Scottie Resources Corp. · TSXV:SCOT

Scottie Resources — Investor Presentation (June 2025)

20 slides from Scottie Resources's investor presentation, June 2025

  1. Slide 1: Accelerating Toward Production

    ACCELERATING TOWARD PRODUCTION JUNE 2025 CORPORATE PRESENTATION TSXV: SCOT | OTCQB: SCTSF | FRANKFURT: SR8

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the

  3. Slide 3: Capital Structure

    51% CAPITAL STRUCTURE HNW / Institutional Cash Position $6.5M CAD Shares Issued and Outstanding Market Capitalization 52 Week Range 49,969,937 $45M CAD $0.77 - $1.20 16% Management 33% Retail Warrants 2,453,285 & Directors Market Options 3,324,333 Fully Diluted 56,190,555 2% GPR ROYALTY ($8.1M CAD),

  4. Slide 4: Management & Directors

    MANAGEMENT & DIRECTORS CEO & DIRECTOR PRESIDENT CHIEF OPERATING OFFICER BRADLEY ROURKE THOMAS MUMFORD Sean Masse Ph.D, P.Geo P.Eng DIRECTOR DIRECTOR DIRECTOR DIRECTOR CORPORATE SECRETARY CFO ERNEST MAST JOHN WILLIAMSON STEVEN STEIN ELLIE OWENS CHRISTINA BODDY STEPHEN SULIS M. Eng., P. Eng P.Geol. J.

  5. Slide 5: Recent Advances

    RECENT ADVANCES ROYALTY ORE MAIDEN PEA SALE SORTING RESOURCE Technical endorsement Phase 1 study 703,000 oz of gold DSO-based PEA study f rom world leading establishes viability consisting of an to be completed by royalty company of ore-sorting underground resource December, 2025 Franco-Nevada techn

  6. Slide 6: Investment Highlights

    CASH POSITION $6.5M CAD INVESTMENT HIGHLIGHTS LOCATED IN BC’S INFRASTRUCTURE ADVANCED COMMANDING EXPERIENCED GOLDEN TRIANGLE & ACCESSIBILITY EXPLORATION LAND POSITION MANAGEMENT TEAM Prolific Tier 1 40 km from Stewart, 6 km trend of ~58,500 ha in the Independent board mining jurisdiction BC, and Por

  7. Slide 7: The Golden Triangle

    THE GOLDEN TRIANGLE TATOGGA NEWMONT | $58.6 B | TATOGGA RED CHRIS $393 M ACQUISITION OF GT GOLD IN 2021 SHAFT CREEK NEWMONT | $58.6 B | RED CHRIS 980 M T MINERAL RESOURCE ESTIMATE, M&I, 2021 4 GALORE CREEK PRODUCED 67.6 M LBS COPPER, 2022 TECK | $25 B | SCHAFT CREEK T H E P A S T - P R O D U C I N G

  8. Slide 8: District-Scale Land Package

    BRUCEJACK MINE Newmont Mining - 12 km north PAST-PRODUCING 58,500 SCOTTIE GOLD MINE HECTARE PREMIER MINE & MILL 37A DISTRICT-SCALE Ascot Resources - 15 km south LAND PACKAGE STEWART, BC Located in BC’s prolific Golden Triangle, Host to seven past-producing mines, RED MOUNTAIN DEPOSIT with advanced i

  9. Slide 9: Infrastructure Advantage

    SCOTTIE GOLD MINE Six portals, shafts, INFRASTRUCTURE rail system, 7 km of drifts, flat areas for new infrastructure ADVANTAGE BRUCEJACK TRANSMISSION LINE Along property boundary Accessible hydro power 37A FOUR-SEASON ROAD Road accessible high-grade gold targets STEWART, BC Deep water shipping port

  10. Slide 10: Scottie Gold Mine Target Locations

    SCOTTIE GOLD MINE TARGET LOCATIONS BRUCEJACK SCOTTIE GOLD MINE BLUEBERRY CONTACT ZONE C & D ZONES PORTAL ACCESS ROAD TAILINGS GRANDUC ROAD DRAINED LAKE BED LITHOLOGICAL CONTACT PREMIER

