Vinci SA · EURONEXT:DG

Vinci SA — 9M 2024 Earnings Presentation

100 slides from Vinci SA's earnings presentation, October 2024

  1. Slide 1: Closing of the acquisition

    Slide 1: Closing of the acquisition

    Closing of the acquisition VINCI acquired of Fernao, a controlling stake inleading company Edinburgh airport,inScotland cybersecurity in Germany (14.4 mpax andfreehold in 2023, Switzerland asset)

  2. Slide 2: Forward-looking statements

    Slide 2: Forward-looking statements

    This presentation may contain forward-looking objectives and statements about VINCI’s financial situation, operating results, business activities and expansion strategy. These objectives and statements are based on assumptions that are dependent upon significant risk and uncertainty factors that may

  3. Slide 3: 9M 2024 highlights

    Slide 3: 9M 2024 highlights

    9M 2024 highlights

  4. Slide 4: Activity levels still buoyant in concessions and energy

    Slide 4: Activity levels still buoyant in concessions and energy

    Activity levels still buoyant in concessions (+7%) and energy (+5%) VINCI Autoroutes: traffic stable in Q3 – revenue increase VINCI Airports: strong summer demand – remarkable performance of recently-acquired airports VINCI Highways: integration of Denver Northwest Parkway since mid-April 2024 VINCI

  5. Slide 5: Q3 2024 total revenue

    Slide 5: Q3 2024 total revenue

    Δ 2024/2023 in € million Concessions* 3,562 3,297 +8.1% +5.4% VINCI Autoroutes 1,950 1,884 +3.5% +3.5% VINCI Airports 1,446 1,243 +16.3% +9.9% VINCI Highways 111 100 +11.4% +5.0% Other concessions** 54 *** 69 -21.7% -22.3% VINCI Energies 4,979 4,765 +4.5% +3.3% Cobra IS 1,594 1,627 -2.0% -2.9% VINCI

  6. Slide 6: 9M 2024 total revenue

    Slide 6: 9M 2024 total revenue

    Δ 2024/2023 in € million Concessions* 8,900 8,295 +7.3% +5.6% VINCI Autoroutes 5,029 4,855 +3.6% +3.6% VINCI Airports 3,479 3,024 +15.0% +11.0% VINCI Highways 295 261 +12.8% +6.3% Other concessions** 97 *** 154 -37.2% -37.5% VINCI Energies 14,530 13,887 +4.6% +3.5% Cobra IS 4,900 4,688 +4.5% +3.9% V

  7. Slide 7: Total 9M 2024 VINCI Group revenue

    Slide 7: Total 9M 2024 VINCI Group revenue

    * 9M 2024 €5,029 m €3,871 m €14,530 m €4,900 m €23,545 m €741 m revenue vs 9M 2023 +€174 m +€431 m +12.5% +€643 m +4.6% +€212 m, +4.5% +€191 m +0.8% €(95) m o/w VINCI Airports: +€455 m, +15.0% Organic Scope FX Organic Scope FX Organic Scope FX €52,305 m Organic Scope FX €50,637 m +0.8% (0.2)% +0.6%

  8. Slide 8: Total 9M 2024 VINCI Group revenue by geography

    Slide 8: Total 9M 2024 VINCI Group revenue by geography

    9M 2024 revenue / €22,537 m / 43% €29,768 m / 57% Group contribution vs 9M 2023 +€579 m +2.6% +€1,088 m +3.8% Organic Scope Organic Scope FX €52,305 m €50,637 m +1.3% (0.2)% +0.3% +2.7% +2.4% Total 9M 2024 VINCI Group revenue €52,305 m +€1,667 m vs 9M 2023 +3.3% +2.5% +0.9% (0.1)% Organic Scope FX 8

  9. Slide 9: VINCI Autoroutes 9M 2024 key takeaways

    Slide 9: VINCI Autoroutes 9M 2024 key takeaways

    Completion of the upgrade works of the Mougins interchange on the A8 motorway near Cannes 9M 2024 Key takeaways ◼ Revenue: €5,029 m (+3.6% vs 9M 23) ◼ Traffic levels stable in Q3 24 (-0.1% vs Q3 23): – LV -0.2%: after a good print in August, traffic adversely affected by bad weather conditions in Se

  10. Slide 10: VINCI Autoroutes traffic

    Slide 10: VINCI Autoroutes traffic

    VINCI Autoroutes - Rolling twelve-month traffic over 10 years 9M 2024 VINCI Autoroutes traffic CAGR Q3 2024/ 130 Q3 2014 Total 125 HV +2.0% Δ 9M 2024/9M 2023 -0.6% -0.5% -1.4% 120 115 Total +1.3% LV +1.2% Of which: 110 French GDP * +1.1% 105 100 ASF -0.8% -0.6% -1.8% 95 90 Escota +1.1% +1.0% +1.8% 8

  11. Slide 11: VINCI Airports 9M 2024 key takeaways

    Slide 11: VINCI Airports 9M 2024 key takeaways

    Acquisition of a controlling stake in Edinburgh airport, Scotland (14.4 mpax in 2023, freehold asset) 9M 2024 Key takeaways ◼ Revenue: €3,479 m (+15% vs 9M 23, +11% lfl) ◼ Q3 traffic: +6% vs Q3 23, +4% vs Q3 19, above pre-covid levels for the fourth consecutive quarter ◼ New record high passenger nu

