Scottie Resources Corp. · TSXV:SCOT
Scottie Resources — Investor Presentation (October 2026)
24 slides from Scottie Resources's investor presentation, Oct 6, 2026
Slide 1: Accelerating Towards Production
ACCELERATING TOWARDS PRODUCTION ACCELERATING TOWARDS PRODUCTION CORPORATE PRESENTATION OCTOBER 2026 FSE: SR80 WWW.SCOTTIERESOURCES.COM TSXV: SCOT OTCQB: SCTSF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS FORWARD LOOKING STATEMENTS Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statement
Slide 3: Capital Structure
CAPITAL STRUCTURE CAPITAL STRUCTURE CASH POSITION $18 M CAD STRATEGIC PARTNERSHIPS Issued and Outstanding 77,456,436 FRANCO-NEVADA 2% GPR Royalty ($8.1 M CAD) $1.5 M CAD Equity Investment Market Capitalization $210 M CAD OCEAN PARTNERS Equity Investment, Off-take Agreement 52 Week Range $1.45 - $3.2
Slide 4: Management & Directors
MANAGEMENT DIRECTORS MANAGEMENT & DIRECTORS E XE C U T I V E C H A I R PRE S I D E N T & CE O CHIEF OPER ATING OFFI CER BRADLEY ROURKE THOMAS MUMFORD SEAN MASSE Ph.D, P.Geo P.Eng DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR CORPORATE SECRETARY CFO ERNEST MAST JOHN WILLIAMSON STEVEN STEIN ELLIE OWENS
Slide 5: Recent Advances
RECENT ADVANCES RECENT ADVANCES 703,000 oz of gold consisting of an underground resource of 528,000 oz at 8.7 g/t and an open pit MAIDEN RESOURCE resource of 174,000 oz at 3.2 g/t Ocean Partners $6 M Equity & $25 M USD Construction and Overrun Facility STRATEGIC PARTNERSHIP News released in October
Slide 6: Investment Highlights
INVESTMENT HIGHLIGHTS INVESTMENT HIGHLIGHTS CASH POSITION $20 M CAD LOCATED IN BC’S INFRASTRUCTURE ADVANCED COMMANDING EXPERIENCED GOLDEN TRIANGLE & ACCESSIBILITY EXPLORATION LAND POSITION MANAGEMENT TEAM Prolific Tier 1 40 km from Stewart, 6 km trend of ~58,500 ha in the Independent board mining ju
Slide 7: The Golden Triangle
THE GOLDEN TRIANGLE THE GOLDEN TRIANGLE TATOGGA RED CHRIS NEWMONT | $118 B | TATOGGA $393 M ACQUISITION OF GT GOLD IN 2021 SCHAFT CREEK NEWMONT | $118 B | RED CHRIS 980 M T MINERAL RESOURCE ESTIMATE, M&I, 20211 GALORE CREEK PRODUCED 67.6 M LBS COPPER, 2022 T H E P A S T - P R O D U C I N G TECK | $3
Slide 8: 58,500 Hectare District-Scale Land Package
BRUCEJACK MINE Newmont Mining PAST-PRODUCING SCOTTIE GOLD MINE 58,500 HECTARE GRANDUC ROAD DISTRICT-SCALE Scottie Gold Mine to Stewart, BC - 40 km 37 A PREMIER MINE & MILL LAND PACKAGE Cambria Gold Mines BRUCEJACK TRANSMISSION LINE STEWART, BC Located in BC’s prolific Golden Deep water shipping port
Slide 9: Project Overview
PROJECT OVERVIEW PROJECT OVERVIEW NEWMONT MINING BRUCEJACK MINE SCOTTIE GOLD MINE BLUEBERRY CONTACT ZONE C & D ZONES GRANDUC ROAD CAMBRIA GOLD MINES PREMIER MINE & MILL ~20 KM SOUTH DRILLING AT THE SCOTTIE GOLD MINE, 2025 9
Slide 10: Blueberry Contact Zone
CONTACT BLUEBERRY CONTACT ZONE 30.1 G/T GOLD 194 G/T GOLD 34.6 G/T GOLD OVER 23.65 M OVER 2.40 M OVER 11.90 M Select highlights from 7.44 G/T GOLD 9.79 G/T GOLD 56.4 G/T GOLD 2019-2025 drill programs OVER 34.78 M OVER 25.00 M OVER 3.70 M 15.3 G/T GOLD 9.2 G/T GOLD 114.7 G/T GOLD OVER 13.49 M OVER 21
Slide 11: WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80
WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80 11
Slide 12: The Scottie Gold Mine
THE SCOTTIE GOLD MINE THE SCOTTIE GOLD MINE Historic drilling was production focused Average hole length was only 75.2 m long Mine produced 95,426 ounces of gold from 1981-1984 Average recovered grade of 16.2 g/t gold Operated with a 10 g/t gold cutoff Mine Permit (M139) - Care and Maintenance 2025
Slide 13: Resource Estimate
RESOURCE ESTIMATE RESOURCE ESTIMATE PIT CONSTRAINED RESOURCE 174 Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) 703 0.7 1,707 3.17 174 kOz Cutoff Au Tonnes Au Au Metal kOz (g/t) (ktonnes) (g/t) (kOz) 528 2.5 1,897 8.66 528 GOLD kOz Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) v
