Amaroq Ltd. · LSE:AMRQ

Amaroq — Amaroq Minerals — Investor Presentation (November 2024)

27 slides from Amaroq's investor presentation, November 2024

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION November 2024 www.amaroqminerals.com | AMRQ Amaroq Minerals Ltd. is a Greenland-focused mining company engaged in the identification, acquisition, exploration and development of gold and strategic metals properties in Greenland.

  2. Slide 2: Disclaimer and Technical Information

    DISCLAIMER AND TECHNICAL INFORMATION The information contained herein has been provided solely for information purposes and does not purport to be comprehensive or contain all the information that may be required by recipients to evaluate Amaroq Minerals Ltd (the “Company”). The presentation and the

  3. Slide 3: Highly Experienced Board and Executive Management Team

    HIGHLY EXPERIENCED BOARD AND EXECUTIVE MANAGEMENT TEAM Eldur Olafsson Ellert Arnarson Joan Plant Founder, President & CEO Chief Financial Officer Executive Vice Board Member President BOARD MEMBERS MANAGEMENT TEAM Graham Stewart Warwick Morley-Jepson Non-Executive Chairman Non-Executive Director Jam

  4. Slide 4: Amaroq Investment Case

    AMAROQ INVESTMENT CASE Amaroq minerals Nordic resource development strategy CORE BUSINESS PILLARS Development & Exploration Logistics & Renewable Mining Servicing Energy 1 Shortest, lowest risk path to cashflow via the re-development of Nalunaq Nalunaq cashflow to self-fund and 2 unlock the true gol

  5. Slide 5: Greenland Supports the Main Growth in the Nordics

    GREENLAND SUPPORTS THE MAIN GROWTH IN THE NORDICS Amaroq – largest licence holder in South Greenland Members of The European Self-governing country within Raw Materials Alliance the Kingdom of Denmark (ERMA) with +90 Operating closely associated with the EU, Companies although not a member Supportiv

  6. Slide 6: Corporate Summary

    CORPORATE SUMMARY Share Price (1) Ticker: £0.78 (AIM), High-quality register with a substantial C$1.40 (TSX-V) base of institutional shareholders AMRQ (AIM / TSX-V / NASDAQ Iceland) ISK 140.5 (NASDAQ) Other UK & Canada investors 19% Icelandic Investment Funds Financial highlights and Private Investo

  7. Slide 7: Gold Portfolio Nalunaq A/S

    GOLD PORTFOLIO NALUNAQ A/S Amaroq Minerals: Corporate Profile

  8. Slide 8: Amaroq's Gold Portfolio

    AMAROQ’S GOLD PORTFOLIO TARTOQ NANOQ NANORTALIK GOLD BELT EAGLE’S NEST 2,013 km2 12 VAGAR RIDGE Current Licence Holding Active project Sites NALUNAQ GOLD MINE 1 (Nalunaq) Producing Assets Slide: 7 Amaroq Minerals: Corporate Profile

  9. Slide 9: Nalunaq – Operating Mine Layout

    NALUNAQ – OPERATING MINE LAYOUT MINING FRONT 1 Underground Production, Surface Processing and Camp and Port MOUNTAIN BLOCK MINING FRONT 2 TARGET BLOCK HARBOR CAMP TRIAL MINING AREA TEMP FUEL STORAGE MOUNTAIN MINE ROAD BLOCK MINING FRONT 3 VALLEY BLOCK 450 LEVEL TARGET BLOCK 300 PORTAL TAILINGS SOUTH

  10. Slide 10: Nalunaq Mine – Construction Metrics

    NALUNAQ MINE – CONSTRUCTION METRICS Estimated Construction Metrics 3,500+T ~40,000T CARGO DELIVERED MATERIAL MINED TO DATE 1,535 m3 600+ MATERIAL USED IN ROAD CONSTRUCTION 20ft CONTAINERS DELIVERED 11,500T +100T 9,250 OVERBURDEN REMOVED EXPLOSIVES DEVLIVERED MAN-DAYS ~170,000T 4 MATERIAL MOVED TO CR

  11. Slide 11: The Nalunaq Gold Mine

    THE NALUNAQ GOLD MINE Slide: 10 Amaroq Minerals: Corporate Profile

  12. Slide 12: Nalunaq Key Metrics 2025

    NALUNAQ KEY METRICS 2025 Q1-2025 Q2-2025 Q3-2025 Q4-2025 Ave. Processing Rate (t/day)1 140-160t/d 190-210t/d 240-260t/d 260-300t/d Plant Recovery1 65-70% 70-80% 80-90% 90-94% Phase 1 (Gravity) Total Capital Cost US$104.8m Phase 2 (Flotation) Cash Outlay1 US$2.8m US$2.6m Phase 1 @ 31/10 85% Complete

  13. Slide 13: Nalunaq Resource Growth

    NALUNAQ RESOURCE GROWTH Main Vein Resource Growth Underground Drilling Current Mineral Resource 2024 Surface Drilling 320Koz @ 28 g/t Au 2.99Km MOUNTAIN BLOCK Exploration Target 2024 Underground Drilling 2Moz 3.7Km (Planned) TARGET BLOCK Ave Thickness 0.7m Planned Underground Drilling Highest Grade

  14. Slide 14: Nalunaq Resource Growth – Vein Potential

    NALUNAQ RESOURCE GROWTH 75 Vein Potential Current Mineral Resource 2024 Surface Drilling TBD 2.99Km Exploration Target 2024 Underground Drilling TBD 3.7Km (Planned) Ave Thickness (estimate) 0.8m Resampling programme Highest Grade Intersect from historical drilling to 256g/t Au over 0.5cm further tes

