Belo Sun Mining — Investor Presentation (July 2019)

24 slides from Belo Sun Mining's investor presentation, July 2019

  1. Slide 1: Developing the Open Pit Volta Grande Gold Project, Brazil

    Developing the Open Pit Volta Grande Gold Project, Brazil The largest undeveloped gold deposit in Brazil July 2019 TSX:BSX

  2. Slide 2: Introductory Matters

    Introductory Matters Currency: All dollar figures represent U.S dollars unless otherwise noted. Market and Industry Data: Unless otherwise indicated, the market and industry data contained in this document is based upon information from independent industry publications, market research, analyst rep

  3. Slide 3: Volta Grande Gold Project

    Volta Grande Gold Project Location Mining Highlights Strong Economics ▪ Largest undeveloped gold ▪ 268kozAu/yr (first 10 yrs) ▪ CAPEX of $298 million deposit in Brazil ▪ Reserves: 3.8 Moz at 1.02 g/t (1) ▪ Post-Tax NPV of $665M; ▪ Para is 2nd most active mining state ▪ AISC operating costs: $779/ozA

  4. Slide 4: Volta Grande Project Location

    Volta Grande Project Location Para is the 2nd most active mining state in Brazil ▪ Estimated mineral resources of 6.2 million Au oz: Largest undeveloped gold project in Brazil ▪ Para has a well developed mining Infrastructure, mining services and a large experienced labour pool ▪ Project located in

  5. Slide 5: Excellent Infrastructure

    Excellent Infrastructure Altamira City – 150,000 residents Altamira Airport Belo Monte & Pimental Dams Easy Accessible by road World’s 3rd largest hydroelectric dam Volta Grande Property Outline Volta Grande Exploration Camp TSX: BSX | 5

  6. Slide 6: Mining Highlights

    Mining Highlights Feasibility Study Highlights (March 2015) Production ▪ First 10 years: 268,000 oz gold annually (2) ▪ Avg. LOM annual gold production of 205,000 oz (17 yr mine life) Economics ▪ Pre-Tax IRR of 37%; Post-Tax IRR of 26% ($1,200/oz Au) ▪ Pre-Tax NPV of $942 M; Post-Tax NPV of $665 M (

  7. Slide 7: Operating Costs, Grade & Annual Production

    Mining Highlights Operating Costs, Grade & Annual Production* $40.00 1.80 300,000 275,000 $35.00 1.60 250,000 Cost per Tonne Ore Milled 1.40 $30.00 225,000 Ounces Produced 1.20 200,000 Grade (g/t) $25.00 175,000 1.00 $20.00 150,000 0.80 125,000 $15.00 0.60 100,000 $10.00 75,000 0.40 50,000 $5.00 0.2

  8. Slide 8: Strong Economics

    Strong Economics $1,200/oz Au; $US1:R3.10 $1,200/oz Au; $US1:R3.9 $1,400/oz Au; $US1:R3.9 (Feasibility Study, March 2015) ▪ Post-Tax IRR of 36.7% ▪ Post-Tax IRR of 49.1% ▪ Post-Tax IRR of 26% ▪ Post Tax NPV @ 5% $854M ▪ Post Tax NPV @ 5%: $1,231M ▪ Post-Tax NPV @5%: $665M ▪ 2.9 year payback ▪ 2.3 ye

  9. Slide 9: Strong Economics: Cash Flow Model

    Strong Economics Cash Flow Model (after-tax) $1,300/oz Au; $US1:R3.7 $1,200/oz Au; $US1:R3.1 (Feasibility Study, March 2015) TSX: BSX | 9

  10. Slide 10: Permitting and Engineering Status

    Permitting and Engineering Status Environmental Licence granted in 2012 ▪ Issued by the State of Para (Second largest Mining State in Brazil) ▪ The State of Para Environmental Agency is SEMAS (State Environmental Agency for the Government of Para). ▪ SEMAS issued the Environmental Licence in 2012 Ba

