Drill core
| Release | Date | Project | Headline hole |
|---|
| Stillwater Critical Minerals Reports Wide Polymetallic Expansion Drilling Including 40.8 Meters at 1.0 gt Palladium, Platinum and Gold, within Nickel-Copper-Cobalt Sulphide Mineralization CM2025-02 0.21 % NiEq over 172.5 m from 0 m CM2025-03 0.20 % NiEq over 219.5 m from 61.0 m | Mar 4, 2026 | Stillwater West | CM2025-01 0.44 % NiEq over 40.8 m from 329.2 m |
|---|
| Stillwater Critical Minerals Reports up to 1.13 g/t Rhodium in Drill Results from the Stillwater West PGE-Ni-Cu-Co + Au Project, Montana, USA, and Comments on Bipartisan Support for US Miners CM2023-01 0.162 g/t Rh over 3.7 m from 407.8 m | Nov 4, 2024 | Stillwater West PGE-Ni-Cu-Co + Au Project | CM2023-03 1.13 g/t Rh over 1.2 m from 308.8 m |
|---|
| Stillwater Critical Minerals Reports up to 0.396 g/t Rhodium in Drill Results from the Stillwater West PGE-Ni-Cu-Co + Au Project, Montana, USA CM-2021-02 0.08 g/t Pt over 333.0 m from 0.0 m CM-2021-03 0.104 g/t Rh over 8.3 m from 252.2 m | Jan 18, 2023 | Stillwater West PGE-Ni-Cu-Co + Au Project | CM2021-01 0.122 g/t Rh over 7.2 m from 304.8 m |
|---|
| Group Ten Reports 13.2 Meters of 3.33% Nickel Equivalent Within 401 Meters Continuous Mineralization from Resource Expansion Drilling at Stillwater West Critical Minerals Project in Montana, USA | May 3, 2022 | Stillwater West Critical Minerals Project | CM2021-05 3.33 % NiEq over 13.2 m from 37.6 m |
|---|