Barton Gold Holdings Limited · ASX:BGD

Barton Gold — Zurich Precious Metals Summit 2024

21 slides from Barton Gold's conference presentation, Nov 12, 2024

  1. Slide 1: South Australia's 1.6 Moz Au Growth Platform

    ASX:BGD FRA:BGD3 OTCQB:BGDFF South Australia’s 1.6 Moz Au Growth Platform 12 November 2024 | Zurich Precious Metals Summit Perseverance Mine, Tarcoola Project

  2. Slide 2: Important Notices

    Important Notices Disclaimer This document has been approved by the Board of Barton Gold Holdings Limited (ACN 633 442 618) (together with its affiliates, “Barton” or the “Company”) and has been prepared for the exclusive use of the party to whom Barton delivers this document (the “Recipient”). The

  3. Slide 3: 1.6 Moz SA Developer

    1.6 Moz SA Developer Strategic ‘first mover’ with existing infrastructure in a proven gold district Leading the re-emergence of South Australian gold • South Australia: 25% of Australian gold / 2.5% of production (1) • Central Gawler Craton: 130 year gold production history (2) • ~5,000km2 tenements

  4. Slide 4: Capital Structure

    Capital Structure Register consolidating around strong management and track record of reliable, low-dilution progress ($AUD) Share Distribution (5) Shares on issue (1) 218.7 million Board & Management 20% 22% Market Cap ($0.29 / share) (2) $62.3 million Institutional & Corporate Cash (3) $8.8 millio

  5. Slide 5: Experienced Leadership

    Experienced Leadership Strong SA and gold pedigree Board of Directors Senior Management Ken Williams | Non-Executive Chair Nicola Frazer | Chief Financial Officer • ~30 years in mining, aviation & financial services • ~25 years in South Australian mining & oil / gas • Former CFO Normandy Mining (New

  6. Slide 6: The Big Picture

    The Big Picture Ambition: Build ~150kozpa independent gold producer Marmota (MEU)  Darwin Rail 286koz Au Staged, open pit growth strategy Central Gawler Mill Marmota (MEU) Peak Iron Peculiar Knob 650ktpa capacity Aurora Tank (Au) Fe 1) Establish bulk open pit baseload 66koz @ 3.9 g/t Au BHP 2) Add

  7. Slide 7: Following the Leader

    Following the Leader Volumetric capital and operating efficiencies are the path to lower costs and higher profits $7.00 1 Aug 2024 ASX:CMM (Mkt Cap ~A$2.25bn) - Karlawinda Project (1,2) 2.25Moz Au (0.7g/t)(4) $6.00 • Bulk open pit and 4.5Mtpa mill → 120koz annual production • One of Australia’s lowe

  8. Slide 8: Tunkillia Scale Platform

    Tunkillia Scale Platform Rapidly expanding ~1.5Moz gold footprint • Gold endowment larger than previously recognised; most historical drilling 1996-2005 (<US$400/oz Au) (1) • 5 new zones + 4 MRE upgrades since Oct 2020; (2) efficient recent growth ~530koz @ A$15/oz all in (3) • Positive initial Scop

  9. Slide 9: Tunkillia Main Deposit

    Tunkillia Main Deposit Attractive characteristics with higher-grade central core and shallow supergene zone ➢ ~80% of MRE tonnes & ounces within 200m of surface (1) ➢ ~300m long higher-grade core = ideal ‘starter pit’ (1) ➢ ~277koz Au in shallow (~35m deep) supergene blanket (1) (1) N 400m Oblique V

  10. Slide 10: Tunkillia Initial Scoping Study

    Tunkillia Initial Scoping Study Validates scale strategy and highlights optimisation targets Key outcomes: (1) 5 Mtpa 6.4 years 130kozpa 311kozpa A$1,917 throughput mining payable Au payable Ag AISC / oz Au A$1.3 bn A$512m 40% IRR 1.9 years A$1,626 LoM EBITDA NPV7.5% (unlevered) payback cash / oz Au

