Marmota Limited · ASX:MEU

Marmota — Marmota Energy — Investor Presentation (November 2014)

19 slides from Marmota's investor presentation, Nov 17, 2014

  1. Slide 1: Investor Presentation: Focused on the Future

    For personal use only Investor Presentation Focused on the Future November 2014 David Williams – Managing Director

  2. Slide 2: Important Information

    Important Information For personal use only Disclaimer This presentation has been prepared by Marmota Energy Limited (“MEU”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third par

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Marmota Energy (ASX: MEU) is a diversified mineral exploration and development company with key For personal use only projects across the Cu-Ni, Cu-Au, uranium and iron spaces. Capital Structure1 Trading History Shares on Issue 263M 0.025 1,600,000 Options 0.7M 1,400,000 0.020 Mar

  4. Slide 4: Strategic Review

    Strategic Review For personal use only Portfolio Overview  Large portfolio covering 5,886 sq km across 26 tenements with multiplicity of targets but with high associated work commitments  To ensure exploration expenditure is focused on highest priority targets, Marmota has recently conducted a str

  5. Slide 5: Strategic Focus

    Strategic Focus For personal use only Review has resulted in a strategic focus on: 1) Junction Dam Uranium Project 2) Melton Copper Project 3) Aurora Tank Gold Project 4) Durkin Nickel (Pundinya) Project Rationalisation  Market interest (acquisition, farm-in, JV) for non-core projects to be tested

  6. Slide 6: 1) Junction Dam Uranium

    1) Junction Dam Uranium Project For personal use only Commodity: uranium  Uranium prices starting to recover with industry cost curves forecasting commercially sustainable prices in 2-3 years Resource:  Saffron deposit inferred resource of *5.4 million pounds with average grade of 557ppm U3O8 (see

  7. Slide 7: 1) Junction Dam Uranium

    1) Junction Dam Uranium Project For personal use only Commercialisation:  Potential stand alone project  Alternatively, located next door to Honeymoon Mine which could provide a route to market  Can be extracted through in situ recovery which has low front end capex, quick production lead times a

  8. Slide 8: 1) Junction Dam Uranium

    1) Junction Dam Uranium Project For personal use only Immediate forward exploration program next 6 months:  Drill and install water monitoring wells, undertake pump tests to ascertain permeability and analyse water and flow; Example of FLT  Undertake lithological logging and analyse unit extractab

  9. Slide 9: 2) Melton Copper

    2) Melton Copper Project For personal use only Resource:  High grade copper intersections up to 2.92% (see ASX announcement dated 7 May 2014) at Champion prospect with new target area, Melton Central, identified by the subsequent geophysical review Champion Prospect drill holes, with examples of ma

  10. Slide 10: 2) Melton Copper

    2) Melton Copper Project For personal use only Commercialisation:  Located adjacent to the Rex Minerals Hillside Project  Rex Minerals has a mining lease, approvals to mine and now focusing on developing a mine for its shallow copper resource Objective:  Develop exploration targets for the Melton

  11. Slide 11: 2) Melton Copper

    2) Melton Copper Project For personal use only Immediate forward exploration program next 6 months:  Complete ground magnetics over Melton Central  Airborne EM over Champion and Central targets Magnetic image  Targeted drilling on Champion and Central highlighting the geophysical targets anomalie

  12. Slide 12: 3) Aurora Tank Gold

    3) Aurora Tank Gold Project For personal use only Resource:  Apollo Minerals reported initial drilling intersected high grade gold near surface including 5.0 g/t Au over 4 metres (see ASX Release by Apollo Minerals of 21 October 2014) Commercialisation:  Early stage exploration but Marmota is 100%

  13. Slide 13: 3) Aurora Tank Gold

    3) Aurora Tank Gold Project For personal use only Immediate forward exploration program next 6 months:  Forward work program to be driven by Apollo Minerals  Apollo Minerals have indicated that they will review induced polarisation data to help with targeting of follow-up drill holes designed to D

  14. Slide 14: 4) Durkin Nickel (Pundinya)

    4) Durkin Nickel (Pundinya) Project For personal use only Resource:  Initial drilling produced significant grades of up to 1.38% nickel. Location provides potential for a reasonable resource Commercialisation:  No similar mines in region, but with a good size resource can develop as in a good logi

  15. Slide 15: 4) Durkin Nickel (Pundinya)

    4) Durkin Nickel (Pundinya) Project For personal use only Immediate forward exploration program next 6 months:  Geophysics review to take into account the results from drilling Location map of drill holes over magnetic image  Redrill selected holes and conduct downhole completed during Phase 1 at

  16. Slide 16: Investment Proposition

    Investment Proposition Strategy: For personal use only  Reduce focus to 3 core projects with 3 core commodities to ensure maximum value from investment dollar spend Commodities:  Uranium’s star is starting to turn so position key uranium asset to be at the front of the pack for commercialisation 

  17. Slide 17: Equity Raising Summary

    Equity Raising Summary For personal use only  Marmota announced a non renounceable Indicative Timetable1 rights issue capital raising on 7 November Prospectus Lodged with ASIC and ASX 7-Nov-14 2014 to raise up to $659,398 “Ex” Date 11-Nov-14 (approximately) before costs Record Date 13-Nov-14  1 ne

  18. Slide 18: Contacts

    For personal use only Investor Presentation Focused on the Future Contacts November 2014 David Williams – Managing Director Marmota Energy Limited Adelaide Equity Partners David Williams Rohin Muller Managing Director Telephone: (08) 8232 8800 Telephone: (08) 8245 4000 Email: rmuller@adelaideequity.

  19. Slide 19: Appendix – Uranium Market

    Appendix – Uranium Market For personal use only  Spot price is on the rise – US$42/lb for U3O8 on 7 November 2014  Approval given for the restart of first two reactors in Japan at Sendai  “Nuclear supporter Prime Minister Shinzo Abe is eager to return Japan’s idled reactors to service as replacem

Marmota Energy — Investor Presentation (November 2014) on 6ix