  1. Slide 1: Evander Gold Mining Presentation

    EVANDER GOLD MINING PRESENTATION FEBRUARY 2017

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is provided on a confidential basis. The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document

  3. Slide 3: Agenda

    AGENDA • Introduction to EGM › Location › History › Health & Safety › Human Resources › Geology › Resource & Resources • Evander 8 Shaft › Geology › Infrastructure › Mining Method • Processing Plant • ETRP • Future Projects 3

  4. Slide 4: Introduction to EGM: Location & History

    INTRODUCTION TO EGM LOCATION & HISTORY

  5. Slide 5: Evander Operations Location Map

    EVANDER OPERATIONS LOCATION MAP 5

  6. Slide 6: History

    HISTORY • Evander gold field discovered in 1951 • Sinking of first shafts started in 1956 (Winkelhaak 1& 3 shaft) • First gold pour in July 1958 • Three other mining complexes developed afterwards namely: Leslie, Bracken and Kinross • In 1996 all four mining companies consolidate to form Evander Gol

  7. Slide 7: History

    HISTORY • Union Corporation Limited : 1953 - 1980 • Gencor Group : 1981 - 1988 • Genmin Group : 1989 • Gengold Group : 1990 - 1995 • Goldfields : 1996 - 1997 * • Harmony (R545 million) : 1998 - 2013 • Pan African Resources (R 1.5 bn) : 28th February 2013 * EVANDER GOLD MINES LIMITED WAS CREATED IN 1

  8. Slide 8: Operations History

    EVANDER OPERATIONS HISTORY Historical production (up to June 2016) Operation Tons milled Grade Gold Gold (Mt) (g/t) (Tonnes) (Moz) Winkelhaak Mine 74.7 7.6 565 18 Kinross Mine 67.5 6.8 459 15 Leslie Mine 41.4 6.3 259 8 Bracken Mine 26.4 8.8 232 7 Total 210.0 7.2 1 515 49 8

  9. Slide 9: Introduction to EGM: Health and Safety

    INTRODUCTION TO EGM HEALTH AND SAFETY

  10. Slide 10: Health Aim

    HEALTH AIM PREVENTION OF OCCUPATIONAL & NON- OCCUPATIONAL DISEASES AND INJURIES 10

  11. Slide 11: Evander Health Hub

    EVANDER HEALTH HUB 11 11

  12. Slide 12: The Big Six

    THE BIG SIX WE CAN BEAT HIV/AIDS IN OUR LIFETIME. IS CURABLE, NO ONE DESERVES TO DIE FROM IT. LIFESTYLE IS A PERSONAL THING. BE RESPONSIBLE FOR YOUR OWN HEALTH. CAN BE A SILENT KILLER. MONITOR YOUR BLOOD PRESSURE. IT HAS NO CURE. PROTECT YOURSELF FROM DUST INHALATION. WEAR NOISE CLIPPERS, EAR MUFFLE

  13. Slide 13: Behaviour Based Safety Drive Phase 4

    BEHAVIOUR BASED SAFETY DRIVE “Phase 4” 13

  14. Slide 14: Safety History - LTIFR

    SAFETY HISTORY - LTIFR 35.00 29.90 30.00 25.00 20.00 18.94 19.11 17.72 15.00 9.68 10.00 6.87 5.00 4.16 4.13 4.9 3.74 3.33 2.35 - 2004 -2005 2005 - 2006 2006 - 2007 2007 - 2008 2008 - 2009 2009 - 2010 2010 -2011 2011 -2012 2012 -2013 2013 -2014 2014 -2015 2015 - 2016 14

  15. Slide 15: Human Resources

    HUMAN RESOURCES

  16. Slide 16: Operations Labour Information

    EVANDER OPERATIONS LABOUR INFORMATION • Labour (2424 employees): Contractors - 890 • Trade union representation: › National Union of Mineworkers (NUM) – approximately 90% › UASA – approximately – 5% › No Union - approximately – 5% • Member of the Chamber of Mines 16

  17. Slide 17: Introduction to EGM: Geology

    INTRODUCTION TO EGM GEOLOGY

  18. Slide 18: Evander Operations Geology

    EVANDER OPERATIONS GEOLOGY 18

  19. Slide 19: Evander Operations Geology

    EVANDER OPERATIONS GEOLOGY 19

  20. Slide 20: Evander Operations Geology

    EVANDER OPERATIONS GEOLOGY Main Kinross Channel • Evander Basin is a subsidiary of the Wits Basin • Kimberly Reef – tabular ore-body • Gold mineralisation derived from the underlying footwall • Footwall material originates from greenstone provenance • Major payshoots trends in the SE-NW direction 20