  11. Slide 11: Tunkillia Staged Mine Design

    Tunkillia Staged Mine Design LoM extension opportunities, with high-value ‘Starter’ pit LoM design includes: (1) (1) Source • 2 pits executed in 4 stages • ~66% Indicated and ~34% Inferred Resources High-value ‘Starter Pit’: (1) • First 18 months de-risks development plan • 180koz @ A$1,235/oz = A$4

  12. Slide 12: Tunkillia Key Opportunities

    Tunkillia Key Opportunities Process efficiencies a key focus for capex, opex & mine optimisation Maintenance andLaboratory Administration Primary Crushing Water and Air Conservative assumptions offer multiple areas for Services… Workshop 4.1% 1.0% 2.9% 4.0% Reagents potential optimisation of Tunkill

  13. Slide 13: Tunkillia District Scale Potential

    Tunkillia District Scale Potential 20km+ of untested strike on a major shear system Mulgathing District scale geology Complex • Major geological ‘triple point’ (1) Archaean Greenstone • Kms-wide Kalgoorlie style shear zone (2) • Potential for significant fluid flows EL6639 Area 191 Early days: major

  14. Slide 14: Tarcoola High-Grade History feed

    Tarcoola High-Grade History feed Potential high-grade ‘Stage 1’ and future ‘Stage 2’ blend ML6455: the home of SA gold  Darwin Rail N • 1893 gold rush (~1893 – 1950) produced ~77koz Au @ 37.5 g/t Au (1) • Produced open pit ore @ ~3.8 g/t Au EL7022 → Central Gawler Mill during 2018 (1) EL6860 Persev

  15. Slide 15: Tarcoola Perseverance Mine Extensions

    Tarcoola Perseverance Mine Extensions = high-value ounces for existing fully permitted mill Fully permitted mine (1) • Native Title approval and permits in place • Operated 2017-2018 High-value ounces (1) • Pit floor: ~20koz Au • Stockpile: ~10koz Au Extension potential (1) • Grey areas modelled but

  16. Slide 16: Tarcoola Emerging Platform

    Tarcoola Emerging Platform New 3D architectural model for high-grade historical goldfield Structures mapped under ~15km historical high-grade gold field (1) First time since 1893 that gold occurrences can be put into a consistent structural framework Significant opportunity: • Previously unknown str

  17. Slide 17: Coming Up

    Coming Up Consistent progress = pathway to S1 operations and staged growth Stage 2│Optimise Tunkillia CY 2023 CY 2024 CY 2025 Resource growth drilling Optimised Scoping Study Regional exploration Stage 1│Crystallise feed options Evaluate near-mill feed sources Tarcoola high-grade drilling Regional e

  18. Slide 18: Summary Platform & performance → Value

    Summary Platform & performance → Value Strategic platform with valuable existing infrastructure provides optionality and clear development pathways Advancing consistently with long-term ‘Stage 2’ platform demonstrated, focus shifting to near-term ‘Stage 1’ options Well capitalized with fully aligned

  19. Slide 19: Contact

    Contact Barton Gold Level 4, 12 Gilles Street Adelaide SA 5000 contact@bartongold.com.au www.bartongold.com.au Alexander Scanlon Managing Director & CEO a.scanlon@bartongold.com.au +61 425 226 649 Shannon Coates Company Secretary cosec@bartongold.com.au +61 8 9322 1587 19

  20. Slide 20: JORC (2012) Mineral Resources

    JORC (2012) Mineral Resources (1) * Table shows complete JORC Mineral Resources Estimate (MRE) for each Project on a 100% basis. Figures are subject to rounding, tonnages are dry-metric tonnes, and all Mineral Resources classified as ‘Inferred’ are approximate. Cut-off grades applied are: • 0.4 g/t

  21. Slide 21: Competent Persons Statements

    Competent Persons Statements The information relating to Exploration Results and Mineral Resources in this presentation is extracted from the Company’s Prospectus dated 14 May 2021 (Prospectus) and Barton ASX announcements as cross-referenced in the body of this presentation. A copy of the Prospectu

Barton Gold Holdings — Zurich Precious Metals Summit 2024 on 6ix