Scottie Resources Corp. · TSXV:SCOT

Scottie Resources — Investor Presentation (March 2026)

24 slides from Scottie Resources's investor presentation, March 2026

  1. Slide 1: Accelerating Towards Production

    ACCELERATING TOWARDS PRODUCTION CORPORATE PRESENTATION MARCH 2026 FSE:SR80 WWW.SCOTTIERESOURCES.COM TSXV:SCOT OTCQB:SCTSF

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the u

  3. Slide 3: Capital Structure

    CAPITAL STRUCTURE CASH POSITION $39 M CAD STRATEGIC PARTNERSHIPS Issued and Outstanding 76,236,725 FRANCO-NEVADA 2% GPR Royalty ($8.1 M CAD) $1.5 M CAD Equity Investment Market Capitalization $167 M CAD OCEAN PARTNERS Equity Investment, Off-take Agreement 52 Week Range $0.82 - $2.20 $25 M USD Financ

  4. Slide 4: Management & Directors

    MANAGEMENT & DIRECTORS EXECUTIVE CHAIR PRESIDENT & CEO C H I E F O P E R AT I N G O F F I C E R BRADLEY ROURKE THOMAS MUMFORD SEAN MASSE Ph.D, P.Geo P.Eng DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR CORPORATE SECRETARY CFO ERNEST MAST JOHN WILLIAMSON STEVEN STEIN ELLIE OWENS BRENT OMLAND CHRISTINA

  5. Slide 5: Recent Advances

    RECENT ADVANCES 703,000 oz of gold consisting of an underground resource of 528,000 oz at 8.7 g/t and an open pit MAIDEN RESOURCE resource of 174,000 oz at 3.2 g/t Ocean Par tners $6 M Equity & $25 M USD Construction and Overrun Facility STRATEGIC PARTNERSHIP News released in October 2025, $2600 USD

  6. Slide 6: Investment Highlights

    INVESTMENT HIGHLIGHTS CASH POSITION $39 M CAD LOCATED IN BC’S INFRASTRUCTURE ADVANCED COMMANDING EXPERIENCED GOLDEN TRIANGLE & ACCESSIBILITY EXPLORATION LAND POSITION MANAGEMENT TEAM Prolific Tier 1 40 km from Stewart, 6 km trend of ~58,500 ha in the Independent board mining jurisdiction BC, and Port

  7. Slide 7: The Golden Triangle

    THE GOLDEN TRIANGLE TATOGGA RED CHRIS NEWMONT | $118 B | TATOGGA $393 M ACQUISITION OF GT GOLD IN 2021 SCHAFT CREEK NEWMONT | $118 B | RED CHRIS 980 M T MINERAL RESOURCE ESTIMATE, M&I, 20211 GALORE CREEK PRODUCED 67.6 M LBS COPPER, 2022 TECK | $34 B | SCHAFT CREEK T H E P A S T - P R O D U C I N G 7

  8. Slide 8: 58,500 Hectare District-Scale Land Package

    BRUCEJACK MINE Newmont Mining NEWMONT PAST-PRODUCING SCOTTIE GOLD MINE 58,500 HECTARE GRANDUC ROAD DISTRICT-SCALE Scottie Gold Mine to Stewart, BC - 40 km 37A PREMIER MINE & MILL LAND PACKAGE SCOTTIE Ascot Resources BRUCEJACK TRANSMISSION LINE ASCOT STEWART, BC Located in BC’s prolific Golden Triangl

  9. Slide 9: Project Overview

    PROJECT OVERVIEW NEWMONT MINING BRUCEJACK MINE SCOTTIE GOLD MINE BLUEBERRY CONTACT ZONE C & D ZONES GRANDUC ROAD ASCOT RESOURCES PREMIER MINE & MILL ~20 KM SOUTH DRILLING AT THE SCOTTIE GOLD MINE, 2025 WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80 9

  10. Slide 10: Blueberry Contact Zone

    BLUEBERRY CONTACT ZONE BLUEBERRY CONTACT ZONE INSET MAP 30.1 G/T GOLD 194 G/T GOLD 34.6 G/T GOLD OVER 23.65 M OVER 2.40 M OVER 11.90 M Select highlights from 7.44 G/T GOLD 9.79 G/T GOLD 56.4 G/T GOLD 2019-2025 drill programs OVER 34.78 M OVER 25.00 M OVER 3.70 M 15.3 G/T GOLD 9.2 G/T GOLD 114.7 G/T

  11. Slide 11: WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80

    WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80 11

  12. Slide 12: The Scottie Gold Mine

    THE SCOTTIE GOLD MINE Historic drilling was production focused Average hole length was only 75.2 m long Mine produced 95,426 ounces of gold from 1981-1984 Average recovered grade of 16.2 g/t gold Operated with a 10 g/t gold cutoff Mine Permit (M139) - Care and Maintenance SCOTTIE GOLD MINE INSET MAP