  12. Slide 12: VINCI Airports monthly passenger numbers vs 2019

    Slide 12: VINCI Airports monthly passenger numbers vs 2019

    Change in VINCI Airports monthly passenger numbers (vs. 2019) 40% 20% VINCI Airports +2.4% Dominican 0% Republic +25% -20% Portugal +16% -40% Mexico +13% -60% UK -4% -80% Japan -8% -100% France -13% 2020 2021 2022 2023 2024 VINCI Airports Aerodom (Dom. Rep.) OMA (Mexico) ANA (Portugal) UK Japan Fran

  13. Slide 13: VINCI Highways 9M 2024 key takeaways

    Slide 13: VINCI Highways 9M 2024 key takeaways

    Winning of a 30-year concession for the BR-040 highway, nearly 600-km long (Brazil) 9M 2024 Key takeaways ◼ VINCI Highways revenue: €295 m (+12.8% vs 9M 23, +6.3% lfl) – Integration of Denver Northwest Parkway since mid-April 2024 ◼ VINCI Stadium revenue: €49 m (-57% vs 9M 23) – Limited activity unt

  14. Slide 14: VINCI Energies 9M 2024 key takeaways

    Slide 14: VINCI Energies 9M 2024 key takeaways

    Acquisition of RH Marine and Bakker Sliedrecht, two Dutch electrotechnical integrators in the maritime sector 9M 2024 Key takeaways ◼ 9M 24 revenue: €14,530 m (+4.6% actual, +3.5% lfl) – France revenue up 2.8% (+2.2% lfl), despite high base for comparison (strong 9M 23 notably against the backdrop o

  15. Slide 15: Cobra IS 9M 2024 key takeaways

    Slide 15: Cobra IS 9M 2024 key takeaways

    Construction of the 299 MW Poolbeg open cycle power plant close to the seaport of Dublin (Ireland) 9M 2024 Key takeaways ◼ 9M 24 revenue: €4,900 m (+4.5% actual, +3.9% lfl), out of which a slight drop in Q3 (-2%) ◼ Varying trends by geographies in 9M 2024: – Spain revenue up 12% actual (+10% lfl), r

  16. Slide 16: VINCI Construction 9M 2024 key takeaways

    Slide 16: VINCI Construction 9M 2024 key takeaways

    Two contracts worth ~€200 m to upgrade two strategic road link infrastructure in Sydney and Melbourne (Australia) 9M 2024 Key takeaways ◼ 9M 24 revenue: €23,545 m (+0.8% actual, +0.6% lfl) – France: revenue up 2.5%, driven by firm trend in roadworks and networks (hydraulic and railway works), offset

  17. Slide 17: VINCI order intake at €48.4 bn

    Slide 17: VINCI order intake at €48.4 bn

    VINCI order intake at €48.4 bn, +1% yoy despite high comps at Cobra IS level By business line (in € billion) By geographical area (in € billion) 47.8 48.4 47.8 48.4 41.1 8.5 * 7.0 41.1 6.5 18.7 18.1 15.9 16.9 16.3 13.3 19.9 20.5 15.1 21.3 23.4 24.4 9.7 9.2 9.8 9M 22 9M 23 9M 24 9M 22 9M 23 9M 24 VIN

  18. Slide 18: Order book by business line and geography

    Slide 18: Order book by business line and geography

    International accounts for 68% of the order book, of which: • Europe excl. France: 45% • Rest of world: 24% By business line (in € billion) By geographical area (in € billion) 66.8 13.7 66.8 63.3 61.4 63.3 61.4 16.4 29.3 14.9 14.4 21.2 20.1 20.0 16.7 10.1 14.7 14.3 26.1 25.6 29.7 33.6 32.7 33.7 12.8

  19. Slide 19: VINCI Immobilier 9M 2024 key takeaways

    Slide 19: VINCI Immobilier 9M 2024 key takeaways

    Inauguration of a Student Factory residence (130 units) following an urban recycling operation in Nancy's historic downtown district 9M 2024 Key takeaways ◼ 9M 24 consolidated revenue: €741 m (-11% vs 9M 23) – Difficulties remain in the real estate sector in France, in both residential and non-resid

  20. Slide 20: Substantial liquidity and solid credit rating

    Slide 20: Substantial liquidity and solid credit rating

    Solid credit rating Substantial liquidity and solid credit rating A- Outlook stable Confirmed for VINCI in July 2024 High level of liquidity 18.6 1… A3 Outlook stable Confirmed for VINCI in June 2024 -1.5 8.0 6.5 * Financial operations in good conditions Data in € billion In H1 2024, VINCI SA has is

  21. Slide 21: 2024 guidance

    Slide 21: 2024 guidance

    VINCI Autoroutes: traffic levels close to VINCI Energies: VINCI Construction: those of 2023 ▪ Further organic revenue growth but lower than in 2023 ▪ Business levels at least equal to those ▪ Operating margin slightly higher than in 2023 (7.0%) of 2023 VINCI Airports: ▪ Further improvement in the op