  21. Slide 21: Section across the Evander Basin

    EVANDER OPERATIONS GEOLOGY Section across the Evander Basin 21

  22. Slide 22: Introduction to EGM: Resource & Reserves

    INTRODUCTION TO EGM RESOURCE & RESERVES

  23. Slide 23: Resource & Reserves

    RESOURCE & RESERVES Poplar Rolspruit Evander South 23

  24. Slide 24: Mineral Resources

    MINERAL RESOURCES Measured Indicated Inferred Total EGM UNDERGROUND Tonnes Grade Gold Ounces Tonnes Grade Gold Ounces Tonnes Grade Gold Ounces Tonnes Grade Gold Ounces Operations (Mt) (g/t) (Tonnes) (Moz) (Mt) (g/t) (Tonnes) (Moz) (Mt) (g/t) (Tonnes) (Moz) (Mt) (g/t) (Tonnes) (Moz) Evander 7 0.5 11.

  25. Slide 25: Mineral Reserves

    MINERAL RESERVES Proved Probable Total EGM UNDERGROUND Tonnes Grade Gold Ounces Tonnes Grade Gold Ounces Tonnes Grade Gold Ounces Operations (Mt) (g/t) (Tonnes) (Moz) (Mt) (g/t) (Tonnes) (Moz) (Mt) (g/t) (Tonnes) (Moz) Evander 7 Vamping 0.04 1.6 0.1 0.002 0.04 1.6 0.1 0.002 Evander 8 3 8.0 21 0.7 2

  26. Slide 26: Evander 8 Shaft: Geology

    EVANDER 8 SHAFT GEOLOGY

  27. Slide 27: Evander Shaft

    EVANDER OPERATIONS Evander 8 Shaft 27

  28. Slide 28: Evander 8 Shaft - Geology

    EVANDER OPERATIONS 8 SHAFT - GEOLOGY No 8 Shaft 28

  29. Slide 29: Evander 8 Shaft - Geology

    EVANDER OPERATIONS 8 SHAFT - GEOLOGY Life of Mine 16 Years 29

  30. Slide 30: Evander Operations Grade Distribution

    EVANDER OPERATIONS GRADE DISTRIBUTION f f 8 Shaft Underground samples & Block Model N01 N02 (cmg/t) 24A N01E N03 N01 N04 A f N01E N01F f 30

  31. Slide 31: Evander 8 Shaft: Infrastructure

    EVANDER 8 SHAFT INFRASTRUCTURE

  32. Slide 32: Evander 8 Operations Shaft Layout

    EVANDER 8# OPERATIONS 8 Shaft 7 Shaft Met Plant Rock winder 11 L 12 L 13 L 14 L 15 L 150 m³ Fan 16 L 5 MW BAC 17 L 2 x York 5 MW Raise bore Holes fridge plants BAC 18 L 19 L 17 – 24 Vent Shaft 20 L 21 L 22 L 23 L 24 L New Decline 24 – 25 Level 25 L 32

  33. Slide 33: Evander Operations Infrastructure

    EVANDER OPERATIONS INFRASTRUCTURE Processing Plant 17 Level Depth 1 857m 505m Depth 2 048m 3 989m Decline Conveyor Belt System (50 000 tpm) 33 33

  34. Slide 34: Evander 8 Shaft: Mining Method

    EVANDER 8 SHAFT MINING METHOD

  35. Slide 35: Operations – Mining Method

    EVANDER OPERATIONS – MINING METHOD 1st portion of raise line mined Raise development Intermediate Travelling way 35

  36. Slide 36: Operations – Mining Method

    EVANDER OPERATIONS – MINING METHOD C/gully 15 m Stability pillar Mining Direction Mining Direction Mining Direction Mining Direction Ore pass 36

  37. Slide 37: Operations – Mining Method

    EVANDER OPERATIONS – MINING METHOD • CONVENTIONAL SCRAPER MINING • STRIKE AND DIP SCRAPING • MINING CONFIGURATION – UPSIDE DOWN XMAS TREE • VERY LITTLE SEISMIC ACTIVITY • PANEL LENGTH ± 30M • STOPING WIDTH ± 126CM • PNEUMATIC ROCK DRILLS • TIME BLASTING • DRILLING AND SUPPORT – DAYSHIFT • CLEANING –

