Scottie Resources Corp. · TSXV:SCOT

Scottie Resources — Investor Presentation (May 2023)

18 slides from Scottie Resources's investor presentation, May 2023

  1. Slide 1: Corporate Presentation May 2023

    scottie RESOURCES CORP CORPORATE PRESENTATION FRANKFURT: SR8 OTCQB: SCTSF TSXV: SCOT MAY, 2023

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS “oT ed the data disclosed in this p including sampling, analytical, and test data underlying the information dis: scottie = Resources corp OTCQB: SCTSF | TSXV: SCOT | FRANKFUR scottieresources.com

  3. Slide 3: Investment Highlights

    scottie RESOURCES CORP INVESTMENT HIGHLIGHTS A Uinl= SCOWMME GOLD IPIROUECT LOCATED IN B GOLDEN TRIANGLE Prolific Tier 1 mining jurisdiction Favourable geologic position 7 past-producing mines INFRASTRUCTURE & ACCESSIBILITY 40km from Stewart, BC, and the Portland Canal | 4-season road access Powerli

  4. Slide 4: Golden Triangle deposit values

    $38.3 B $65 M $24.4 B $22.7 B $637 M $200 M $24.4 B $1.5 B $266 M $264 M 4

  5. Slide 5: District-scale land package near Stewart, BC

    BRUCEJACK MINE Newcrest Mining - 12 km north PAST-PRODUCING SCOTTIE GOLD MINE PREMIER MINE & MILL Ascot Resources - 15 km south DISTRICT-SCALE LAND PACKAGE STEWART, BC RED MOUNTAIN DEPOSIT f GEORGIA RIVER MINE scottie ———— RESOURCES CORP OTCQB: | TSXv: | FRANKFURT: scottieresources.com

  6. Slide 6: Infrastructure at the Scottie Gold Project

    INFRASTRUCTURE AT THE SCOTTIE GOLD PROJECT scottie é Resources corp OTCQB: | TSXV: | FRANKFURT: SCOTTIE GOLD MINE, Six portals, shafts, rail system, 7 kr of drifts, flat areas for new infrastructure] TRANSMISSION LINE Less than 1.5 km from the project ae scottie RESOURCES CORP 2) A FOUR-SEASON ROAD

  7. Slide 7: Relative Locations of Targets

    RELATIVE LOCATIONS OF TARGETS COTTIEGOLD MINE _ BLUEBERRY CONT TACT ZONE ~ * “C&D ZONES So ® a5 CRANDUC ROAD ~~ TAILINGS” DRAINED LAKE BED . === UTHOLOGICAL CONTACT + gee scottie is URCES CORP ‘OTCQB: SCTSF | TSXV: SCOT | F PREMIER y 8 scottieresources.com

  8. Slide 8: The Past-Producing Scottie Gold Mine

    THE PAST-PRODUCING SCOTTIE GOLD MINE . 2 Pa Q- 2022 DRILLING STTe ore meall 259G/TGOLD ca Zp 020 ORIN OVER 7.84 M Mine prod uced 95,426 11.8 G/T GOLD ie : 4 " ‘ok ae ee ounces of gold GERM tome et lage A 10.7 G/T GOLD Average recovered grade 4.12 G/TGOLD | OA ] : OUER 277M of 16.2 g/t gold —___ OVER

  9. Slide 9: Blueberry discovery to expansion

    ma sr ME BLUE! 100% ROYALTY FREE DISCOVERY New mineralization target discovered Development of a new geological model VALIDATION Confirming continuity of mineralized structure EXPANSIO Targeting to develop a resource ADVANCEMENT Expanding the limits of the system 630 METRES DRILLED 1,624 METRES DRIL

  10. Slide 10: 2019 Drill Program

    2019 DRILL PROGRAM 7.44 G/T GOLD OVER 34.78 M © 2019 DRILL COLLAR mmm DRILL TRACE DRILL INTERCEPT BLUEBERRY VEIN w= FOUR SEASON ROAD i) ' 150 300m ale)