  13. Slide 13: Resource Estimate

    RESOURCE ESTIMATE PIT CONSTRAINED RESOURCE BLUEBERRY PIT CONSTRAINED RESOURCE 174 Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) 703 0.7 1,707 3.17 174 kOz COMBINED UNDERGROUND RESOURCE BLUEBERRY & SCOTTIE MINE kOz Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) 2.5 1,897 8.66 528

  14. Slide 14: DSO Operation

    STRATEGY Commence open pit mining, reducing capital costs as well as star t-up POSITION DSO and operational risk Located 40 km from a deep-sea shipping terminal in one of OPERATION the lowest-cost commercial TIMING shipping lanes between Nor th America and Asia Structural supply deficit in the Asian

  15. Slide 15: Blueberry Mine Plan

    PRELIMINARY ECONOMIC ASSESSMENT BLUEBERRY MINE PLAN Mine payback 1.2 years (US$2600 DSO model) Open pit grade 7.71 g/t gold (79,400 oz) • De-risks project with rapid project payback Underground grade 6.91 g/t gold (315,800 oz) Contract mining for both open pit and underground BLUEBERRY CONTACT ZONE

  16. Slide 16: Scottie Gold Mine Plan

    PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE PLAN Underground grade 6.07 g/t gold (87,800 oz) Detailed surveying of existing workings required • May help with sterilization of adjacent stopes • Planned for 2026 Planned as all new development • Opportunity for rehab of old workings SCOTTIE GOLD

  17. Slide 17: Scottie Gold Mine DSO Mine Plan

    PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO MINE PLAN Initial Capital Cost of $128.6 M CAD • Camp set back from mining activities • Integrated shop / warehouse and LNG powerplant • Crushing and sor ting plant (pictured below) • Covered stockpiles of sor ted ore and fines • Waste rock storag

  18. Slide 18: Scottie Gold Mine DSO Financials

    PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO FINANCIALS MINE LIFE 7 YE ARS AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz AV ERAGE GRADE 6.86 g/t go ld NPV5% IRR PAYBACK NPV/CAPEX GO LD RECO V ERY 94.7% AVG. ANNUAL PRO DUCTIO N 65, 400 O z $215.8 M CAD 60.3% 1.2 YRS 1.7 AVG. ANNUAL SO RTED TO NN

  19. Slide 19: Toll Milling Scenario

    PRELIMINARY ECONOMIC ASSESSMENT TOLL MILLING SCENARIO Conceptual Toll Milling Opportunity with Premier Mill AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz • No agreement currently in place NPV5% IRR PAYBACK NPV/CAPEX • Located 20 km en route to bulk terminal $380.1 M CAD 89.9% 0.9 YRS 3.0 Compelling finan

  20. Slide 20: Resource Upside

    RESOURCE UPSIDE AT LEAST PARTIAL INCLUSION IN MRE M-ZONE SCOTTIE GOLD MINE BEND PARTIALLY INCLUDED IN MRE INCLUDED IN MRE Top Intercepts from 2019 - 2024 37.6 g/t Au over 4.1 m 73.32 g/t Au over 4.28 m 37.2 g/t Au over 3.71 m 46.53 g/t Au over 1.14 m 11.7 g/t Au over 10.95 m BLUEBERRY O-ZONE SCOTTIE

  21. Slide 21: 2025 Work Program

    2025 WORK PROGRAM ✔ Targeted drill program focused on resource upgrade and expansion (27,300 m drilled) ✔ Mine design engineering ✔ Phase II ore sor ting study ✔ PEA and FS level geotechnical study ✔ Initiate environmental baseline studies ✔ Complete 10,000 t Sur face Bulk Sample WWW.SCOTTIERESOURCE

  22. Slide 22: SGM Project Timeline

    SGM PROJECT TIMELINE 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ENVIRONMENTAL BASELINE EA PATHWAY DECISION COMPLETE PERMIT RECEIVED PRODUCTION MILESTONES FEASIBILITY STUDY & PERMIT APPLICATION RESOURCE UPDATE SUBMITTED PERMITTING EA ENGAGEMENT JPAA DEVELOPMENT JPAA REVIEW ENVIRONMENTAL BASEL

  23. Slide 23: Our Values in Action

    OUR VALUES Committed to offering employment, training, and contracting oppor tunities to local IN ACTION First Nations and surrounding community members. Land donation of 1010 hectares to the Meziadin Indigenous Protection Area Active involvement from local in par tnership with the Nature Indigenous

  24. Slide 24: Brad Rourke

    BRAD R O U R K E EX EC U T IVE CH AIR +1 250 877-9902 brad@scottieresources.com WWW.SCOTTIERESOURCES.COM 9 0 5 - 1 111 We s t Has t i n g s S t ., Va n cou v er , B C , V 6 E 2 J3 , C an a d a FOOTNOTES 4 1 Schaft Creek Preliminary Economic Assessment (PEA), NI 43-101 Technical Report, Sept 10, 2021

Scottie Resources — Investor Presentation (March 2026) on 6ix