Amaroq Ltd. · LSE:AMRQ
Amaroq — Q3 2026 Earnings Presentation
17 slides from Amaroq's earnings presentation, November 2026
Slide 1: Results for Q3 2026
It can be done: Unlocking Greenland’s growth potential through a diversified mining portfolio, experienced team and entrepreneurial spirit Results for Q3 2026 Presentation November 2026
Slide 2: Presenters
Presenters 01 Q3 2026 Highlights Eldur Ólafsson Ellert Arnarson CEO CFO 02 Financials 03 Outlook Edward Westropp CDSO Building a Greenlandic Legacy 2
Slide 3: Q3 2026 Highlights
Q3 2026 Highlights Eldur Ólafsson CEO Building a Greenlandic Legacy www.amaroqminerals.com
Slide 4: Q3 2026 Highlights - Strong performance in line with guidance
Q3 2026 Highlights - Strong performance in line with guidance ~12.6 koz 23.6 g/t C$65.4M Concentrate Gold produced in Q3 Q3 head grade Q3 revenue First shipment ~21.6 koz produced year to date From ~19.3 kt milled in Q3 Gross profit C$45.6 m & net Successful first concentrate profit of C$24.4m shipm
Slide 5: Post Period Highlights
Post Period Highlights ‘String of Pearls’ Maarmorilik Maarmorilik development pathway advancing High-grade exploration results Terms of Reference submitted; key step into EIA & SIA Assays confirm high-grade Zn-Pb-Ag (up to 62% Zn), plus gallium & germanium Nanoq FTSE 250 Resource drilling complete E
Slide 6: Nalunaq On-going Resource Growth
Nalunaq On-going Resource Growth 810 Exploration Planned Drift Development Completed 802 programme 876 2027 864 852 840 Completed 773 programme 828 816 804 2026 792 Planned programmes in 810 Ongoing stope drilling into Exploration Drift testing western stops from 810 Mountain Block Western continuit
Slide 7: Nanoq
Exploration Nanoq Camp Resource development plans Port Facility • Mineralisation in Central Zone over ~600m of strike. Previous drilling averaging 3.3m at 9.98g/t Au. • The 2026 resource drilling completed - 4.7km drilled and maiden MRE planned in Q1 2027. • Successful metallurgical test work comple
Slide 8: Maarmorilik String of Pearls development concept
Maarmorilik Kangerluarsuk String of Pearls development concept ~20km String of pearls Resource development and mining sequencing, leveraging existing infrastructure and accessing multiple targets in order to developing safe access to Archangel and the high-grade pillars Tributary DIZ Archangel Cover
Slide 9: Financials
Financials Ellert Arnarson CFO Building a Greenlandic Legacy www.amaroqminerals.com
Slide 10: Q3 and 9M 2026 Income Statement
Q3 and 9M 2026 Income Statement All numbers in C$ millions; due to rounding, totals may not sum precisely Q3 2026 Q3 2025 9M 2026 9M 2025 9M YoY • Sales of 11,068 oz in Q3 (Q3 2025: 2,636 oz) for revenue of C$65.4 million (Q3 2025: C$12.8 Revenue 65.4 12.8 121.6 16.3 105.3 million), and C$121.6 mill
Slide 11: Q3 2026 Balance Sheet
Q3 2026 Balance Sheet All numbers in C$ millions; due to rounding, totals may not sum precisely Assets 30 Sep 2026 30 Sep 2025 Liabilities 30 Sep 2026 30 Sep 2025 Cash 51.5 55.3 Accounts payable 31.9 18.8 Prepaid expenses and others 12.3 13.8 Other current liabilities 3.5 0.2 Inventory 38.1 18.0 Loa
Slide 12: Q3 and 9M 2026 Cash Flow Summary
Q3 and 9M 2026 Cash Flow Summary All numbers in C$ millions; due to rounding, totals may not sum precisely 9M 2026 Q3 2026 9M 2025 • Operating cash flow of C$21.4M in Q3 exceeded the C$20.4M generated in all of H1, driven by Cash, beginning of period 21.5 28.5 45.2 higher gold sales and the first co
Slide 13: Outlook
Outlook Eldur Ólafsson CEO Building a Greenlandic Legacy www.amaroqminerals.com
Slide 14: 2026 Guidance vs 9M Actuals
2026 Guidance vs 9M Actuals Guidance for FY 2026 9M 2026 Actuals 2026 gold production 25 to 35 koz 21.6 koz Average feed grade 14 to 15 g/t 21.6 g/t Gold recovery 50–70% / 90–95% 73% Nalunaq cash cost USD 44 to 47m USD 30.9m Nalunaq AISC USD 69 to 73m USD 49.9m Growth capital USD 25 to 43m USD 34.5m
Slide 15: Outlook
Outlook Nalunaq Maarmorilik Production continues in line with Project studies progressing guidance, Terms of Reference submitted; key step for EIA & Confidence in the mid range of FY guidance of 25 SIA to 35 koz Gardaq Suliaq Nanoq Assay results from Corporate Maiden MRE and project studies Ilua & M
Slide 16: Q&A
Q&A
Slide 17: Disclaimer and technical information
Disclaimer and technical information The information contained herein has been provided solely for information purposes and does not purport to be comprehensive or contain all the information that may be required by recipients to evaluate Amaroq Ltd (the “Company”). The presentation and the informat