Slide 1: Accelerating Towards Production
ACCELERATING TOWARDS PRODUCTION CORPORATE PRESENTATION MARCH 2026 FSE:SR80 WWW.SCOTTIERESOURCES.COM TSXV:SCOT OTCQB:SCTSF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the u
Slide 3: Capital Structure
CAPITAL STRUCTURE CASH POSITION $39 M CAD STRATEGIC PARTNERSHIPS Issued and Outstanding 76,236,725 FRANCO-NEVADA 2% GPR Royalty ($8.1 M CAD) $1.5 M CAD Equity Investment Market Capitalization $167 M CAD OCEAN PARTNERS Equity Investment, Off-take Agreement 52 Week Range $0.82 - $2.20 $25 M USD Financ
Slide 4: Management & Directors
MANAGEMENT & DIRECTORS EXECUTIVE CHAIR PRESIDENT & CEO C H I E F O P E R AT I N G O F F I C E R BRADLEY ROURKE THOMAS MUMFORD SEAN MASSE Ph.D, P.Geo P.Eng DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR CORPORATE SECRETARY CFO ERNEST MAST JOHN WILLIAMSON STEVEN STEIN ELLIE OWENS BRENT OMLAND CHRISTINA
Slide 5: Recent Advances
RECENT ADVANCES 703,000 oz of gold consisting of an underground resource of 528,000 oz at 8.7 g/t and an open pit MAIDEN RESOURCE resource of 174,000 oz at 3.2 g/t Ocean Par tners $6 M Equity & $25 M USD Construction and Overrun Facility STRATEGIC PARTNERSHIP News released in October 2025, $2600 USD
Slide 6: Investment Highlights
INVESTMENT HIGHLIGHTS CASH POSITION $39 M CAD LOCATED IN BC’S INFRASTRUCTURE ADVANCED COMMANDING EXPERIENCED GOLDEN TRIANGLE & ACCESSIBILITY EXPLORATION LAND POSITION MANAGEMENT TEAM Prolific Tier 1 40 km from Stewart, 6 km trend of ~58,500 ha in the Independent board mining jurisdiction BC, and Port
Slide 7: The Golden Triangle
THE GOLDEN TRIANGLE TATOGGA RED CHRIS NEWMONT | $118 B | TATOGGA $393 M ACQUISITION OF GT GOLD IN 2021 SCHAFT CREEK NEWMONT | $118 B | RED CHRIS 980 M T MINERAL RESOURCE ESTIMATE, M&I, 20211 GALORE CREEK PRODUCED 67.6 M LBS COPPER, 2022 TECK | $34 B | SCHAFT CREEK T H E P A S T - P R O D U C I N G 7
Slide 8: 58,500 Hectare District-Scale Land Package
BRUCEJACK MINE Newmont Mining NEWMONT PAST-PRODUCING SCOTTIE GOLD MINE 58,500 HECTARE GRANDUC ROAD DISTRICT-SCALE Scottie Gold Mine to Stewart, BC - 40 km 37A PREMIER MINE & MILL LAND PACKAGE SCOTTIE Ascot Resources BRUCEJACK TRANSMISSION LINE ASCOT STEWART, BC Located in BC’s prolific Golden Triangl
Slide 9: Project Overview
PROJECT OVERVIEW NEWMONT MINING BRUCEJACK MINE SCOTTIE GOLD MINE BLUEBERRY CONTACT ZONE C & D ZONES GRANDUC ROAD ASCOT RESOURCES PREMIER MINE & MILL ~20 KM SOUTH DRILLING AT THE SCOTTIE GOLD MINE, 2025 WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80 9
Slide 10: Blueberry Contact Zone
BLUEBERRY CONTACT ZONE BLUEBERRY CONTACT ZONE INSET MAP 30.1 G/T GOLD 194 G/T GOLD 34.6 G/T GOLD OVER 23.65 M OVER 2.40 M OVER 11.90 M Select highlights from 7.44 G/T GOLD 9.79 G/T GOLD 56.4 G/T GOLD 2019-2025 drill programs OVER 34.78 M OVER 25.00 M OVER 3.70 M 15.3 G/T GOLD 9.2 G/T GOLD 114.7 G/T
Slide 11: WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80
WWW.SCOTTIERESOURCES.COM | TSXV:SCOT | OTCQB:SCTSF | FSE:SR80 11
Slide 12: The Scottie Gold Mine
THE SCOTTIE GOLD MINE Historic drilling was production focused Average hole length was only 75.2 m long Mine produced 95,426 ounces of gold from 1981-1984 Average recovered grade of 16.2 g/t gold Operated with a 10 g/t gold cutoff Mine Permit (M139) - Care and Maintenance SCOTTIE GOLD MINE INSET MAP
Slide 13: Resource Estimate
RESOURCE ESTIMATE PIT CONSTRAINED RESOURCE BLUEBERRY PIT CONSTRAINED RESOURCE 174 Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) 703 0.7 1,707 3.17 174 kOz COMBINED UNDERGROUND RESOURCE BLUEBERRY & SCOTTIE MINE kOz Cutoff Au Tonnes Au Au Metal (g/t) (ktonnes) (g/t) (kOz) 2.5 1,897 8.66 528
Slide 14: DSO Operation
