Business
Entrée Resources Announces Drill Results from Hugo North Extension, Including 260 Metres Grading 4.45% CuEq
VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG; OTCQB:ERLFF – the “Company” or “Entrée”) is pleased to provide analytical results for one surface diamond drill hole (“DDH”) and six underground DDHs completed during 2022 and 2024 at the Hugo North Extension (“HNE”) deposit on the Entrée/Oyu Tolgoi Joint Venture property (the “Entrée/Oyu Tolgoi JV Property”) in Mongolia. Analytical results are also provided for two DDHs from the 2024 regional drilling
About this update from Entree Resources Ltd
[{"type":"image","alt":"Entree Resources Ltd","displaySize":"","headline":null,"caption":"Entree Resources Ltd","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":264,"url":"https://media.zenfs.com/en/globenewswire.com/bef249a3666008f9fc4f21ea4faa58dc"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/Wmjfnv1Kr_FnJg327vl6MQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTM3MDtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/bef249a3666008f9fc4f21ea4faa58dc","width":300,"height":264}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG; OTCQB:ERLFF – the “Company” or “Entrée”) is pleased to provide analytical results for one surface diamond drill hole (“DDH”) and six underground DDHs completed during 2022 and 2024 at the Hugo North Extension (“HNE”) deposit on the Entrée/Oyu Tolgoi Joint Venture property (the “Entrée/Oyu Tolgoi JV Property”) in Mongolia. Analytical results are also provided for two DDHs from the 2024 regional drilling campaign on the Shivee Tolgoi mining licence.","length":545,"tagName":"p"},{"type":"text","content":"DRILL HOLE HIGHLIGHTS","length":21,"tagName":"p"},{"type":"text","content":"HNE Surface Drill Holes","length":23,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"UGD189B: 552 metres (“m”) grading 3.11% copper equivalent (“CuEq”), including 260 m grading 4.45% CuEq.","length":103,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":103,"olType":false},{"type":"text","content":"HNE Underground Drill Holes","length":27,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"UGD871: 197 m grading 1.29% CuEq, including 89 m grading 1.59% CuEq.","length":68,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":68,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"UGD873A: 279 m grading 1.22% CuEq.","length":34,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":34,"olType":false},{"type":"list","items":[{"val":[{"type":"text","content":"UGD876: 169.3 m grading 3.21% CuEq, including 112 m grading 3.83% CuEq.","length":71,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":71,"olType":false},{"type":"text","content":"Note: CuEq for HNE is defined in Note 3 to Tables 1 and 2 below, where details on the drill hole assay interval...