  11. Slide 11: The Scottie Gold Mine

    2024 Drillhole N Gold-Silver Veins (as currently modelled) SGM Underground Workings 6.89 g/t Au over 5.80 m 3.35 g/t Au over 8.75 m Morris Fault SR23-293 INCLUDING 7.11 g/t Au over 2.20 m Summit Lake Stock SR23-298 THE SCOTTIE 54.0 g/t Au over 1.00 m SR24-337 P- ZO NE 109.4 g/t Au over 2.53 m SR20-0

  12. Slide 12: Blueberry Contact Zone drill highlights

    CASTLE BLUEBERRY 53.2 G/T GOLD 194 G/T GOLD OVER 3.00 M OVER 2.40 M 8.21 G/T GOLD 34.6 G/T GOLD OVER 19.00 M OVER 11.90 M 4.94 G/T GOLD 7.44 G/T GOLD OVER 28.80 M OVER 34.78 M BLUEBERRY 22.2 G/T GOLD OVER 6.35 M 9.79 G/T GOLD OVER 25.00 M CONTACT 130 G/T GOLD OVER 1.05 M 56.4 G/T GOLD OVER 3.70 M ZO

  13. Slide 13: Blueberry Contact Zone Section

    Nort h 2.0 Kilometres South Blueberry Contact Zone Viewing Angle East 090 o Proposed Blueberry Open Pit D-Zone C-Zone Fifi Lemoffe Blueberry Road Gulley Serac Lakebed 0m 100 OPEN 200 A U LT SR23-236 56.4 g/t Au over 3.70 m 300 MILL F SR22-222 SR22-169 SR22-227 130 g/t Au over 1.05 m 9.12 g/t Au over

  14. Slide 14: Resource Estimate

    RESOURCE ESTIMATE PIT CONSTRAINED RESOURCE BLUEBERRY PIT CONSTRAINED RESOURCE Cutoff Au Tonnes Au Au Metal 174 (g/t) (ktonnes) (g/t) (kOz) 0.7 1,707 3.17 174 kOz 703 COMBINED UNDERGROUND RESOURCE BLUEBERRY & SCOTTIE MINE Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) kOz 2.5 1,897 8.66 528

  15. Slide 15: Ore Sorting Study

    ORE SORTING STUDY Road access drilling at Blueberry Contact Zone Phase I of PEA-level ore sorting study proven successful at Scottie Gold Mine Project • Strong associations between gold zones and sulphide minerals make the deposits amenable to multiple types of sensors BLUEBERRY BLUEBERRY SCOTTIE GO

  16. Slide 16: DSO Operation

    DSO OPERATION Using ore sorting STRATEGY INFRASTRUCTURE PERMITS technology, Commence open pit Critical inf rastructure Existing mine permit DSO will mining, reducing including power lines (M139) currently in eliminate the capital costs as well as and hauling roads place, providing need for a startup

  17. Slide 17: Work Program

    2024 Drillhole BEND 2019-2023 Drillhole Historic Drillhole Blueberry Contact Zone STOCKWORK 2025 Underground Workings Road Highly prospective contact WORK between Texas Creek Intrusives and Hazelton Group Volcanics BLUEBERRY Newmont Claims Castle Claims PROGRAM High-grade gold showing confirmed by dr

  18. Slide 18: Pathway to Value

    PATHWAY TO VALUE $9.6 million financing 17,176 m drill program with Franco-Nevada Doubled strike length % Follow up drilling at SGM Development of the 7,000 m drill program Increased depth of Expansion drilling at SGM exploration plan Blueberry Contact Zone Blueberry Contact Zone Secured multiple In

  19. Slide 19: Guiding Principles

    Committed to offering employment, training, and contracting opportunities to local First Nations and surrounding community members. GUIDING PRINCIPLES Land donation of 1010 hectares to the Meziadin Indigenous Protection Active involvement from local Area in partnership with the First Nations communi

  20. Slide 20: Contact

    9 0 5-1111 We s t H a s t i n g s S t . , Van co u ve r, BC , V6 E 2 J 3 , Ca n a da SCOTTIERESOURCES.COM BRAD ROURKE CEO & DIRECTOR +1 250 877-9902 brad@scottieresources.com 1 Schaft Creek Preliminary Economic Assessment (PEA), NI 43-101 Technical Report, Sept 10, 2021 2 Galore Creek Reserves and R

Scottie Resources — Investor Presentation (June 2025) on 6ix