Vizsla Copper Corp (TSXV:VCU) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Vizsla Copper Intersects 307.5 g/T Silver Equivalent Over 21.2 Meters At Palmer, Southeast Alaska CMR26-211 3.62 % Zn over 37.2 m from 145.1 m CMR26-213 1.65 % Zn over 30.6 m from 134.3 m | Oct 7, 2026 | AG Deposit | CMR26-215 307.5 g/t AgEq over 21.2 m from 180.3 m |
| VIZSLA COPPER INTERSECTS HIGH-GRADE SILVER AND GOLD MINERALIZATION AT THE PALMER PROJECT, SOUTHEAST ALASKA | Oct 1, 2026 | Palmer Project | CMR26-213 6.53 % ZnEq over 30.6 m from 134.3 m |
| VIZSLA COPPER INTERSECTS 49.2 METERS GRADING 4.7% COPPER EQUIVALENT AT ITS PALMER PROJECT IN SOUTHEAST ALASKA CMR26-201 2.14 % Cu over 40.4 m from 349.3 m | Sep 3, 2026 | Palmer Copper-Zinc VMS Project | CMR26-199 4.7 % CuEq over 49.2 m from 305.0 m |
| VIZSLA COPPER DRILLS 48.5 METERS OF 3.32% COPPER WITHIN 266.0 METERS OF 0.97% COPPER AT THE DEERHORN DEPOSIT, WOODJAM PROJECT, CENTRAL BRITISH COLUMBIA | Aug 26, 2026 | Woodjam Project | DH26-136 0.97 % Cu over 266.00 m from 306.00 m |
| VIZSLA COPPER INTERSECTS MINERALIZED BRECCIA IN EXPLORATION DRILLING NEAR THE THREE FIRS TARGET, WOODJAM PROJECT DH24-125 0.27 % Cu over 6.0 m from 232.0 m SE24-121 0.35 % Cu over 210.2 m from 63.1 m | Nov 27, 2024 | Woodjam Project | DH24-120 0.18 % Cu over 86.0 m from 191.0 m |
| Vizsla Copper Expands Deerhorn Gold-Copper Deposit With An Intersection Of 1.16 g/t AuEq Over 86.0m | Sep 3, 2024 | Woodjam Project | DH24-120 1.16 g/t AuEq over 86.0 m from 191.0 m |
| VIZSLA COPPER EXTENDS DEERHORN AND TAKOM DEPOSITS AND INTERSECTS STRONGEST COPPER MINERALIZATION TO DATE AT THE MEGATON ZONE SE23-102 0.54 % Cu over 293.2 m from 136.9 m DH23-104 0.10 % Cu over 90.7 m from 308.3 m | Dec 5, 2023 | Woodjam Project | SE23-101 0.49 % Cu over 131.5 m from 177.0 m |
| VIZSLA COPPER INTERSECTS 0.90% COPPER EQUIVALENT OVER 66.1 METRES IN INITIAL DRILL HOLES FROM ITS ONGOING EXPLORATION PROGRAM AT THE WOODJAM PROJECT, CENTRAL BC SE23-102 0.90 % CuEq over 66.10 m from 157.00 m | Sep 11, 2023 | Woodjam Project | SE23-101 0.49 % Cu over 131.50 m from 177.00 m |