  38. Slide 38: Processing Plant

    PROCESSING PLANT

  39. Slide 39: Evander Operations Processing Plant

    EVANDER OPERATIONS PROCESSING PLANT 39

  40. Slide 40: Evander Operations Processing Plant

    EVANDER OPERATIONS PROCESSING PLANT • 12 * SILOS (10 * 16M) • 6 * MILLS – CAPACITY 160 000 TPM • 5 * THICKENERS (6 000M³ EACH) • 14 LEACH TANKS (834M³ EACH) • TREATMENT SECTION (240 000 TPM) • ELUTION CIRCUIT • SMELT AND DISPATCHED GOLD BARS TO RAND REFINERY 40

  41. Slide 41: ETRP

    ETRP

  42. Slide 42: ETRP

    ETRP • ETRP (Evander Tailings Retreatment Plant) is the re-mining of the Kinross dam (58 million tonnes) • Mining at a rate of 200 000t per month • Processing the slimes at the Kinross plant • Average head grade at 0,32g/t • Recoveries at 42% to 50% 42

  43. Slide 43: ETRP Plant and TSF

    ETRP Plant Dam 1 Dam 3 Dam 2 TSF 43

  44. Slide 44: ETRP Grade Distribution of the Kinross Dam

    ETRP Grade distribution of the Kinross Dam Kinross Dam Dam 1 Dam 3 Dam 2 44

  45. Slide 45: Future Projects

    FUTURE PROJECTS EVANDER GOLD MINING

  46. Slide 46: Evander Growth Projects

    EVANDER GROWTH PROJECTS EGM Growth Projects Possible Resource Oz (000) 12 10 Rolspruit, 8,851 5 Decline, 927 8 Poplar, 5,092 Evander South, 4,964 6 9 Shaft A Block, 322 7 Shaft 2010, 2,182 4 Elikhulu, 1,674 7 Shaft Pillars, 318 2 7 Shaft Vamping, 5 EGM Reserves, 1,492 0 0 5 10 15 20 46

  47. Slide 47: Future Projects: Elikhulu

    FUTURE PROJECTS ELIKHULU (BIG ONE)

  48. Slide 48: Elikhulu

    ELIKHULU EVANDER “ELIKHULU” PROJECT: (1 000 000T / MONTH) • RE-TREATMENT OF THE TAILINGS STORAGE FACILITIES OF KINROSS, LESLIE & WINKELHAAK • KINROSS – 42 HOLES DRILLED • LESLIE – 90 HOLES DRILLED • INCLUDED 39 SONIC DRILLED HOLES • WINKELHAAK – 38 HOLES DRILLED • GRADE MODEL DEVELOPED (SIGNED OFF B

  49. Slide 49: Elikhulu Location Plan

    ELIKHULU LOCATION PLAN New Elikhulu Plant Kinross Dam Photo of all 3 dams New Tailings Dam Leslie Dam Winkelhaak Dam 49

  50. Slide 50: Elikhulu Mineral Resource

    ELIKHULU MINERAL RESOURCE MINERAL RESOURCES CATEGORY TONNES GRADE GOLD OUNCES (MT) (G/T) (TONNES) (MOZ) Measured - - - - Indicated 193 0.29 56 1.8 Inferred 22 0.35 8 0.24 TOTAL 215 0.30 63 2.04 50

  51. Slide 51: Future Projects: Poplar

    FUTURE PROJECTS POPLAR

  52. Slide 52: Poplar Location

    Zz fe) < U O = fad < a. O a EVANDER OPERATION: - 52

  53. Slide 53: Poplar Background

    POPLAR BACK GROUND • Previously drilled however limited information available (core lost / incomplete information) • 12-month drilling program conducted in FY11 (Dec 2010) › 23 Holes (20 106 meters) › 77 reef intersections › Indicated additional drilling required • Geological model updated using com

  54. Slide 54: Poplar

    POPLAR Surface Bore Holes Depths below Surface 54

  55. Slide 55: Poplar Mineral Resource

    POPLAR MINERAL RESOURCE Mineral resources Category Tonnes Grade Gold Ounces (Mt) (g/t) (Tonnes) (Moz) Measured - - - - Indicated 14.3 7.86 112 3.6 Inferred 6.7 6.92 46 1.5 Total 21.0 7.56 158 5.1 55

  56. Slide 56: Poplar

    112000 -¥ Measured (OK) Indicated (OK) | inferred (Sichet's t) 19000 -¥ 16000 -¥ -12800 -X 18600 -X - 56

  57. Slide 57: Future Projects: Evander South

    FUTURE PROJECTS EVANDER SOUTH

  58. Slide 58: Evander South Location

    EVANDER SOUTH LOCATION EVANDER SOUTH 58

  59. Slide 59: Evander South Background

    EVANDER SOUTH BACKGROUND • Previously extensively drilled by AAC (core and logs preserved and available) • Harmony concluded a 24-month drilling programme in early FY10 (Oct 2009) › 43 Holes (24 700 meters) › 99 reef intersections • Geological model updated using in FY10 and signed off by SRK • Reso