  15. Slide 15: Nanoq Gold Project

    NANOQ GOLD PROJECT NANOQ Further High-Grade Projects within the Nanortalik Gold Belt Historical results up to 175g/t Au over 0.8m* JOKUM’S SHEAR Nanoq, along with Jokum's Shear, sits on a 25km structural corridor within the Nanortalik Gold Belt. Originally discovered by GEUS & Goldcorp in the 1990s

  16. Slide 16: Nanoq Gold Project – 2024 Exploration Results

    NANOQ GOLD PROJECT Visible coarse 2024 Exploration Results gold in hole NAN2401 1.5m @ 18.1 g/t Au incl. 0.5m @ 44.2 g/t Au, Local fold geometry Visible gold observed 175 g/t historical sample at surface 2.2m @ 4.61 g/t Au incl. 1.1m @ 7.23 g/t Au 3.02m @ 1.87 g/t Au 3.2m @ 19.51 g/t Au incl. 0.5m @

  17. Slide 17: Nanoq Gold Project – Exploration and Development Programme

    NANOQ GOLD PROJECT Conceptual Exploration and Development Programme Stage 1 (2024) – Scout drilling to confirm mineralization style and potential grades, offering insights into operational requirements. Stage 2 (2025) – Systematic drilling focused on understanding geometry, grade continuity, metallu

  18. Slide 18: Nalunaq Satellite Projects

    NALUNAQ SATELLITE PROJECTS TOM’S VEIN (Up to 9.25g/t Au) Near Plant Opportunities EAGLE’S NEST (Up to 34g/t Au) IVITUUT EAST RIDGE (Up to 86.7g/t Au) VAGAR RIDGE (Up to 2,533g/t Au) BISMUTH VALLEY (Up to 3g/t Au) JOHN’S LAKE SHIP MOUNTAIN NALUNAQ GOLD MINE Gold Exploration Licence Nalunaq Mining Lic

  19. Slide 19: Strategic Minerals Gardaq A/S JV (51%)

    STRATEGIC MINERALS GARDAQ A/S JV ( 5 1 % ) Amaroq Minerals: Corporate Profile

  20. Slide 20: Amaroq's Strategic Mineral Portfolio

    AMAROQ’S STRATEGIC MINERAL PORTFOLIO 1 COPPER – Proven Porphyry Potential JOHAN DAHL LAND 2 NICKEL – Voisey’s Bay Analogy Copper TARGET NORTH 3 RARE EARTH – Gardar Provice Copper/Gold TARGET WEST Copper JOSVA Copper NUNARSUIT /Nickel/REE 4,246 km2 >20 LICHTENAU STENDALEN Copper/Nickel Current Licenc

  21. Slide 21: 2025 Exploration Growth Strategy

    2025 EXPLORATION GROWTH STRATEGY Future Programme – Results Dependant Upcoming Exploration News flow 75 Vein Resampling Results Gold Strategic Minerals Nalunaq 2024 Surface Drilling Results Nalunaq Outcrop Sampling Results Nanoq Scout Drilling Results Nalunaq New Copper Definition & Infill Target De

  22. Slide 22: Servicing Greenland

    SERVICING GREENLAND Providing sustainable uplift for Greenland via increased supply chain transparency, availability and cost savings Growing interest and investment in Greenland’s mining industry (20-30% annual growth) which is set to continue ServiceCo Initial asset list identified and prioritized

  23. Slide 23: Renewable Energy Strategy

    RENEWABLE ENERGY STRATEGY To provide renewable energy option to Amaroq’s mining and exploration operations Nalunaq o Process Plant – Hydroelectric power to reduce diesel usage o Mining – in discussion with equipment providers to acquire battery run equipment to reduce ventilation and diesel requirem

  24. Slide 24: Nalunaq Renewable Energy Production

    NALUNAQ RENEWABLE ENERGY PRODUCTION Hydro and Wind Nalunaq Hydro CAPEX - CAD 6,0m Capacity 700 kW Generation 3.5 GWh/yr Annual diesel savings 1.2m L Annual cost savings 1.97 mCAD Annual OPEX 80 kCAD Net savings 1.89 mCAD/yr Reduced CO2 emissions 3.15 Kt/yr Nalunaq Wind CAPEX - CAD 1,8m Capacity 300

  25. Slide 25: Creating a Greenlandic Legacy Based on Nordic Principles

    CREATING A GREENLANDIC LEGACY BASED ON NORDIC PRINCIPLES Empowering Greenland to become a strategic supplier of gold and the materials needed to power a greener future Feeding the Global Bringing Long-term Building a Green Transition Value to Greenland Responsible Future Meeting the universal critic

  26. Slide 26: 2024-25 Intended Milestones / News Flow

    2024-25 INTENDED MILESTONES / NEWS FLOW Q4-2024 Q1-2025 Q2-2025 Q3-2025 Q4-2025 Q1-2026 Q1 Q1 NALUNAQ 1st Gold Phase 1 MRE4 Phase 2 Steady State MRE5 Commission Commission Operation EXPLORATION Exploration Start of Initial Exploration Results Exploration Results Results REGULATORY, SERVICES/ENERGY Q

  27. Slide 27: Contact Us

    www.amaroqminerals.com CONTACT US AMAROQ MINERALS LTD 100 King Street West, Suite 3400, 1 First Canadian Place, Toronto, Ontario, M5X 1A4, Canada Eldur Olafsson, Chief Executive Officer AIM, TSXV, Nasdaq: AMRQ

Amaroq Minerals — Investor Presentation (November 2024) on 6ix