Belo Sun Mining Corp. · TSX:BSX

Belo Sun Mining — Gold Stock Analyst Conference 2021

25 slides from Belo Sun Mining's conference presentation, 2021

  1. Slide 1: Volta Grande Gold Project

    Volta Grande Gold Project The largest undeveloped gold deposit in Brazil Gold Stock Analyst Conference 2021 TSX:BSX

  2. Slide 2: Cautionary Notes

    Cautionary Notes Currency: All dollar figures represent U.S dollars unless otherwise noted. Market and Industry Data: Unless otherwise indicated, the market and industry data contained in this document is based upon information from independent industry publications, market research, analyst reports

  3. Slide 3: Volta Grande Gold Project agenda

    Volta Grande Gold Project ▪ Project Highlights ▪ Project Location / Infrastructure ▪ Project Update ▪ Economics / Operations ▪ Mineral Resources / Exploration ▪ Value for Investors TSX: BSX | 3

  4. Slide 4: Volta Grande Gold Project - Highlights

    Volta Grande Gold Project - Highlights Highlights ▪ Largest Undeveloped Gold Project in Brazil ▪ Excellent Infrastructure ▪ 268kozAu/yr (first 10 yrs) at 1.38 g/t (1) ▪ Life of Mine Au Production: 3.53 Moz ▪ Feasibility Mineral Reserves: 3.8 Moz ▪ Feasibility Mineral Resources: M&I: 5.0 Moz and Inf:

  5. Slide 5: Mining Highlights (first years)

    Mining Highlights (first 10 years) Operating Costs and Annual Production* $40.00 1.80 300,000 oz 2.0 g/t 275,000 oz $35.00 1.60 250,000 oz Cost per Tonne Ore Milled 1.40 $30.00 225,000 oz Ounces Produced 1.20 200,000 oz Grade (g/t) $25.00 175,000 oz 1.01.00 g/t $20.00 150,000 0.80 125,000 $15.00 0.6

  6. Slide 6: Volta Grande Gold Project - Location

    Volta Grande Gold Project - Location ▪ The Volta Grande Project is located in Para State, the 2nd most active mining state in Brazil. Volta Grande is the largest undeveloped Gold deposit in Brazil ▪ The future mine and all related infrastructure will be located on farmland or previous mine workings

  7. Slide 7: Excellent Infrastructure

    Excellent Infrastructure Altamira City – 150,000 residents Altamira Airport Belo Monte & Pimental Dams Easy Accessible by road World’s 3rd largest hydroelectric dam Volta Grande Gold Project Volta Grande Land TSX: BSX | 7

  8. Slide 8: Volta Grande Gold Project - Update

    Volta Grande Gold Project - Update Successful Permitting Record - Project Status ▪ EIA (Environmental Impact Assessment) completed in 2012 ▪ Environmental Licence (LP) granted in 2012 ▪ Feasibility Study completed in 2015 ▪ Indigenous Study completed in 2016 *Submitted along with construction licens

  9. Slide 9: Strong Economics

    Strong Economics Feasibility Study, March 2015 Current Gold Price & Exchange Rate $1,200/oz Au; $US1:R3.10 $1,650/oz Au; $US1:R5.5 ▪ Post-Tax IRR of 26% ▪ Post-Tax IRR of 55% ▪ Post-Tax NPV @5%: $665M ▪ Post Tax NPV @ 5%: $1.8 Billion ▪ 4 year payback ▪ 2.0 year payback 56% Post-Tax Internal Rate of

  10. Slide 10: Strong Economics - Cumulative Cash Flow

    Strong Economics Cumulative Cash Flow (after-tax, undiscounted ) Cumulative Cashflow after tax US$ 2.88 Billion After Tax $3,500,000,000 $3,000,000,000 $2,500,000,000 $2,000,000,000 $1,500,000,000 $1,000,000,000 $500,000,000 $- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -$500,000,000 $1,650/

  11. Slide 11: Project Performance

    Volta Grande - Feasibility Study Details 2020 Project Performance Operating Cost Breakdown Annual tonnes milled 6.75 Mt Avg. gold grade (First 10 years) 1.38 g/t Au Plant recovery 93% Annual production (First 10 years) 268,000 oz 39% Recovered Gold over LOM 3.53 M oz Au Processing 57% Processing met

  12. Slide 12: Operating Costs: 2015 vs. 2020

    Volta Grande Gold Project 2020 Operating Costs: 2015 vs. 2020 Feasibility Study 2015 Current 2020 Mining Operating Costs (LOM Average) (LOM Average) General Mine & Engineering $0.06/t $0.06/t Drilling $0.15/t $0.13/t Blasting $0.28/t $0.32/t Loading $0.22/t $0.22/t Hauling $0. 64/t $0. 64/t Support