  22. Slide 22: Concessions acquisitions in 2024

    Slide 22: Concessions acquisitions in 2024

    June 2024: closing of the acquisition of a 50.01% stake in Edinburgh airport (14.4 mpax in 2023, October 2024: acquisition by VINCI Concessions of a freehold asset) in Scotland for £1.3 bn* further 8.6% stake in LISEA (concessionaire of the high-speed railway link between Tours and Bordeaux June 202

  23. Slide 23: Energy and Construction bolt-on acquisitions

    Slide 23: Energy and Construction bolt-on acquisitions

    June 2024: acquisition of two roadworks and materials 9M 2024: 20 bolt-on acquisitions completed production companies in North America (~€150 m of full-year ( ~ €220 m of full-year revenue) revenue): September 2024: Closing of the acquisition of Fernao, • Newport Construction in New Hampshire and le

  24. Slide 24: 24

    Slide 24: 24

    24

  25. Slide 25: Appendices

    Slide 25: Appendices

    Appendices FIRST NINE MONTHS 2024 HIGHLIGHTS VINE!

  26. Slide 26: H1 2024 financial data

    Slide 26: H1 2024 financial data

    H1 2024 financial data FIRST NINE MONTHS 2024 HIGHLIGHTS VINE!

  27. Slide 27: H1 2024 total revenue

    Slide 27: H1 2024 total revenue

    Δ 2024/2023 in € million Concessions* 5,337 4,998 +6.8% +5.8% VINCI Autoroutes 3,079 2,971 +3.6% +3.6% VINCI Airports 2,033 1,781 +14.1% +11.8% VINCI Highways 183 161 +13.7% +7.1% Other concessions** 43 85 -49.8% -49.9% VINCI Energies 9,551 9,122 +4.7% +3.6% Cobra IS 3,306 3,061 +8.0% +7.5% VINCI Co

  28. Slide 28: H1 2024 revenue by division

    Slide 28: H1 2024 revenue by division

    €14.9 bn €10.8 bn +3% +13% €2.3 bn +0.5% €1.3 bn +6% €1.9 bn -6% €1.9 bn -4% €0.6 bn -22% H1 2024/H1 2023 change Contribution to H1 2024 revenue H1 2024/H1 2023 change 28

  29. Slide 29: H1 2024 revenue France

    Slide 29: H1 2024 revenue France

    Δ 2024/2023 in € million Concessions* 3,316 3,238 +2.4% +2.4% VINCI Autoroutes 3,079 2,971 +3.6% +3.6% VINCI Airports 197 183 +8.0% +8.0% Other concessions** 40 84 -51.9% -51.9% VINCI Energies 4,101 3,990 +2.8% +2.3% Cobra IS 24 22 +5.9% +5.9% VINCI Construction 7,090 6,824 +3.9% +3.9% VINCI Immobil

  30. Slide 30: H1 2024 revenue international

    Slide 30: H1 2024 revenue international

    Δ 2024/2023 in € million Concessions* 2,021 1,761 +14.8% +11.8% VINCI Airports 1,835 1,598 +14.8% +12.2% VINCI Highways 183 161 +13.7% +7.1% Other concessions** 2 1 n.s. n.s. VINCI Energies 5,450 5,131 +6.2% +4.6% Cobra IS 3,283 3,039 +8.0% +7.5% VINCI Construction 8,198 8,090 +1.3% +1.1% VINCI Immo

  31. Slide 31: Income statement H1 2024

    Slide 31: Income statement H1 2024

    (in € million) H1 2024 H1 2023 Δ 2024/2023 Δ (€m) Operating income from ordinary activities (Ebit) 3,871 3,549 +9.1% +322 % of revenue 11.5% 11.0% Share-based payment expense (IFRS 2) (314) (260) Profit/loss of equity-accounted cos. & miscellaneous 155 104 Recurring operating income 3,712 3,393 +9.4

  32. Slide 32: Ebitda

    Slide 32: Ebitda

    in € million Concessions 3,586 67.2% 3,472 69.5% +114 1 o/w VINCI Autoroutes 2,228 72.4% 2,280 76.7% -52 o/w VINCI Airports 1,264 62.2% 1,083 60.8% +181 o/w VINCI Highways 92 50.4% 80 49.7% +12 VINCI Energies 795 8.3% 726 8.0% +69 Cobra IS 328 9.9% 297 9.7% +31 VINCI Construction 651 4.3% 602 4.0% +

  33. Slide 33: VINCI Group Ebitda

    Slide 33: VINCI Group Ebitda

    VINCI Group Ebitda: €5,673 million (+364 vs H1 23) Ebitda margin: 16.8% (+40 bp vs H1 23) -52 2,280 2,228 +181 1,264 1,083 +69 +49 795 726 76.7% 72.4% 651 +31 602 62.2% 60.8% 8.3% 297 328 8.0% 4.3% +2 4.0% 9.7% 9.9% (0) 2 (0.1)% 0.3% (Ebitda in € million and Ebitda margin as % of revenue) 33

