Belo Sun Mining Corp. · TSX:BSX
Belo Sun Mining — Investor Presentation (March 2012)
44 slides from Belo Sun Mining's investor presentation, March 2012

Slide 1: The Largest Developing Gold Project in Brazil
TSX: BSX The LARGEST developing GOLD PROJECT in BRAZIL CORPORATE PRESENTATION March 2012

Slide 2: Cautionary Notes
Cautionary Notes This presentation contains “forward-looking information” within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the prospective mineralization of the properties, planned exploration pr

Slide 3: Experienced Board & Management
Experienced Board & Management BOARD OF DIRECTORS MANAGEMENT Peter Tagliamonte BRAZIL OPERATIONS TORONTO OFFICE Engineer Carlos Costa Ryan Ptolemy Geologist (30 years experience) Chief Financial Officer Stan Bharti Engineer Paulo Fernando Mike Hoffman Jay Hodgson Engineer (27 years experience) Vice

Slide 4: Capital Structure
Capital Structure Shares Outstanding No. 210 million Fully Diluted No. 240 million Share Price (March 1st, 2012) C$ $1.02 Market Capitalization C$ $214 million 52 Week High & Low C$ $1.54 - $0.86 Average Daily Volume No. 1,000,000 (3 month average) Cash & Cash Equivalents C$ $43 million (as at Septe

Slide 5: Key Projects
Key Projects Volta Grande (2.2 Moz M&I) (1.6 Moz Inf) TSX: BSX 5

Slide 6: Volta Grande Infrastructure
Volta Grande Infrastructure TSX: BSX 6

Slide 7: Volta Grande North Block
Volta Grande North Block Ouro Verde Ouro Verde Measured & Indicated: 21.07 Mt (1.2M oz) @ 1.70 g/t Au Inferred: 10.6 Mt (602M oz) @ 1.77 g/t Au Grota Seca Measured & Indicated: 20.7 Mt (1.0M oz) @ 1.61 g/t Au Grota Seca Inferred: 17.4 Mt (936k oz) @ 1.67 g/t Au Volta Grande Total Measured & Indicate

Slide 8: Volta Grande Topography
Volta Grande Topography View from Ouro Verde • Deposit located well above water line • Upstream damming of river will further reduce river level TSX: BSX 8

Slide 9: Volta Grande Vertical Cross Section
Volta Grande Vertical Cross Section Volta Grande Gold Project Ouro Verde Deposit – Cross Section 525NW A B TSX: BSX 9

Slide 10: Ouro Verde Deposit
Ouro Verde Deposit TSX: BSX 10

Slide 11: Ouro Verde – In House 3D Modeling
Ouro Verde – In House 3D Modeling TSX: BSX 11

Slide 12: Volta Grande Vertical Cross Sections
Volta Grande Vertical Cross Sections Volta Grande Gold Project Grota Seca Deposit – Cross Section 1950W A B TSX: BSX 12

Slide 13: Grota Seca Deposit
Grota Seca Deposit TSX: BSX 13

Slide 14: Grota Seca – In House 3D Modeling
Grota Seca – In House 3D Modeling TSX: BSX 14

Slide 15: 75,000 meters drilled in 2011
Resource Expansion 2009 – 2012 2,500,000 1.24 1.66 g/t Au g/t Au 2,000,000 2012–Ongoing Exploration 1.74 70,000 metres of drilling scheduled 75,000 meters drilled in 2011 g/t Au 0.95 8,000 metres drilling per month 1,500,000 g/t Au 1.39 g/t Au ACME prep-lab on site Au oz 1,000,000 1.11 g/t Au Indica

Slide 16: Volta Grande Drilling Program
Volta Grande Drilling Program 2010 – 2012 Infill Infill & Expansion TSX: BSX 16

Slide 17: Volta Grande North Block
Volta Grande North Block Resource Expansion Resource Expansion Resource Expansion Resource Expansion *Please see appendix slide 42 for full information regarding mineral resource estimates TSX: BSX 17

Slide 18: Project Overview
Project Overview Bankable Feasibility Study underway - AMEC Minproc Engenharia e Consultoria Limitada – Dec 2012 Pre-Feasibility Study underway – AMEC Minproc Engenharia e Consultoria Limitada – Aug 2012 70,000 m Drilling Program for 2012 ACME Preparation Lab on site for assays – Construction Comple

Slide 19: Project Timeline
, = 4 Project Timeline BELO nN MINING 2012 2013 2014 | 2015 Q2) Q3 | Q4) QI | Q2) Q3 | Q4 | QI Q2 Q3 | Q4 QI | Q2 | Q3_ Q4 ing (RFP+PAE) Preliminary License — LP (6 months - 1 year) Installation License — LI (6 months) | Prefeasibility Study Bankable Feasibility Study Operation License — LO (5 month

Slide 20: Volta Grande – Preliminary Project Layout
Volta Grande – Preliminary Project Layout TSX: BSX 20

Slide 21: Proposed Location of Plant Facility
Proposed Location of Plant Facility TSX: BSX 21

Slide 22: Historical Exploration
Historical Exploration Ouro Verde Grota Seca Exploration Camp South Block TSX: BSX 22

Slide 23: Regional Geography, Property and Claims Status
Volta Grande Regional Geography Property and Claims Status • Belo Sun claims cover 100km of greenstone belt including 16 known Au occurrences TSX: BSX 23

Slide 24: Volta Grande PEA
Volta Grande PEA Scott Wilson RPA Report, September 2009 Sept 2009 Preliminary NPV Sensitivity to Grade – Gold Price $900 Economic Assessment 500 450 400 1.6 1.5 Grade (g/t) 350 1.4 NPV 300 1.3 20,000 tpd operation producing 200,000 250 1.2 200 ounces/year (7 million tpa) 150 1.1 100 22% IRR and NPV