  11. Slide 11: 2019 & 2020 Drill Programs

    2019 & 2020 N DRILL PROGRAMS a) 35.8 G/T GOLD OVER 2.33 M 2.05 G/T GOLD OVER 44.0 M ‘ 8.96 G/T GOLD - O20 Dau couLag OVER 13.68 M Sau teer » £ #® OURO OVER 34.78 M ' 22.3 G/T GOLD OVER 6.10 M 1

  12. Slide 12: 2021 Drill Program

    2021 DRILL PROGRAM 34.6 G/T GOLD OVER 11.86 M_ INCLUDING 77.6 G/T GOLD _ @UNEWCREST BRUCEJACK MINE 125 KM SELECTED RESULTS 14.6 G/T GOLD OVER 4.75 M 15.2 G/T GOLD OVER 2.84 M 18.7 G/T GOLD OVER 3.17M 28.3 G/T GOLD OVER 1.50 M 4.27 G/T GOLD OVER 11.9 M 2.70 G/T GOLD OVER 1.24 M @ 2021 DRILLCOLLAR © 2

  13. Slide 13: Selected Results

    ~~ SELECTED RESULTS | : : 34.5 G/T GOLD 2022 DRILLING 2021 DRILLING 2020 DRILLING 2 2019 DRILLING DRILL INTERCEPT MINERALIZING CONTACT (DEFINED) | MINERALIZING CONTACT (INFERRED) + FAULT RANDUC ROAD. ICAL ROAD BRUCEJACK POWERLINE. NEWCREST MINING CLAIMS STLE MINING CLAIMS. OVER 4.70 M 13.3 G/T GOLD

  14. Slide 14: 1,550 m Strike Length, 3000 m Depth

    1,550 M STRIKE LENGTH 200 600 200 3000 400 M DEPTH 1200 FY Ny oe Sart 130 g/t Au over 1.05 m 9.79 g/t Au over 25.00 m 22.3 g/t Au over 6.10 m 53.2 g/t Au over 3.00 m 15.3 g/t Au over 13.4 m i OPEN —|™ 28.8 g/t Au over 4.94 m O mm 34.6 g/t Au over 11.8 m | B 1) =H 2 i 34.5 g/t Au over 4.70 m ray AT e

  15. Slide 15: 2023 Drill Program

    4 @> 2022 DRILLING © 2019-2021 DRILLING CG 2022 ROCK SAMPLES 2022 GEOPHYSICAL GRID MINERALIZED CONTACT (DEFINED) MINERALIZED CONTACT (INFERRED) DRI LL PHOS RAM jae wees GRANDUC ROAD 2S BRUCEJACK TRANSMISSION LINE MIE. NEWCREST MINING CLAIMS, DD CASTLE MINING CLAIMS FOCUS ON EXPANSION OF THE BLUEBERR

  16. Slide 16: Directors & Senior Management

    DIRECTORS & SENIOR MANAGEMENT PROVEN TRACK RECORD OF SUCCESS CEO, PRESIDENT & DIRECTOR BRADLEY ROURKE | a corporate Finance Executive with 30 years experience and a proven track record in Mining, Energy, and Real Estate Development. VP EXPLORATION THOMAS MUMFORD, Ph.D, P.Geo | Professional explorati

  17. Slide 17: Shareholder structure

    34.1% RETAIL INVESTORS 265,956,067 HNW INVESTORS 312,596,301 BOARD & MANAGEMENT 7% 29.9% ~$77 MILLION CAD PAN AMERICAN SILVER 7% ERIC SPROTT 9% ~$7.5 MILLION CAD 13% INSTITUTIONS 17

  18. Slide 18: Contact

    scottie RESOURCES CORP 905-1111 West Hastings St., Vancouver, BC, Wo 2S. Camacla SCOTTIERESOURCES.COM BUSINESS DEVELOPMENT ta 250 2147 2321 gordon@scottieresources.com OTCQB: [| TSdeye | FRANKFURT:

Scottie Resources — Investor Presentation (May 2023) on 6ix