  11. Slide 11: Permitting and Engineering Status (cont'd)

    Permitting and Engineering Status (cont’d) April 2017: Interim Suspension Order Related to Construction Licence ▪ Issued by a judge from the Brazilian Federal Regional Court ▪ According to the order, the licence is to be suspended until the Indigenous Study has been approved by FUNAI ▪ FUNAI decline

  12. Slide 12: Mineral Resources & Reserves

    Mineral Resources & Reserves GREIA EXPLORATION VOLTA GRANDE CONCESSIONS MINING PROJECT SOUTH BLOCK Mineral Resources(2) & Reserves(1) Tonnes Gold Grade Contained Gold Volta Grande P&P Reserves 115,969,000 1.02 g/t 3,788,000 oz M&I Resource 156,593,000 0.98 g/t 4,956,000 oz Inferred Resource 39,767,0

  13. Slide 13: Exploration Upside

    Exploration Upside VOLTA GRANDE SOUTH BLOCK 250,000 Drilling has translated to Excellent mineral significant mineral growth growth potential in in the North Block. the South Block with further drilling. 200,000 150,000 Meters Drilled * 100,000 50,000 Ind: M&I: M&I: 0.8 Moz 5 Moz 0.2 Moz Inf: Inf: In

  14. Slide 14: Next Steps

    Next Steps Continue Project Development Activities in Advance of Construction ▪ Complete the indigenous data collection ▪ Finalizing discussions with mine contractors ▪ Experienced, Brazil-based operations team in place ▪ Mining software training ▪ Continue engineering work ▪ Supporting permits (qua

  15. Slide 15: Appendices

    Appendices

  16. Slide 16: Company Structure & Performance

    Company Structure & Performance Capitalization Summary (Q1 ending Mar. 31, 2019) Major Shareholder Distribution Sun Valley Gold ~20% Shares Outstanding 442,631,915 Canadian Gold Funds ~20% Options 17,335,333 Management & Insiders ~15% European Gold Funds ~7% US Gold Funds ~6% Cash & Cash Equivalents

  17. Slide 17: Experienced Board & Management

    Experienced Board & Management Management Team Peter Tagliamonte, P.Eng. MBA, President & CEO, Director ▪ 30 years of mine development and operations experience, including 20 years in Central and South America. Former CEO of Sulliden Gold, Central Sun Mining and COO of Desert Sun. Ian Pritchard, Chi

  18. Slide 18: Volta Grande Site Plan (Feasibility Study, Mar. 2015)

    Volta Grande Site Plan (Feasibility Study, Mar. 2015)

  19. Slide 19: Project Performance

    Volta Grande - Feasibility Study Details Project Performance Total ore mined 116 Mt Operating Cost Breakdown Waste mined 504 Mt Strip ratio 4.27 Avg. gold grade 1.02 g/t Au 39% Processing method Gravity/CIP/EW Processing Annual tonnes milled 6.75 Mt 57% Mining Plant recovery 93% Recovered 3.53 M oz

  20. Slide 20: Construction Capital Breakdown

    Volta Grande - Feasibility Study Details Construction Capital Breakdown Volta Grande Project Capital Allocation (3.1:1 BRL/US Exchange Rate) Overall site - Mine & waste rock dump $20.7 M Mine fleet $24.3 M Crushing plant $6.4 M Plant $71.1 M Tailings $7.4 M Infrastructure $33.6 M Ancillaries $20.4 M

  21. Slide 21: Enterprise Value per Mineral Resource

    Enterprise Value per Mineral Resource Belo Sun compelling valuation – significantly undervalued to peers (US$/AuEq oz) Source: BMO Capital Markets TSX: BSX | 21

  22. Slide 22: Post-Payback Mine Life

    Post-Payback Mine Life Source: BMO Capital Markets TSX: BSX | 22

  23. Slide 23: Capital as % of NPV

    Capital as % of NPV 1,221% 189% 133% 102% 96% 96% 86% 81% 73% 72% 45% 45% Source: BMO Capital Markets TSX: BSX | 23

  24. Slide 24: Thank You