  60. Slide 60: Evander South

    EVANDER SOUTH Surface Bore Holes Depths below Surface 60

  61. Slide 61: Evander South Mineral Resource

    EVANDER MINERAL RESOURCE Mineral resources Category Tonnes Grade Gold Ounces (Mt) (g/t) (Tonnes) (Moz) Measured - - - - Indicated 10.3 9.30 96 3.1 Inferred 8.9 6.62 59 1.9 Total 19.2 8.06 154 5.0 61

  62. Slide 62: Evander South

    S ‘S) PAN Resour EVANDER SOUTH 000 2500

  63. Slide 63: Future Projects: Rolspruit

    FUTURE PROJECTS ROLSPRUIT

  64. Slide 64: Rolspruit Location

    ROLSPRUIT LOCATION ROLSPRUIT 64

  65. Slide 65: Rolspruit Background

    ROLSPRUIT BACK GROUND • Rolspruit lies north of Evander 8 Shaft and is the down dip extension of the payshoot • Rolspruit is a high grade orebody at depth of between approximately 1 800 and 2 800m below surface • Historically a total of 47 drill holes were drilled (with some 170 deflections) – not a

  66. Slide 66: Rolspruit

    ROLSPRUIT Surface Bore Holes 66

  67. Slide 67: Rolspruit

    ROLSPRUIT Depths below Surface 67

  68. Slide 68: Rolspruit Mineral Reserves & Resources

    ROLSPRUIT MINERAL RESERVES & RESOURCES Mineral resources Category Tonnes Grade Gold Ounces (Mt) (g/t) (Tonnes) (Moz) Measured - - - - Indicated 24.4 10.92 267 8.6 Inferred 0.9 9.17 9 0.3 Total 25.4 10.86 275 8.9 Category Tonnes Grade Gold Ounces (Mt) (g/t) (Tonnes) (Moz) Proven - - - - Probable 23.4

  69. Slide 69: Rolspruit

    & ra] & $ $ « «< -18000 -X 20500 -X a 25000 -X Tasman) N 0,3) (3.6) 6,9] 9,15) 15,20] 25500 -X 20,120) > i 4 s 3 3 3 A 0) A 0082] A 0005) eS -20500 -X +23000 -X - 69

  70. Slide 70: Location – Growth Projects

    LOCATION – GROWTH PROJECTS Evander 8 Shaft 5 Decline Evander 7 Shaft Evander 7 Shaft 2010 Payshoot Vamping & Pillars Evander 9 Shaft A-Block 70

  71. Slide 71: Future Projects: 2010 Payshoot

    FUTURE PROJECTS 2010 PAYSHOOT

  72. Slide 72: 2010 Payshoot

    2010 PAYSHOOT EGM EGM Grade Grade Distribution Distribution & & Surface Surface Holes Holes 5 Decline 2010 Payshoot Kinross Payshoot 17 Km 72

  73. Slide 73: 2010 Payshoot

    2010 PAYSHOOT 2010 Payshoot Proposed Surface Holes First hole EGM PAR1 73

  74. Slide 74: 2010 Payshoot Resource

    2010 PAYSHOOT Tonnes Grade Contained Gold 7 Shaft 2010 Payshoot Category million g/t Tonnes Moz Kimberley Reef Measured 0.52 11.02 5.8 0.19 Indicated 0.34 10.02 3.5 0.11 Inferred 5.41 10.85 58.7 1.89 Total 6.27 10.82 67.9 2.18 74

  75. Slide 75: Future Projects: Shaft A-Block

    FUTURE PROJECTS 9 SHAFT A - BLOCK

  76. Slide 76: 9 Shaft A-Block

    9 SHAFT A-BLOCK 9 Shaft A-Block 1 Level ~3Km from station 76

  77. Slide 77: 9 Shaft A-Block Structure Plan

    9 SHAFT A-BLOCK STRUCTURE PLAN Resource above 1Level Resource below 1Level Potential of More Resource further to the west 77

  78. Slide 78: 9 Shaft Resource

    9 SHAFT RESOURCE Tonnes Grade Contained Gold Evander 9 Shaft Category million g/t Tonnes Moz Kimberley Reef Measured 0.11 13.70 1.6 0.05 Indicated 0.07 14.00 1.0 0.03 Inferred 0.65 11.57 7.5 0.24 Total 0.83 12.07 10.0 0.32 78

  79. Slide 79: Questions

    RESOURCES pic QUESTIONS

  80. Slide 80: Thank You

    RESOURCES THANK YOU ee, 7 ers