  34. Slide 34: Ebit

    Slide 34: Ebit

    in € million Concessions 2,575 48.2% 2,447 49.0% +128 VINCI Autoroutes 1,543 1 50.1% 1,640 55.2% -97 VINCI Airports 1,007 49.6% 780 43.8% +227 VINCI Highways 42 23.0% 22 13.6% +20 Other concessions** (17) 5 -22 VINCI Energies 671 7.0% 623 6.8% +48 Cobra IS 257 7.8% 230 7.5% +27 VINCI Construction 32

  35. Slide 35: VINCI Group Ebit

    Slide 35: VINCI Group Ebit

    VINCI Group Ebit: €3,871 million (+322 vs H1 23, ie +9.1%) Ebit margin: 11.5% (+50 bp vs H1 23) -97 +227 1,640 1,543 1,007 +48 780 671 623 +25 55.2% 50.1% 49.6% +27 43.8% 299 324 6.8% 7.0% 230 257 * - * 2.1% 7.5% 7.8% 2.0% (16) (16) (2.8)% (3.2)% 35 (Ebit in € million and Ebit margin as % of revenue

  36. Slide 36: Cash flows and free cash flow

    Slide 36: Cash flows and free cash flow

    in € million Ebitda 5,673 5,309 11,964 Change in WCR* and current provisions (1,314) (1,952) 1,463 Income taxes paid (962) (1,202) (2,288) 1 Net interest paid (593) (313) 1 (802) Dividends received from companies accounted for under the equity method 72 66 110 Cash flows from operating activities (e

  37. Slide 37: Change in net financial debt

    Slide 37: Change in net financial debt

    in € million Free cash flow (after CAPEX) 361 261 6,628 Net financial investments and other cash flows* (5,656) (651) (974) Cash flow before movements in share capital (5,295) (389) 5,655 Share capital increases and other operations 444 573 707 Dividends (incl. to non-controlling interests) (2,259)

  38. Slide 38: Free cash flow mainly generated in H2

    Slide 38: Free cash flow mainly generated in H2

    7,000 6,000 5,000 4,000 in € million 3,000 2,000 1,000 0 -1,000 H1 FY H1 FY H1 FY H1 FY H1 FY H1 FY H1 FY H1 FY H1 FY H1 FY H1 2014 2014 2015 2015 2016 2016 2017 2017 2018 2018 2019 2019 2020 2020 2021 2021 2022 2022 2023 2023 2024 Full-year FCF H1 FCF … but free cash flow is mainly generated in H2

  39. Slide 39: Operating CAPEX

    Slide 39: Operating CAPEX

    in € million Concessions 169 77 +92 229 VINCI Autoroutes 14 11 +3 21 VINCI Airports* 143 62 +82 201 Other concessions** 12 5 +7 7 VINCI Energies 125 131 -5 277 1 Cobra IS 704 126 +578 625 VINCI Construction 451 470 -19 1,010 VINCI Immobilier and holdings 5 10 -6 17 Purchases of tangible and intangib

  40. Slide 40: Net growth CAPEX in concessions and PPPs

    Slide 40: Net growth CAPEX in concessions and PPPs

    in € million Concessions 581 510 +71 1,033 VINCI Autoroutes 336 288 +49 585 Of which: ASF 161 102 +59 209 Escota 107 73 +34 177 Cofiroute 65 107 -43 190 VINCI Airports 273 187 +86 391 Other concessions* (27) 36 -63 57 VINCI Energies (1) (0) -1 (1) Cobra IS 185 75 +110 127 VINCI Construction 9 (2) +1

  41. Slide 41: Capital employed

    Slide 41: Capital employed

    Δ 30 Jun. 24 / 30 Jun. 23 Non-current assets – Concessions 50,292 43,955 44,091 +6,201 Non-current assets – Energy, Construction and misc. 25,032 24,074 23,127 +1,905 WCR, provisions and other current assets & liabilities (13,760) (15,176) (10,952) -2,808 Capital employed 61,565 52,853 56,266 +5,298

  42. Slide 42: Free cash flow and net financial debt

    Slide 42: Free cash flow and net financial debt

    (23.4) Free cash flow: €361 m vs €261 m in H1 2023 Dividends/Share (16.1) buyback & miscellaneous Acquisitions / (1.9) Disposals Capex 1 Interests & taxes (5.7) EBITDA (2.5) Δ Working capital paid 5.7 requirement (1.5) (1.3) Net financial debt Net financial debt at 31 Dec. 2023 Concessions Energy +

  43. Slide 43: Net financial debt

    Slide 43: Net financial debt

    Of which Of which Of which in € million external external external net debt net debt net debt Concessions (31,622) (20,249) (28,734) (18,761) (29,967) (19,436) VINCI Autoroutes (16,102) (11,611) (16,533) (12,323) (16,374) (12,381) VINCI Airports (10,954) (7,538) (8,781) (5,551) (9,434) (6,246) VINCI

