Scottie Resources Corp. · TSXV:SCOT
Scottie Resources — Investor Presentation (April 2021)
17 slides from Scottie Resources's investor presentation, April 2021
Slide 1: Corporate Presentation – April 2021
CORPORATE PRESENTATION – APRIL 2021 TSX.V: SCOT – FSE: SR8 – OST: SCTSF TSX.V: SCOT
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS 2 Forward-looking statements relate to future events or the anticipated performance of the Company and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by t
Slide 3: Directors & Senior Management
DIRECTORS & SENIOR MANAGEMENT 3 President & CEO, Director Bradley Rourke A Corporate Finance Executive with 30 years experience and a proven track record in Mining, Energy, and Real Estate Development. VP Exploration Thomas Mumford, Ph.D, P.Geo Professional exploration geologist with a comprehensive
Slide 4: Golden Triangle
GOLDEN TRIANGLE 4 CURRENT SUCCESSES Seabridge - $1.6 B - 38 Moz gold resource Pretivm - $2.6 B - producing 350,000 gold oz/year Ascot - $300 M - 2,800 ton mill operational in 2022 Tudor - $600 M - maiden resource delivered GT Gold - $400 M - sold to Newmont March 2021 Skeena - $700 M - 4.3 g/t AuEq
Slide 5: Land Package: Over 50,000 Hectares
LAND PACKAGE 5 OVER 50,000 HECTARES OF PROSPECTIVE GROUND IN THE GOLDEN TRIANGLE BORDERING PRETIVM RESOURCES produced 347,743 oz of gold in 2020 ASCOT RESOURCES financed for mill reactivation in 2021 and production in 2022 5 TSX.V: SCOT TSX.V: SCOT
Slide 6: Scottie Gold Project Infrastructure
SCOTTIE GOLD PROJECT 6 INFRASTRUCTURE Four season access road Pretivm transmission line <1.5 km away Stewart, BC deep water port <40 km away Six portals, shafts, rail system, 7 km of drifts Flat areas available for new infrastructure TSX.V: SCOT
Slide 7: Scottie Gold Project
SCOTTIE GOLD PROJECT 7 O-ZONE 1983 GLACIER OUTLINE M & N-ZONES 3600’ PORTAL 3000’ PORTAL C & D-ZONES A PORTAL 2900’ PORTAL SCOTTIE ACCESS ROAD 2800’ PORTAL D PORTAL TAILINGS TAILINGS DRAINED LAKEBED Scottie Gold Mine view west across Summit Lake from Salmon Glacier Road TSX.V: SCOT
Slide 8: Scottie Recent Drill Results
SCOTTIE RECENT DRILL RESULTS 8 TSX.V: SCOT
Slide 9: Blueberry Zone
BLUEBERRY ZONE 9 DISCOVERY OF NEW N-S TREND ROAD ACCESSIBLE NEAR SURFACE MINERALIZATION DRILL TARGETS ALONG 800+M OF STRIKE TSX.V: SCOT
Slide 10: Scottie Gold Mine: Past-Producer with Growth Potential
SCOTTIE GOLD MINE 10 PAST-PRODUCER WITH GROWTH POTENTIAL Existing small mine permit Mine produced 95,426 ounces of gold O-Zone Average recovered grade of 16.2 g/t gold Operated with a 10 g/t gold cutoff Historic drilling was production focused Average hole length was only 75.2 m long M-Zone Zones re
Slide 11: Domino Zone
DOMINO ZONE 11 2020 DRILLING, GRAB SAMPLING & GEOPHYSICS 3 new high-grade showings each with grab samples > 50 g/t gold Coincident IP anomalies Increased extent 900 x 450 m 2.48 g/t gold over 15.46 m SR20-29 inc. 19.9 g/t gold over 0.94 m SR20-37 12.4 g/t gold over 2.69 m SR20-31 13.4 g/t gold over
Slide 12: Scottie Gold Project: Achieved During 2020 Season
SCOTTIE GOLD PROJECT 12 ACHIEVED ACHIEVEDDURING 2020 SEASON DURING 2020 SEASON 7,000 m surface-based drill program Airborne EM survey IP survey over select targets Detailed surface sampling and mapping of newly identified targets Metallurgical testing of tailings First Nation partners >30% workforce
Slide 13: Georgia River
GEORGIA RIVER 13 2020 DRILL PROGRAM 9,157 ha of claims surrounding the past producing Georgia River Mine Mineralization is present as intrusion-related, vein-type Au-Ag Situated on the Portland Canal, 16 km from Stewart with access to a deep-water port in ice free tidewater Underground workings from
Slide 14: Cambria Project
CAMBRIA PROJECT 14 SILVER TARGETS 22,922 hectares of prospective ground 39 showings 5 past-producing mines Polymetallic silver-rich vein systems Mineralization style similar to nearby historic Porter Idaho mine TSX.V: SCOT
Slide 15: Independence & Silver Crown
INDEPENDENCE & SILVER CROWN 15 2021 DRILL TARGETS 2,648 ha of claims with 13 mineral occurrences Mineralization occurs dominantly as polymetallic Au-Ag-Cu-Zn-Pb replacement veins localized along fault structures. Independence - high-grade silver mined in the 1920s and surrounds the crown grants that
Slide 16: 2021 Program
2021 PROGRAM 16 EXPLORATION PROGRAM Drill Program: 16,000 m 3D & 2D IP Survey Downhole EM Survey Trenching Key Targets Advancing Tailings Project TSX.V: SCOT
Slide 17: April 2021 – Pre Merger
APRIL 2021 – PRE MERGER ISSUED & OUTSTANDING 120,418,898 FULLY DILUTED 144,419,352 MARKET CAP $26 MILLION Board & Management 12% NO DEBT ~ $2.8 MILLION IN CASH Retail Investors 63% TSX.V: SCOT – FSE: SR8 – OST: SCTSF Institutions 25% T: 1 (604) 646-1877 E: INFO @ SCOTTIERESOURCES . COM W: WWW .SCOTT
Scottie Resources — Investor Presentation (April 2021) on 6ix