Xtierra Inc (TSXV:XAG) Drill core

Xtierra Inc

Drill core

ReleaseDateProjectHeadline hole
Xtierra Drill Results on the Victor Vein
X7B 56 g/t Ag over 0.85 m from 139.20 m
Feb 26, 2021Bilbao ProjectX6B 108 g/t Ag over 1.15 m from 227.35 m
Xtierra Drilling High Grade Silver Zone at Bilbao
X75 2047 g/t Ag over 0.70 m from 252.30 m
X34 711 g/t Ag over 2.00 m from 311.00 m
Jan 5, 2021Bilbao Silver-Lead-Zinc depositX42 182 g/t Ag over 1.00 m from 181.00 m
Xtierra to Drill High Grade Silver Potential at Bilbao
X75 2047 g/t Ag over 0.70 m from 252.30 m
X34 711 g/t Ag over 2.00 m from 311.00 m
Sep 24, 2020Bilbao ProjectX42 182 g/t Ag over 1.00 m from 181.00 m
Correction to results of in-fill drilling at Bilbao ProjectSep 10, 2008Bilbao ProjectX33 4.89 % Pb over 31.90 m from 38.10 m
Xtierra Inc. - Results of in-fill drilling at Bilbao project; Completion of special warrant conversion
X29 2.30 % Pb over 5.00 m from 16.00 m
X30 2.04 % Pb over 5.50 m from 17.50 m
Sep 10, 2008Bilbao ProjectX28 9.15 % Pb over 5.00 m from 126.00 m