  44. Slide 44: Breakdown of debt by currency and cost of debt

    Slide 44: Breakdown of debt by currency and cost of debt

    Optimising the average cost of debt in a challenging environment Breakdown of debt by currency Cost of gross financial debt over the past 5 years (closing rate) 22% Dec23 61% 30 June £ Dec20 Dec21 Dec22 2024 € 7% $ Dec23 3% MXN Dec22 2% PEN Dec20 Dec21 5% other currencies Dec23 Dec22 Dec20 Dec21 Dec

  45. Slide 45: Debt maturity profile

    Slide 45: Debt maturity profile

    5,000 4,500 4,000 3,500 3,000 € million 2,500 2,000 1,500 1,000 500 0 Holdings & misc. Groupe ASF Cofiroute Arcour Arcos VINCI Airports Other concessions * Concessions: 6.8 years - Holdings and other divisions: 4.7 years 45

  46. Slide 46: Bond maturities and average rate

    Slide 46: Bond maturities and average rate

    Nominal amount in € million 704 2,860 4,354 3,120 3,171 2,810 Average rate* 6.81% 3.41% 5.11% 3.82% 4.80% 4.89% * After hedging 46

  47. Slide 47: Gross financial debt fixed and floating rates

    Slide 47: Gross financial debt fixed and floating rates

    Net cash non representative of year-end position due to the FCF seasonality inherent to VINCI’s businesses Gross financial debt breakdown between fixed and floating rates (in € billion) 31.9 28.6 29.3 27.9 27.8 16.2 11.3 14.5 16.2 16.3 51% 41% 50% 12.0 58% 57% * 10.2 12.3 5.9 7.9 16.4 14.8 15.7 11.8

  48. Slide 48: Renewable energy portfolio at end of June 2024

    Slide 48: Renewable energy portfolio at end of June 2024

    At the end of June 2024 Solar PV Brazil Solar PV 100% 95% 100% Spain Brazil 66% 34% Portugal 5% FY 22 FY 23 FY 22 FY 23 H1 24 H2 24+ 48 * Estimated amount

  49. Slide 49: Other information

    Slide 49: Other information

    Other information FIRST NINE MONTHS 2024 HIGHLIGHTS VINE!

  50. Slide 50: Social, workforce-related and environmental commitment

    Slide 50: Social, workforce-related and environmental commitment

    A sustainable economic project is impossible without an ambitious social, workforce-related and environmental commitment. 50

  51. Slide 51: Act for the climate, circular economy, natural environments

    Slide 51: Act for the climate, circular economy, natural environments

    Optimise resources thanks Preserve Act for the climate to circular economy natural environments Scopes 1 & 2 emissions in 2023 of recycled materials Towards (over 56 in total) using zero recycled materials out of VINCI Construction total annual phytosanitary products for GHG emissions production in

  52. Slide 52: CDP ratings and taxonomy alignment

    Slide 52: CDP ratings and taxonomy alignment

    of eligible revenue of aligned revenue 2023 2022 2021 2020 Transparency score: 98% CDP Climate A- A A A- CDP Water Security B B B B CDP Forest C C C C airports achieved Net Zero « Best in class » in 2023 (in heavy construction sector) emissions for Scopes 1 and 2 52

  53. Slide 53: Social indicators

    Slide 53: Social indicators

    More than long-term unemployed female managers in 2023 hours of training provided of all employees can of companies without lost- (vs 18.5% in 2016) subscribe to an employee people supported in 2023 in 2023 time occupational accidents share ownership on integration programmes programme workplace acc

  54. Slide 54: VINCI key figures

    Slide 54: VINCI key figures

    Group revenue countries where Est. number of Est. number of Est. number market cap. at (incl. holdings) VINCI operates business units employees of contracts 31 December 2023 Revenue Est. number of employees VINCI Autoroutes VINCI Concessions* VINCI Energies Cobra IS VINCI Construction VINCI Immobili

  55. Slide 55: Revenue 2013 vs 2023 by geography

    Slide 55: Revenue 2013 vs 2023 by geography

    5% 14% 4% 5% 4% 6% 3% 43% 4% 20% 62% 30% 2013 Revenue CAGR 2013/2023 2023 Revenue €25.1 bn +1.7% €29.6 bn €15.2 bn +9.9% €39.2 bn France Central and Eastern Europe Asia/Middle East/Oceania Western Europe (ex. France) Africa Americas 55

  56. Slide 56: 2023 revenue and Ebitda breakdown

    Slide 56: 2023 revenue and Ebitda breakdown

    1% 2% -1% 14% 5% 16% 6% 46% 9% 15% Revenue 14% Ebitda ROI* 7% €68.8 bn €12.0 bn €8.2 bn 39% 41% 23% 26% 9% 28% VINCI Autoroutes VINCI Concessions VINCI Energies Cobra IS VINCI Construction 1% 6% 1% 4% 17% -1% 18% 8% 9% VINCI Immobilier & holdings 6% 18% Net income Free cash Capital 21% employed €4.7

  57. Slide 57: Ebitda evolution since 2006

    Slide 57: Ebitda evolution since 2006

    €0.3 bn / 2% €1.9 bn / 16% €2.3 bn / 19% +€2.3 bn * +€2.7 bn €4.7 bn / 39% +€2.1 bn €0.2 bn / 6% *** €2.4 bn / 59% €2.8 bn / 23% +€0.8 bn €1.1 bn / 28% €0.2 bn / 6% €0.1 bn / 2% +€0.1 bn 2006 PF - VA 206 PF - Autres 2023 - VA 2023 - Autres VINCI Autoroutes VINCI Airports & other concessions Energy (