Slide 25: September 2009 PEA Extrapolation
September 2009 PEA Extrapolation Production Scenario Tonnes Mined 7,000,000 t Grade 1.66 g/t ¹ Mining Dilution 90% Metallurgical Recovery 90% Recovered Gold per Year 9,412,200 g Recovered Gold per Year 332,006 oz SWRPA PEA Inflated Case Double PEA (Sept 2009) (Brazil Inflation − 6.5% for 5 years) Go

Slide 26: Patrocinio Location Map
Patrocinio Location Map 18,750 Ha in the prolific Tapajos gold province TSX: BSX 26

Slide 27: Patrocinio
Patrocinio Tapajos District More than one million ounces of historical gold production at Patrocinio 3.0 km by 1.5 km soil geochemical anomaly defined Grab samples have returned gold values up to 37 g/t in granite and up to 67 g/t in veins IP geophysical survey completed 1,500 meter drill program co

Slide 28: Patrocinio Project Garimpeiro Mining
Patrocinio Project Garimpeiro Mining TSX: BSX 28

Slide 29: Trading History
Trading History Past Year 4,000,000 $1.60 3,500,000 $1.40 3,000,000 $1.20 2,500,000 $1.00 Share price Volume 2,000,000 $0.80 1,500,000 $0.60 1,000,000 $0.40 500,000 $0.20 0 $0.00 Volume Volume Close TSX: BSX 29

Slide 30: Belo Sun Peers – Share Price to NAV Ratio
Belo Sun Peers Share Price to NAV Ratio 1.2 1 0.8 0.6 P/NAV Multiple 0.4 0.2 0 Banro Keegan Romarco Teranga Orezone Canaco* Pretivm Belo Sun Detour Average Gabriel Trelawney Queenston** Rainy River Rubicon Gold Canyon* Source: Jeff Kileen, CIBC World Markets Inc., January 5, 2012 * Valuation based o

Slide 31: Independent Research Coverage
Independent Research Coverage Independent Research – Full Coverage Firm Analyst TD Securities Dan Earle CIBC Jeff Kileen BMO Capital Markets John P. Hayes National Bank Financial Shane Nagle Cormark Securities Richard Gray Independent Research – Research Notes Firm Analyst Dundee Capital Markets Ron

Slide 32: Site Photos
Volta Grande Site Photos TSX: BSX 32

Slide 33: Site Photos – Drill Rig at Volta Grande
Volta Grande Site Photos Drill Rig at Volta Grande TSX: BSX 33

Slide 34: Site Photos – Regional Topography
Volta Grande Site Photos Regional Topography Favorable for Mining TSX: BSX 34

Slide 35: Site Photos – Aerial View of Camp
Volta Grande Site Photos Arial View of Camp TSX: BSX 35

Slide 36: Site Photos – New Camp Facilities
Volta Grande Site Photos New Camp Facilities TSX: BSX 36

Slide 37: For more information, please contact
For more information, please contact: Phone: 416.309.2137 www.belosun.com TSX: BSX TSX: BSX 37

Slide 38: Belo Sun Community Initiatives
Belo Sun Community Initiatives The sign above reads, “Vila Ressaca’s Community clean up day. Join forces with Belo Sun and make a better future for everybody.” TSX: BSX 38

Slide 39: Belo Sun Community Initiatives
Belo Sun Community Initiatives TSX: BSX 39

Slide 40: Geology & Mineralization
Appendix Geology & Mineralization From Scott Wilson RPA Technical NI 43-101 Report, September 2009: The area of the Volta Grande property is underlain by Late Precambrian metavolcanic and metasedimentary rocks, which are intruded by dioritic and granodioritic plutons. The bulk of these rocks are als

Slide 41: Volta Grande PEA Sensitivity Analysis
Volta Grande PEA Sensitivity Analysis Table 1-2 Sensitivity Analysis Verena Minerals Corporation - Volta Grande Project PARAMETER VARIABLES UNITS -40(5)% -20(2.5)% BASE +20(2.5)% +40(5)% Au Grade g/t 0.61 0.81 1.01 1.22 1.42 Operating $/t 8.04 10.72 13.40 16.08 18.76 Capital $ Millions 177 236 295 3

Slide 42: Volta Grande Project Resource Estimate
Appendix Volta Grande Project Resource Estimate VOLTA GRANDE PROJECT RESOURCE ESTIMATE (as at January 2012) MEASURED + VOLTA GRANDE RESOURCES ESTIMATE MEASURED INDICATED INFERRED TOTAL INDICATED Ouro Verde Pit Constrained Tonnes 9,465,751 11,609,792 21,075,543 10,570,881 31,646,424 Ounces @ 0.5 g/t

Slide 43: Resource Depth
Appendix Resource Depth Approximately 79% (55 million tonnes) of the resource occurs within 200 meters from surface TSX: BSX 43

Slide 44: Local Geology
Appendix Local Geology Gold mineralization is associated with a major shear zone and is hosted in intense hydrothermally altered rocks with close association with disseminated sulphides (py/apy): Intense silicification with fine- grained sulphide (mainly apy) within strongly sheared diorite – Grota
Source: Internet Archive copy of belosun.com
More decks from Belo Sun Mining Corp.
BMO Mining Conference 202324 slides · 2023
TD Mining Conference 202119 slides · Dec 30, 2021
Gold Stock Analyst Conference 202125 slides · 2021
Investor Presentation (July 2019)24 slides · July 2019
Investor Presentation (October 2017)34 slides · October 2017
Shareholder Meeting (June 2017)8 slides · Jun 7, 2017