  13. Slide 13: Construction Capital Breakdown

    Volta Grande - Feasibility Study Details 2020 Construction Capital Breakdown Volta Grande Project Capital Allocation (3.1:1 BRL/US Exchange Rate) Overall site Mine & waste rock dump $20.7 M Mine fleet $24.3 M Crushing plant $06.4 M Plant $71.1 M Tailings $07.4 M Infrastructure $33.6 M Ancillaries $2

  14. Slide 14: Mineral Resources / Exploration

    MINERAL RESOURCES / EXPLORATION Volta Grande Gold Project

  15. Slide 15: Located Within Large Gold Belt

    Located Within Large Gold Belt Amazon Basin Altamira Parnaíba Basin Volta Grande Project Três Palmeiras Greenstone Belt (+120 km strike; 1km-8km width) Geological data accumulated on Bacajá Domain Tapajós Province the entire belt to date: ▪ 11,000 soil samples (mostly taken in the mineral resource a

  16. Slide 16: Tres Palmeiras Greenstone Belt

    Tres Palmeiras Greenstone Belt Volta Grande Gold Project - North Block South Block Sector 1 Sector 2 Sector 3 Sector 4 16

  17. Slide 17: Mineral Resources

    Mineral Resources Geological data on belt to date: ▪ 11,000 soil samples (mostly taken in the mineral resource area) GREIA ▪ 900 surface rock samples ▪ 9,981m of drilling (excluding resource drilling) EXPLORATION VOLTA GRANDE GOLD PROJECT CONCESSIONS (+120 km strike; 1km-8km width) North Block SOUTH

  18. Slide 18: Exploration Targets 2017/2018

    Exploration Targets 2017/2018 Volta Grande Gold Project – North Block OURO VERDE 1 Mineral growth along strike GREIA JUNCTION Mineral growth in Greia 2 GROTA SECA 3 Explore and upgrade South Block target Grassroots exploration drilling elsewhere on greenstone belt 4 TSX: BSX | 18

  19. Slide 19: Exploration Upside – South Block

    Exploration Upside – South Block VOLTA GRANDE GOLD PROJECT SOUTH BLOCK North Block 250,000 Excellent mineral Drilling has translated to growth potential in significant mineral growth the South Block with in the North Block. further drilling. 200,000 150,000 Meters Drilled 6.1 Moz * 100,000 50,000 In

  20. Slide 20: Investor Value

    INVESTOR VALUE Volta Grande Gold Project

  21. Slide 21: Benchmarking Shareholder Value

    Benchmarking Shareholder Value Operating and Permitted Open Pit Gold Projects in the Americas Reserve Au Ounces vs Reserve Grade Au g/t 13,000,000 1 gram per Tonne line 12,000,000 11,000,000 10,000,000 Total Contained Gold Reserves, Oz 9,000,000 8,000,000 7,000,000 6,000,000 5,000,000 4,000,000 BSX

  22. Slide 22: Benchmarking Shareholder Value

    Benchmarking Shareholder Value Primary Gold Bankable Feasibility Mine Life Annual Production Cash Costs Shovel-Ready and Projects in the Study >10 Years >150 koz <US$750/oz Actionable Americas IRR >25% Only 1: 461 68 32 23 5 Volta Grande Volta Grande is the only shovel-ready, actionable gold project

  23. Slide 23: Company Structure & Performance

    Company Structure & Performance Capitalization Summary (Q2 ending June 30, 2019) Major Shareholder Distribution Sun Valley Gold ~24% Shares Outstanding 442,631,915 Canadian Gold Funds ~15% Options 17,221,333 Management & Insiders ~15% European Gold Funds ~7% US Gold Funds ~6% Cash & Cash Equivalents

  24. Slide 24: Summary & Value Proposition

    Summary & Value Proposition ▪ Advancing one of Brazil’s largest undeveloped gold projects in a prolific mining district and mine-friendly jurisdiction ▪ Strong Cash Position $32 million ▪ Advanced stages of permitting ▪ Strong Production Profile & Robust Project Economics ▪ Large Resources/Reserves

  25. Slide 25: Thank You

    Thank You Developing the Open Pit Volta Grande Gold Project, Brazil The largest undeveloped gold deposit in Brazil Gold Stock Analyst Conference 2021 TSX:BSX

Belo Sun Mining — Gold Stock Analyst Conference 2021 on 6ix