  58. Slide 58: Order intake breakdown and noteworthy contracts

    Slide 58: Order intake breakdown and noteworthy contracts

    Order intake breakdown by division and Noteworthy contracts awarded to VINCI granularity in 2023 VINCI Energies FY FY Change -Inelfe: two onshore converter stations for a new electrical interconnection between France and Spain In € billion 2023 2022 23/22 -First section of Line 15 West (France): ele

  59. Slide 59: ROI and ROE definitions

    Slide 59: ROI and ROE definitions

    * is net operating income after tax excluding non-recurring items (NOPAT), divided by the average capital employed between the opening and closing balance sheet positions for the financial year in question is net income for the current period attributable to owners of the parent, divided by equity e

  60. Slide 60: Long cycles and short cycles businesses

    Slide 60: Long cycles and short cycles businesses

    Long cycles/significant equity Short cycles/low equity investments/capital employed intensity investments ⁃Extension of average maturity of the concessions portfolio ⁃Prioritise margin over revenue growth ⁃Strengthening of the Group’s footprint in mobility ⁃Rigorous risk monitoring/Selective approac

  61. Slide 61: Shareholding structure

    Slide 61: Shareholding structure

    Rest of the World Rest of Europe 14.7% Shareholding structure* 4.8% Individual investors 10.7% ▪ More than 1,000 United Kingdom 16.6% institutional investors Institutional Employees ▪ ~166,000 Group employees investors 10.2% 73.2% and former employees are 2.8% Qatar Holding LLC shareholders, includi

  62. Slide 62: 2024 interim dividend per share

    Slide 62: 2024 interim dividend per share

    2024 interim dividend per share 15 October 2024 Ex-date (all-cash) 17 October 2024 Payment date 4.50 4.00 3.05 * 2.90 2.67 Total dividend (–) interim dividend 2.45 2.22 2.10 2.04 2.04 1.84 Interim dividend Special dividend linked to the disposal of VINCI Park 0.79 1.00 1.05 1.05 0.55 0.57 0.63 0.69

  63. Slide 63: Business line profiles

    Slide 63: Business line profiles

    Business line profiles FIRST NINE MONTHS 2024 HIGHLIGHTS VINE!

  64. Slide 64: VINCI Autoroutes revenue and Ebitda margin

    Slide 64: VINCI Autoroutes revenue and Ebitda margin

    Revenue (€bn) Ebitda margin 4% 11% France Portugal 11% €10.9 bn UK 10% 64% Americas RoW 64

  65. Slide 65: Share of division 2023 revenue

    Slide 65: Share of division 2023 revenue

    6% 65 = % of the division’s 2023 revenue

  66. Slide 66: Capex forecast

    Slide 66: Capex forecast

    1,800 1,600 1,400 1,200 VINCI Airports 1,000 (incl. London Gatwick) 800 600 VINCI Autoroutes 400 200 0 * Forecast as of 30 June 2024 and including fully consolidated assets only. Capex related to Edinburgh airport (whose acquisition has been closed on 25 June 2024) not included. 66

  67. Slide 67: VINCI Airports traffic by country

    Slide 67: VINCI Airports traffic by country

    Portugal (ANA) 32,365 +5.2% +17.9% o/w Lisbon 16,718 +5.3% +14.4% United Kingdom 30,378 +9.4% (6.1)% o/w London Gatwick 19,917 +7.7% (10.4)% Mexico 12,368 (1.8)% +11.6% o/w Monterrey 6,090 (0.2)% +15.2% France 8,939 +7.8% (10.5)% o/w ADL (Lyon) 5,051 +5.9% (11.3)% Cambodia 2,317 +18.1% (38.7)% USA*

  68. Slide 68: VINCI Autoroutes

    Slide 68: VINCI Autoroutes

    VINCI Autoroutes FIRST NINE MONTHS 2024 HIGHLIGHTS VINCI

  69. Slide 69: VINCI Autoroutes network and concessions

    Slide 69: VINCI Autoroutes network and concessions

    4,443 km approx. 50% >35% under concession of conceded French of total motorway toll roads network in France (1) ASF Cofiroute End of concession Apr. 2036 Feb. 2032 Jun. 2034 Dec. 2086 Dec. 2070 Jan. 2070 ESCOTA A19-Arcour A355: Arcos: Western Network size 2,737 km 471 km 1,100 km 11 km 101 km 24 km

  70. Slide 70: Contractual framework of toll increases

    Slide 70: Contractual framework of toll increases

    Contractual framework of toll increases (LVs) Cofiroute ASF Escota Intercity Network 2024* 2.71% 2.71% 2.71% After 2024 70% x i 70% x i 70% x i i = Consumer price index excl. tobacco products at end October Y-1 * Applied on 1 February 2024 The amendment to the ASF concession contract, regarding the

  71. Slide 71: VINCI Airports

    Slide 71: VINCI Airports

    VINCI Airports FIRST NINE MONTHS 2024 HIGHLIGHTS VINE! “”