STRATEGY Commence open pit mining, reducing capital costs as well as star t-up POSITION DSO and operational risk Located 40 km from a deep-sea shipping terminal in one of OPERATION the lowest-cost commercial TIMING shipping lanes between Nor th America and Asia Structural supply deficit in the Asian
Slide 15: Blueberry Mine Plan
PRELIMINARY ECONOMIC ASSESSMENT BLUEBERRY MINE PLAN Mine payback 1.2 years (US$2600 DSO model) Open pit grade 7.71 g/t gold (79,400 oz) • De-risks project with rapid project payback Underground grade 6.91 g/t gold (315,800 oz) Contract mining for both open pit and underground BLUEBERRY CONTACT ZONE
Slide 16: Scottie Gold Mine Plan
PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE PLAN Underground grade 6.07 g/t gold (87,800 oz) Detailed surveying of existing workings required • May help with sterilization of adjacent stopes • Planned for 2026 Planned as all new development • Opportunity for rehab of old workings SCOTTIE GOLD
Slide 17: Scottie Gold Mine DSO Mine Plan
PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO MINE PLAN Initial Capital Cost of $128.6 M CAD • Camp set back from mining activities • Integrated shop / warehouse and LNG powerplant • Crushing and sor ting plant (pictured below) • Covered stockpiles of sor ted ore and fines • Waste rock storag
Slide 18: Scottie Gold Mine DSO Financials
PRELIMINARY ECONOMIC ASSESSMENT SCOTTIE GOLD MINE DSO FINANCIALS MINE LIFE 7 YE ARS AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz AV ERAGE GRADE 6.86 g/t go ld NPV5% IRR PAYBACK NPV/CAPEX GO LD RECO V ERY 94.7% AVG. ANNUAL PRO DUCTIO N 65, 400 O z $215.8 M CAD 60.3% 1.2 YRS 1.7 AVG. ANNUAL SO RTED TO NN
Slide 19: Toll Milling Scenario
PRELIMINARY ECONOMIC ASSESSMENT TOLL MILLING SCENARIO Conceptual Toll Milling Opportunity with Premier Mill AFTER-TAX VALUE | GOLD PRICE $2600 USD/oz • No agreement currently in place NPV5% IRR PAYBACK NPV/CAPEX • Located 20 km en route to bulk terminal $380.1 M CAD 89.9% 0.9 YRS 3.0 Compelling finan
Slide 20: Resource Upside
RESOURCE UPSIDE AT LEAST PARTIAL INCLUSION IN MRE M-ZONE SCOTTIE GOLD MINE BEND PARTIALLY INCLUDED IN MRE INCLUDED IN MRE Top Intercepts from 2019 - 2024 37.6 g/t Au over 4.1 m 73.32 g/t Au over 4.28 m 37.2 g/t Au over 3.71 m 46.53 g/t Au over 1.14 m 11.7 g/t Au over 10.95 m BLUEBERRY O-ZONE SCOTTIE
Slide 21: 2025 Work Program
2025 WORK PROGRAM ✔ Targeted drill program focused on resource upgrade and expansion (27,300 m drilled) ✔ Mine design engineering ✔ Phase II ore sor ting study ✔ PEA and FS level geotechnical study ✔ Initiate environmental baseline studies ✔ Complete 10,000 t Sur face Bulk Sample WWW.SCOTTIERESOURCE
Slide 22: SGM Project Timeline
SGM PROJECT TIMELINE 2026 2027 2028 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ENVIRONMENTAL BASELINE EA PATHWAY DECISION COMPLETE PERMIT RECEIVED PRODUCTION MILESTONES FEASIBILITY STUDY & PERMIT APPLICATION RESOURCE UPDATE SUBMITTED PERMITTING EA ENGAGEMENT JPAA DEVELOPMENT JPAA REVIEW ENVIRONMENTAL BASEL
Slide 23: Our Values in Action
OUR VALUES Committed to offering employment, training, and contracting oppor tunities to local IN ACTION First Nations and surrounding community members. Land donation of 1010 hectares to the Meziadin Indigenous Protection Area Active involvement from local in par tnership with the Nature Indigenous
Slide 24: Brad Rourke
BRAD R O U R K E EX EC U T IVE CH AIR +1 250 877-9902 brad@scottieresources.com WWW.SCOTTIERESOURCES.COM 9 0 5 - 1 111 We s t Has t i n g s S t ., Va n cou v er , B C , V 6 E 2 J3 , C an a d a FOOTNOTES 4 1 Schaft Creek Preliminary Economic Assessment (PEA), NI 43-101 Technical Report, Sept 10, 2021