 7: Revival Action Plan

    Slide 7: Revival Action Plan

    Revival Action Plan COLLECTION OF BASE DATA PERIODIC DIVERSION OF MONITORING OF LAKE INGRESS TREATMENT OF DEWEEDING SEDIMENTS & WATER & USING SPECIFIC BIO- PRODUCTS DISILTING D.O. ENHANCEMENT

  8. Slide 8: Action Plan: Base Data Collection

    Slide 8: Action Plan: Base Data Collection

    Action Plan : Base Data Collection  Remote Sensing Images • pH • D. O  Bathymetry Physico- • Turbidity • Total – N • Phosphate  Sampling of water and sediments Chemical • BOD • COD • Heavy Metals  Testing Microbial • Microbial Count Analysis • pH • Organics Sludge • Ash Content Analysis • Total

  9. Slide 9: Action Plan: Diversion/Pretreatment of Ingress

    Slide 9: Action Plan: Diversion/Pretreatment of Ingress

    Action Plan : Diversion/ Pretreatment of Ingress

  10. Slide 10: Action Plan: Desilting & Deweeding

    Slide 10: Action Plan: Desilting & Deweeding

    Action Plan : Desilting & Deweeding Desilting for inorganic sediments • Restoration of water holding Capacity Deweeding • Accelerated restoration process • Weeds converted into compost

  11. Slide 11: Action Plan: D.O. Enhancement

    Slide 11: Action Plan: D.O. Enhancement

    Action Plan : D. O. Enhancement  Oil–less air blowers  Solar operated circulators  Natural Thermal Inversion  Photosynthesis

  12. Slide 12: Action Plan: Bioremediation

    Slide 12: Action Plan: Bioremediation

    Action Plan : Bioremediation Bioremediation : The process by which accumulated complex organics as pollutants in water bodies or soil are turned into safe end products and its ecosystem is restored by in-situ application of selective or consortium of biocultures and continued monitoring of eco param

  13. Slide 13: Action Plan: Bioremediation

    Slide 13: Action Plan: Bioremediation

    Action Plan : Bioremediation -PO4 , HPO4 , H2 PO4 & H3PO4  The mechanism of Phosphate removal is to bind soluble phosphates with highly porous calcareous base used in bacterial formulation and allow it to settle and make available to new bacterial tissue formation as source of energy transportation

  14. Slide 14: Expected Results

    Slide 14: Expected Results

    Expected Results 1) To achieve normal healthy ecosystem through  Elimination and prevention of eutrophication  To bring critical parameters to the desired limits, specifically for, Dissolved Oxygen  Phosphate  Nitrates  COD/ Pathogens 2) To gradually minimize mechanical aeration and maintain di

  15. Slide 15: Expected Water Quality

    Slide 15: Expected Water Quality

    Expected Water Quality Requirements for waters of class Parameters Units A – Excellent B – Desirable C – Acceptable pH – 7.0 to 8.5 6.5 to 9.0 6.5 to 10.0 DO mg/1 over 6 Over 4 Over 3 BOD mg/1 Below 2 Below 5 Below 8 EC µ mhos/ cm <1500 <2250 <4000 (NO2 + NO3) – N2 mg/1 <5 <10 <15 Total Coliforms M

  16. Slide 16: Monitoring

    Slide 16: Monitoring

    Monitoring Various parameters are monitored at varied frequency

  17. Slide 17: Our Team Experience

    Slide 17: Our Team Experience

    Our Team Experience

  18. Slide 18: Our Team Experience

    Slide 18: Our Team Experience

    Our Team Experience

  19. Slide 19: Our Team Experience

    Slide 19: Our Team Experience

    Our Team Experience

  20. Slide 20: Our Team Experience

    Slide 20: Our Team Experience

    Our Team Experience

  21. Slide 21: Our Team Experience

    Slide 21: Our Team Experience

    Ness: Our Team Experience errurer

  22. Slide 22: Contact

    Slide 22: Contact

    Contact Effwa Infra & Research Pvt. Ltd. An ISO : 9001 : 2008 Organisation 07, Vardhaman Complex, LBS Marg, Gokul Nagar, Thane (W)- 400 601, India. Tel : 022 – 41842800, Fax : 022 – 41842828 E-mail: info@effwa.co.in