Business
Eos Energy Enterprises Reports First Quarter 2026 Financial Results and Announces Frontier Power USA
Announced with Cerberus the formation of Frontier Power USA, a stand-alone purpose-built entity to develop, finance, and operate LDES projects to accelerate energy storage deployments Entered into a 2 GWh firm capacity reservation agreement with Frontier Power USA$57.0 million in quarterly revenue with the last two quarters surpassing full year 2025 revenue Achieved record quarterly production performance for shipments, battery output, and bipolar manufacturing Completed Factory Acceptance Testi
About this update from Eos Energy Enterprises, Inc.
[{"type":"image","alt":"Eos Energy Enterprises, Inc.","displaySize":"","headline":null,"caption":"Eos Energy Enterprises, Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":124,"url":"https://media.zenfs.com/en/globenewswire.com/28f120121f07408fabb3df5a54df52ab"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/VgKMrHclE_THaBk2diaRSQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE3NA--/https://media.zenfs.com/en/globenewswire.com/28f120121f07408fabb3df5a54df52ab","width":300,"height":124},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/VgKMrHclE_THaBk2diaRSQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE3NA--/https://media.zenfs.com/en/globenewswire.com/28f120121f07408fabb3df5a54df52ab","width":300,"height":124}},"lazy":false},{"type":"list","items":[{"val":[{"type":"text","content":"Announced with Cerberus the formation of Frontier Power USA, a stand-alone purpose-built entity to develop, finance, and operate LDES projects to accelerate energy storage deployments ","length":183,"tagName":"p"}]},{"val":[{"type":"text","content":"Entered into a 2 GWh firm capacity reservation agreement with Frontier Power USA","length":80,"tagName":"p"}]},{"val":[{"type":"text","content":"$57.0 million in quarterly revenue with the last two quarters surpassing full year 2025 revenue ","length":95,"tagName":"p"}]},{"val":[{"type":"text","content":"Achieved record quarterly production performance for shipments, battery output, and bipolar manufacturing ","length":105,"tagName":"p"}]},{"val":[{"type":"text","content":"Completed Factory Acceptance Testing for its second battery line with installation and power-on at the Thorn Hill facility underway; initial production is on schedule and expected to begin by the end of the second quarter ","length":221,"tagName":"p"}]},{"val":[{"type":"text","content":"Surpassed 6.0 GWh of discharged energy from Eos technology; DawnOS™ demonstrating consistent operating performance and improved round trip efficiency","length":149,"tagName":"p"}]},{"val":[{"type":"text","content":"Expanded an existing Southeast utility project from a 4-hour to 10-hour discharge system, increasing the total project size and upgrading to DawnOS software ","length":156,"tagName":"p"}]},{"val":[{"type":"text","content":"Reaffirms 2026 revenue guidance of $300 million to $400 million","length":63,"tagName":"p"}]}],"tagName":"ul","bul...