Slide 14: DSO Operation
STRATEGY STR ATE G Y Commence open pit mining, reducing capital costs as well as start-up POSITION DSO and operational risk Located 40 km from a deep-sea shipping terminal in one of OPERATION the lowest- cost commercial TIMING shipping lanes between North America and Asia Structural supply deficit in
Slide 15: Blueberry Mine Plan
BLUEBERRY MINE PLAN PRELIMINAR Y ECONOMIC ASSESSMENT BLUEBERRY MINE PLAN Mine payback 1.2 years (US$2600 DSO model) Open pit grade 7.71 g/t gold (79,400 oz) • De-risks project with rapid project payback Underground grade 6.91 g/t gold (315,800 oz) Contract mining for both open pit and underground WW
Slide 16: Scottie Gold Mine Plan
SCOTTIE GOLD MINE PLAN PRELIMINAR Y ECONOMIC ASSESSMENT SCOTTIE GOLD MINE PLAN Underground grade 6.07 g/t gold (87,800 oz) Detailed surveying of existing workings required • May help with sterilization of adjacent stopes • Planned for 2026 Planned as all new development • Opportunity for rehab of ol
Slide 17: Scottie Gold Mine DSO Mine Plan
SCOTTIE GOLD MINE DSO MINE PLAN PRELIMINAR Y ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO MINE PLAN Initial Capital Cost of $128.6 M CAD • Camp set back from mining activities • Integrated shop / warehouse and LNG powerplant • Crushing and sorting plant (pictured below) • Covered stockpiles of sorted o
Slide 18: Scottie Gold Mine DSO Financials
PRELIMINAR YECONOMICASSESSMENT SCOTTIE GOLD MINE DSO FINANCIALS PRELIMINAR Y ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO FINANCIALS MINE LIFE 7 YEARS AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz AVERAGE GRADE 6.86 g/t gold GOLD RECOVERY 94.7% NPV5% IRR PAYBACK NPV/CAPEX AVG. ANNUAL PRODUCTION 6 5 , 4 0 0
Slide 19: Toll Milling Scenario
TOLL MILLING SCENARIO PRELIMINAR Y ECONOMIC ASSESSMENT TOLL MILLING SCENARIO Conceptual Toll Milling Opportunity with Premier Mill AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz • No agreement currently in place NPV5% IRR PAYBACK NPV/CAPEX • Located 20 km en route to bulk terminal $380.1 M CAD 89.9% 0.9
Slide 20: Resource Upside
RESOURCE UPSIDE Top Intercepts from 2019 - 2024 RESOURCE UPSIDE AT LEAST PARTIAL INCLUSION IN MRE M-ZONE SCOTTIE GOLD MINE BEND PARTIALLY INCLUDED IN MRE INCLUDED IN MRE Top Intercepts from 2019 - 2024 Top Intercepts from 2019 - 2024 37.6 g/t Au over 4.1 m 73.32 g/t Au over 4.28 m 37.2 g/t Au over 3
Slide 21: 2026 Work Program
2026 WORK PROGRAM 2026 WORK PROGRAM 50,000m drill program focused on resource upgrade and expansion, including ~15,000m of exploration drilling Large geophysical surveys (3DIP and MT) Feasibility level mine design engineering Phase III ore sorting study Year 2 of environmental baseline studies WWW.S
Slide 22: SGM Project Timeline
SGM PROJECT TIMELINE 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ENVIRONMENTAL BASELINE EA PATHWAY DECISION COMPLETE PERMIT RECEIVED PRODUCTION MILESTONES FEASIBILITY STUDY & PERMIT APPLICATION RESOURCE UPDATE SUBMITTED PERMITTING EA ENGAGEMENT JPAA DEVELOPMENT JPAA REVIEW ENVIRONMENTAL BASEL
Slide 23: Our Values in Action
OUR VALUES IN ACTION OUR VALUES Committed to offering employment, training, and contracting opportunities to IN ACTION local First Nations and surrounding community members. Land donation of 1010 hectares to the Meziadin Indigenous Protection Area Active involvement from in partnership with the Natu
Slide 24: Thomas Mumford
THOMASMUMFORD THOMAS MUMFORD PRESIDENT & CEO +1 604 910-2079 thomas@scottieresources.com WWW. S C O T T I E R E S O U R C E S . C O M 905-1111 West Hastings St., Vancouver, BC, V6E 2J3, Canada FOOTNOTES 1 Schaft Creek Preliminary Economic Assessment (PEA), NI 43-101 Technical Report, Sept 10, 2021 4
Scottie Resources — Investor Presentation (October 2026) on 6ix