Slide 1: A low risk, high quality investment supported by a sound strategy
A low risk, high quality investment supported by a sound strategy Bank of America Merril Lynch Global Metals, Mining and Steel Conference 9 – 12 May 2016

Slide 2: Disclaimer
Disclaimer The information presented in this presentation is of a general nature and the forward-looking information, opinions and beliefs of the Company and its affiliates are based on various market related assumptions. Changes in market circumstances after the production of the information may im

Slide 3: BRPM JV location relative to neighbouring mines
BRPM JV location relative to neighbouring mines ROYAL BAFOKENG PLATINUM - BofAML 2016 Global Metals, Mining & Steel Conference 3

Slide 4: RBPlat Group structure
RBPlat Group structure Rustenburg Platinum Mines Ltd Royal Bafokeng Holdings (Pty) Ltd Free Float (RPM) (RBH) 11.7% 52.8% 35.5% Royal Bafokeng Platinum Ltd (RBPlat) 100% 100% Royal Bafokeng Resources (Pty) Ltd Royal Bafokeng Platinum Management Services (Pty) Ltd (RBR) (RBPlatMS) 100% 100% Bafokeng

Slide 5: Sound business strategy delivering consistency in a challenging environment
Sound business strategy delivering consistency in a challenging environment SIFR: Our journey to zero harm Royalty income PGM operating environment 0.60 80 0.50 > Depressed commodity market 70 60 /200,000 hrs 0.40 > Labour and community unrest 50 R’million 0.30 40 0.53 75 0.47 > High industry inflat

Slide 6: The RBPlat safety strategy − zero harm through resilience
The RBPlat safety strategy − zero harm through resilience Safety remains our key challenge • Five fatalities in 2015 • 23% improvement in LTIFR year-on-year • 54% improvement in SIFR year-on-year Health and environment • 50% decrease in NIHL cases exceeding 10% • Zero TB deaths for persons on the RB

Slide 7: Q1 2016 Operating results overview
Q1 2016 Operating results overview Injury frequency rates Description Unit Q1 2016 Q1 2015 Var 1.50 / 200,000 hrs Safety 1.00 SIFR (/200,000 hrs) rate 0.05 0.12 58% LTIFR (/200,000 hrs) rate 0.25 0.48 48% 0.50 Production 0.00 Q1 2010 Q1 2011 Q1 2012 Q1 2013 Q1 2014 Q1 2015 Q1 2016 Total tonnes mille

Slide 8: 1st Quartile producer – BRPM lowest cost underground platinum mine
1st Quartile producer – BRPM lowest cost underground platinum mine 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 2 000 1 800 CY16 Break Even Platinum Price (Cash Cost + Maintenance Capex) 1 600 Trackless operations 1 400 Price ($/oz) 1 200 Platinum Price 1 000 Average Break-Even Price 800 600 400 200

Slide 9: Our response to a challenging PGM pricing environment
Our response to a challenging PGM pricing environment Basket price, 2015 / forecast (R/4E oz, nominal) RBPlat / BRPM JV • $/oz Pt basket price reduced by 30% • Capital deferment from June 2014 to Aug 2015 • Styldrift expenditure “self funding” • R/oz basket price reduced by 18% over • Rescheduling a

Slide 10: Styldrift – timing to maximise the revenue stream
Styldrift – timing to maximise the revenue stream Merensky focus Styldrift I strongly platinum biased Revenue from base metals Revenue from PGMs (4E) • Historically, Merensky reef has commanded a 75% premium over UG2 reef 100% 4% 6% on a revenue per tonne basis 12% 11% 80% • High Pt:Pd ratio of 2.3:

Slide 11: Revised Styldrift construction programme
Revised Styldrift construction programme Strategically aligning construction and production activities to optimise cashflow whilst maintaining the flexibility to ramp up as and when conditions permit • Align construction progress/activities with • Optimise timing of processing requirements with mark

Slide 12: Our flexibility allows us to respond strategically to market conditions
Our flexibility allows us to respond strategically to current market conditions and forecasts Pricing below R17 500 /Pt oz Pricing above R17 500 /Pt oz (2015 real terms) • Main shaft commissioning • 642L Footwall • 642L footwall Project ramp-up preparation for development outside • Completion of Ven

Slide 13: Styldrift I revised construction programme
Styldrift I revised construction programme 2015 Mining and construction - R17 000/Pt oz 2016 Mining and construction – R17 500/Pt oz • Continued to develop underground infrastructure on • 100ktpm module – upfront design work 600L in line with revised strategy • Continue to develop 600L infrastructur

Slide 14: 600 Level development and construction activities
600 Level development and construction activities Two sections LEGEND pre-established West Development focus Current workings – Sept 2015 • Maximise available face length Infrastructure completed end 2016 Services # • Access around shaft infrastructure Deferred infrastructure • Pre-develop footprint

Slide 15: 642 Level mining and construction activities
642 Level mining and construction activities LEGEND Services # Current workings – Sept 2015 Development focus Infrastructure completed 2016 • Ore handling infrastructure Deferred infrastructure • Access/advance decline North and South Top of • North 1 and South 1 ore passes Settlers Main # North 1 O

Slide 16: Level development and construction activities
708 Level development and construction activities LEGEND Current workings – Sept 2015 Development focus Infrastructure completed 2016 • Ore handling infrastructure Deferred infrastructure • Water handling infrastructure • Level hand over Services # Main # Settler 1 Silo 1 Silo 2 Settler 2 Silo 3 Sil

Slide 17: “De-risking” the ramp-up
“De-risking” the ramp-up LEGEND Original Revised Current workings – Sept 2015 Description Ramp-up Ramp-up Original ramp-up footprint Revised ramp-up footprint end 2016 Sections pre-established 2 4 Deferred infrastructure Services # Two sections pre-established Stoping face length 335m 800m West Work

Slide 18: BRPM JV Production profile
BRPM JV Production profile Merensky contribution BRPM JV production plan 4.5 100% 4.0 90% 80% 3.5 70% 3.0 % Contribution 60% 2.5 50% Mt 2.0 40% 1.5 30% 1.0 20% 0.5 10% 0.0 0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2016 2017 2018 2019 2020 2021 2022 2023 2024 Merensky UG2 SD1 Merensky North Sha

Slide 19: Balance sheet remains strong at year-end
Balance sheet remains strong at year-end ˃ Rand basket decreased by 13% mainly due to US$ commodity price weakening ˃ Impairment of non-financial assets of R4.5 billion (net R2.9 billion) due to weak pricing environment ˃ Strong cash and funding position • R917.6 million cash on hand for the Group –

Slide 20: Royal Bafokeng Platinum: an attractive investment proposition
Royal Bafokeng Platinum : an attractive investment proposition Lower political risk Black-owned and controlled - exceeds all statutory BEE requirements Lower labour risk Employees and owners are aligned – long term wage agreements Long-life assets Long-life Merensky producer Excellent growth Low ris
Source: Internet Archive copy of implats.co.za
More decks from Royal Bafokeng Platinum Ltd
Renaissance Capital Metals & Mining Conference 202118 slides · May 2021
H1 2020 Earnings Presentation39 slides · 2020
Merger or Acquisition (October 2019)11 slides · Oct 16, 2019
RBPlat Analyst Roundtable 201910 slides · Aug 6, 2019
Technical Presentation (February 2019)34 slides · Feb 1, 2019
Fact Sheet (2019)11 slides · 2019