Barton Gold Holdings Limited · ASX:BGD
Barton Gold — Australian Gold Conference 2026
20 slides from Barton Gold's conference presentation, Oct 15, 2026
Slide 1: South Australia's 2.25 Moz Gold Developer
rsonal use only ASX:BGD FRA:BGD3 OTC:BGDFF South Australia’s 2.25 Moz Gold Developer 15 October 2026 | Australian Gold Conference Perseverance Mine, Tarcoola Project
Slide 2: Important Notices
Important Notices Please refer to appendices for details of all references contained throughout this presentation. rsonal use only Disclaimer This document has been approved by the Board of Barton Gold Holdings Limited (ACN 633 442 618) (together with its affiliates, “Barton” or the “Company”) and h
Slide 3: SA's Leading Developer
SA’s Leading Developer Australian gold and silver – the right metals, the right place, the right time Leading the re-emergence of central South Australian gold rsonal use only • Jurisdiction matters: Tier 1 geology, infrastructure, labour and rule of law • Strategy to consolidate region and develop
Slide 4: Capital Structure
Capital Structure Strong funding position with register consolidating around aligned management and reliable progress ($AUD) Share Distribution (6) Shares on issue (1) 271 million Board & Management rsonal use only Market Cap ($0.89 / share) (2) $241 million 24% 19% Insitutional & Corporate Debt Nil
Slide 5: Experienced Leadership
Experienced Leadership Strong SA and gold pedigree Board of Directors Senior Management rsonal use only Ken Williams | Non-Executive Chair Alexander Scanlon | Managing Director & CEO • ~30 years in mining, aviation & financial services • ~20 years in principal investments & resources • Former CFO No
Slide 6: Emerging district-scale player: hub-and-spoke model
Emerging district-scale player: hub-and-spoke model District Leader for long-term gold leadership in central Gawler Craton Darwin Rail Challenger & CGM Peak Iron | Peculiar Knob 313koz Au BHP | Prominent Hill Hub 1: Restart CGM operations 1 Cu-Au-Ag rsonal use only Peak Iron | Buzzard • Existing f
Slide 7: CGM 'Hub 1'
CGM ‘Hub 1’ Building blocks in place for lower-risk operations restart; Resource upgrades & DFS underway to evaluate pathways Established infrastructure (1) rsonal use only • Fully permitted mill and Mining Leases • 600ktpa design throughput (fresh ore) • Strong historical gold recoveries of ~94.5%
Slide 8: Tunkillia 'Hub 2'
Tunkillia ‘Hub 2’ Platform PFS underway to confirm excellent project metrics & optimise returns May 2025 Optimised Scoping Study (OSS) outcomes: (1) rsonal use only Based upon A$5,000/oz Au and A$50/oz Ag revenue assumptions ~5 Mtpa 121kozpa 259kozpa A$2,222 A$2,829 x 8 years payable Au payable Ag A
Slide 9: Tunkillia MRE Geometry
Tunkillia MRE Geometry Attractive characteristics with shallow, higher-grade central ‘Starter Pit’ zone ➢ ~80% of MRE tonnes & gold ounces within 200m of surface (1) rsonal use only ➢ ~300m long higher-grade core = valuable initial ‘Starter Pit’ (1) ➢ +200koz Au in shallow (~35m deep) oxide / transi
Slide 10: Tunkillia Rapid Payback
Tunkillia Rapid Payback High value ‘Starter Pits’ drive early return of capital, underwrite financing profile High value ‘Starter Pits’ (1) Assuming A$5,000/oz Au and A$50/oz Ag for revenue: (1) rsonal use only • ‘S1+S2’ → 365koz Au, 923koz Ag and A$1.3bn cash, paying back capex ~3x in ~27 months •
Slide 11: Wudinna Regional Leverage
Wudinna Regional Leverage Multiple enhancement options for BGD’s regional platforms Advanced platform, growth potential rsonal use only • JORC 279koz Au (5.81Mt @ 1.5 g/t Au) (1) • Deposits open to depth / strike extensions Pt Augusta Wudinna • Multiple untested exploration targets 279koz Au Investi
Slide 12: Tarcoola Emerging Platform
Tarcoola Emerging Platform Hunting high-grade blending feed for CGM & Tunkillia Mill Historical high-grade goldfield Darwin Rail rsonal use only • 1893 gold rush (~1893 – 1950) with over 600 historical workings across ML (1) • Perseverance open pit mine (20koz Au) sent ore → CGM during 2017 / 2018
Slide 13: Tolmer Silver Discovery
rsonal use only Tolmer Silver Discovery ‘Western silver’ and ‘eastern gold’ zones now cover ~1.5km footprint *Source: 1 13
Slide 14: Tolmer W. 'Silver Zone'
Tolmer W. ‘Silver Zone’ Dual shallow Ag / Ag-Au horizons with Ag-Au veining in underlying fresh rock (1) rsonal use only 14
Slide 15: Key Targets
Perseverance Mine, Tarcoola Project Key Targets Fully funded to deliver key value- add milestones and value catalysts Hub 1│Central Gawler Mill CY 2026 CY 2027 rsonal use only Resource upgrade / Reserves drilling Mineral Resources update Definitive Feasibility Study (DFS) Final Investment Decision (
Slide 16: Summary
Summary Platform + performance = Value Strategic platform including fully-permitted infrastructure rsonal use only Advancing consistently with clear pathway to operations Well capitalised with fully aligned, experienced leadership Multiple catalysts and frequent news Accessible in AUD, USD and EUR o
Slide 17: Contact
Contact Barton Gold Level 4, 12 Gilles Street rsonal use only Adelaide SA 5000 contact@bartongold.com.au www.bartongold.com.au Alexander Scanlon Managing Director & CEO a.scanlon@bartongold.com.au +61 425 226 649 Jade Cook Company Secretary cosec@bartongold.com.au +61 8 9322 1587 17
Slide 18: JORC (2012) Mineral Resources
JORC (2012) Mineral Resources (1) (1)Tables show the complete JORC MRE for each Project. Figures are subject to rounding, tonnages are dry-metric tonnes, and all Mineral Resources classified as ‘Inferred’ are approximate. Gold cut-off grades applied are: rsonal use only Tunkillia • 0.3 g/t Au (Area
Slide 19: Competent Persons Statements
Competent Persons Statements The information relating to Exploration Results and Mineral Resources in this presentation is extracted from the Company’s Prospectus dated 14 May 2021 (Prospectus) and Barton ASX announcements as cross-referenced in the body of this presentation. A copy of the Prospectu
Slide 20: References
References Slide 4 (Capital Structure) 2 Refer to ASX announcement dated 5 May 2025 and spot gold and silver prices of AUD $6,140/oz and AUD $93/oz (respectively) 1 Refer to ASX announcement dated 2 October 2026 3 Refer to ASX announcements dated 2 / 16 December 2025, and 21 January, 16 March, 27 2
Barton Gold Holdings — Australian Gold Conference 2026 on 6ix