  72. Slide 72: VINCI Airports platforms in countries

    Slide 72: VINCI Airports platforms in countries

    platforms in countries (*) As of 30 June 2024 72

  73. Slide 73: Airport passenger numbers 2014-2023

    Slide 73: Airport passenger numbers 2014-2023

    267 255 210 195 157 132 77 86 69 47 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 1 Data at 100% irrespective of percentage held Data include airport passenger numbers on a full-year basis 73

  74. Slide 74: VINCI Airports revenue and Ebitda

    Slide 74: VINCI Airports revenue and Ebitda

    3.9 2.6 2.7 1.0 1.2 55.7% 59.0% 63.2% 32.4% 14.7% Revenue (€bn) Ebitda margin UK (100% Gatwick + Belfast) 3% 8% 2% 7% 5% 7% Portugal (ANA) 31% 29% 9% Revenue 6% * Mexico (OMA) Ebitda €3,947 m €2,495 m France 16% 19% Dom. Rep. (Aerodom) 29% Brazil 28% Rest of world & misc. 74

  75. Slide 75: Passenger breakdown

    Slide 75: Passenger breakdown

    1% Tourism/Leisure 56% VFR (Visiting Friends & Relatives) 21% Business Other 22% 9% Domestic 39% Intra EU 37% International Short & Mid haul (excl. Intra EU) International Long haul (>4,000 km) 16% * Estimates based on internal surveys realised in the airports 75

  76. Slide 76: VINCI Airports portfolio: UK, Portugal, Japan, Chile, Mexico

    Slide 76: VINCI Airports portfolio: UK, Portugal, Japan, Chile, Mexico

    London Gatwick Freehold 46.6 40.9 - 50% Yes Full consolidation UK Edinburgh Airport Freehold 14.7 14.4 - 50% Yes Full consolidation Belfast International Freehold 6.3 6.0 2993 100% Yes Full consolidation ANA Portugal 59.1 66.3 (10 airports in Lisbon, Porto, Faro, Madeira, Azores islands) Concession

  77. Slide 77: VINCI Airports portfolio: other airports

    Slide 77: VINCI Airports portfolio: other airports

    4 airports: Hollywood Burbank Airport in California, Management USA Atlantic City in New Jersey, Macon Downtown Airport and 7.1 7.0 n.a 100% No Full consolidation Contracts Middle Georgia Airport in Georgia Salvador Concession 7.7 7.3 2047 100% Yes Full consolidation Brazil 7 airports in the North R

  78. Slide 78: VINCI Highways

    Slide 78: VINCI Highways

    VINCI Highways VINCI Railways VINCI Stadium FIRST NINE MONTHS 2024 HIGHLIGHTS VINCI “”

  79. Slide 79: VINCI Highways equity invested and net debt

    Slide 79: VINCI Highways equity invested and net debt

    661 479 319 309 235 Equity invested Net financial debt 47.8% 48.5% 56.7% 41.8% 42.9% €4.1 bn € 4.6 bn At 30 Jun. 2024 At 30 Jun. 2024 VINCI Highways 2023 revenue and Ebitda breakdowns 19% 16% Lima Expresa (Peru) 37% Revenue 12% Ebitda 48% Rion-Antirion bridge (Greece) €352 m €172 m ETC Service provi

  80. Slide 80: VINCI Highways motorway concessions

    Slide 80: VINCI Highways motorway concessions

    Motorway A7 Bockenem-Göttingen 60 km 2047 50% no Equity method Motorway A4 Horselberg 45 km 2037 50% yes Equity method Germany Motorway A9 Thuringia/Bavarian border 47 km 2031 50% no Equity method Motorway A5 Malsch–Offenburg 60 km 2039 54% yes Equity method Motorway B247 Mühlhausen-Bad Langensalza

  81. Slide 81: Tunnels, bridges and ETC concessions

    Slide 81: Tunnels, bridges and ETC concessions

    Tunnel Prado Carénage 2.5 km road tunnel, Marseille 2033 34.2% yes Equity method France Tunnel Prado Sud 1.5 km road tunnel, Marseille 2055 58.5% yes Equity method Prince Edward Island - Canada Bridge Confederation bridge 2032 85% yes Full consolidation mainland 2.9 km mainland–Peloponnese Greece Br

  82. Slide 82: VINCI Stadium concessions

    Slide 82: VINCI Stadium concessions

    Stadium Stade de France 80,000 seats, Saint-Denis 2025 67% yes Full consolidation Stadium Marie-Marvingt 25,000 seats, Le Mans 2044 100% yes Full consolidation France Stadium Allianz Riviera 36,000 seats, Nice 2041 50% yes Equity method Stadium Matmut Atlantique 42,000 seats, Bordeaux 2045 50% yes E

  83. Slide 83: VINCI Railways and other concessions

    Slide 83: VINCI Railways and other concessions

    Rail GSM-Rail Ground-train communication system on 16,000 km of track 2025 70% no Equity method France Rail SEA High-Speed-Rail 302 km of high-speed rail line between Tours and Bordeaux 2061 33.4% yes Equity method Building Park Azur Car rental centre, Nice Airport 2040 100% no Full consolidation En

  84. Slide 84: VINCI Energies

    Slide 84: VINCI Energies

    VINCI Energies FIRST NINE MONTHS 2024 HIGHLIGHTS VINCI “”

  85. Slide 85: VINCI Energies: energy transition and digital transformation

    Slide 85: VINCI Energies: energy transition and digital transformation

    Making energy transition and digital transformation a reality 2023 revenue by geographical area Revenue and Ebit margin over the past 5 years 3%4% France 19.3 6% 16.7 Germany 15.1 13.7 13.7 Scandinavia 42% 6.8% 7.0% 24% €19.3 bn Rest of Europe 6.5% 6.0% Americas 5.7% Africa 5% RoW 16% France 9% 32%

  86. Slide 86: VINCI Energies businesses

    Slide 86: VINCI Energies businesses

    Making energy transition and digital transformation a reality Transport infrastructure: technical Process control and automation Electrical systems Telecommunication and enterprise networks equipment and management systems Electrical and instrumentation Heating, ventilation, air conditioning Data st

  87. Slide 87: Cobra IS

    Slide 87: Cobra IS

    FIRST NINE MONTHS 2024 HIGHLIGHTS VINE!

  88. Slide 88: Cobra IS: industrial engineering and energy

    Slide 88: Cobra IS: industrial engineering and energy

    A leading company in applied industrial engineering and specialised services and a global player in the energy sector 2023 revenue by geographical area 9% Spain Revenue and Ebit margin Portfolio of renewable energy 2%3% 3% Latin America over the past 2 years assets at the end of 2023 Germany 6% 44%

  89. Slide 89: Cobra IS activities

    Slide 89: Cobra IS activities

    A leading company in applied industrial engineering and specialised services and a global player in the energy sector Design, engineering, supply and construction of Construction, installation and maintenance of high- Integration and supply of traffic control/tunnelling Design, engineering, supply a

  90. Slide 90: Cobra IS projects

    Slide 90: Cobra IS projects

    * ** * Delivered in 2023 ** Contract announced in July 2024, not in order book at the end of June 2024 90

  91. Slide 91: VINCI Construction

    Slide 91: VINCI Construction

    VINCI Construction FIRST NINE MONTHS 2024 HIGHLIGHTS VINCI “”

  92. Slide 92: France's leading construction company

    Slide 92: France's leading construction company

    France’s leading construction company and a major global player 2023 revenue by geographical area Revenue and Ebit margin over the past 5 years 4% 2% France 31.5 7% 29.3 UK 25.1 * 26.3 Central & Eastern 23.1 * 16% Europe 3.8% 4.0% 43% Rest of Europe 3.7% 3.3% €31.5 bn Americas 7% Oceania 2.0% 7% Afr

  93. Slide 93: VINCI Construction businesses

    Slide 93: VINCI Construction businesses

    France’s leading construction company and a major global player Roadworks Non residential / Residential Civil engineering Railworks Maintenance and management of roads and Refurbishment / New build Geotechnical engineering Earthworks motorways Structural engineering Water infrastructure Asphalt indu

  94. Slide 94: Grand Paris Express Line 15 West

    Slide 94: Grand Paris Express Line 15 West

    Line 15 Around design-build of a section of €36 bn Line 15 West (between Pont de Construction budget* Sèvres station and La Défense) 200 km Automatic metro lines 68 New stations Expected completion in 2030 Works by VINCI entities * source: Société du Grand Paris 94

  95. Slide 95: VINCI Immobilier

    Slide 95: VINCI Immobilier

    VINCI Immobilier FIRST NINE MONTHS 2024 HIGHLIGHTS VINCI “”

  96. Slide 96: VINCI Immobilier revenue and reservations

    Slide 96: VINCI Immobilier revenue and reservations

    Revenue over the past 5 years 1.6 2023 reservations by destination 1.5 1.3 1.2 1.2 Buy to let private investors 17% Social, 46% 4,214 Institutional Private 22% owners Revenue – non residential (€bn) 15% Revenue – residential (€bn) Managed residences * Including VINCI Immobilier’s share in joint deve

  97. Slide 97: Share of division 2023 revenue

    Slide 97: Share of division 2023 revenue

    XX % = % of the division’s 2023 revenue 97

  98. Slide 98: Notes

    Slide 98: Notes

    Notes FIRST NINE MONTHS 2024 HIGHLIGHTS VINE! “”

  99. Slide 99: Notes

    Slide 99: Notes

    Notes FIRST NINE MONTHS 2024 HIGHLIGHTS VINE! “”

  100. Slide 100: Agenda and investor contacts

    Slide 100: Agenda and investor contacts

    Agenda 19 VINCI Autoroutes and VINCI gregoire.thibault@vinci.com boris.valet@vinci.com Airports traffic in October 2024 +33 1 57 98 63 84 +33 1 57 98 62 84 22 VINCI Energies Capital Markets Day in Nanterre, France celine.louvet@vinci.com marie.richard@vinci.com 17 VINCI Autoroutes and VINCI +33 1 57

Source: Internet Archive copy of vinci.com