Stock listing
TSXV:OSU Orsu Metals Corp Stock Price
Follow Orsu Metals Corp into a list and get an email when it puts out news.
Delisted TSXV:OSU no longer trades. Its last trading date is unknown. Company history and updates stay available on this page.
- Ticker
- TSXV:OSU
- Asset type
- Stock
- Exchange
- TSXV
- Currency
- CAD
Orsu Metals Corp on 6ix
- News releases
- 100 in all · newest Mar 21, 2023 · oldest 2006
Drill core
| Release | Date | Project | Headline hole |
|---|
| Orsu Metals Reports Drill Results, Including 2.96 g/t gold over 24 m and 4.22 g/t gold over 11 m at Sergeevskoe Project, Russia RCS02 (EOH 90 m; Azimuth 21.6NE, Dip 60) 0.51 g/t Au over 4 m from 3.00 m RCS03 0.85 g/t Au over 3 m from 0.00 m | Jun 3, 2020 | Sergeevskoe Project | RCS01 (EOH 100 m; Azimuth 22NE, Dip 60) 4.28 g/t Au over 3 m from 1.00 m |
|---|
| Orsu Metals Further Extends Zone 23 from 740 Meters to 900 Meters and has Started Estimation Work for a Maiden Resource with Wardell Armstrong International at Its Sergeevskoe Gold Project, Russia SDH18-70 0.91 g/t Au over 19.45 m from 25.8 m SDH18-72 0.92 g/t Au over 2.75 m from 68.25 m | Dec 13, 2018 | Its Sergeevskoe Gold Project | SDH18-69 2.15 g/t Au over 4.9 m from 116.7 m |
|---|
| Orsu Metals hits 4.12 g/t Au over 10.25 Meters near Surface in Drill Hole SDH18-63 and Grows Gold Mineralization over a 740 m Strike Length at Zone 23, Sergeevskoe Gold Project, Russia | Oct 1, 2018 | Sergeevskoe Gold Project | SDH18-63 4.12 g/t Au over 10.25 m from 57.5 m |
|---|
| Orsu Metals Hits 2.62 g/t Au over 22.2 Metres and Proves Higher Gold Grades at Zone 23, Sergeevskoe Gold Project, Russia | Aug 15, 2018 | Sergeevskoe Gold Project | SDH18-43 (240 m) Section 9260E 2.62 g/t Au over 22.2 m from 153.75 m |
|---|
| Orsu Metals Reports Strike Length of Drill-Confirmed Gold Mineralization at Zone 23 Tripled, Sergeevskoe Gold Project, Russia | Feb 5, 2018 | Sergeevskoe Gold Project | SDH17-20 (162.6 m) 1.1 g/t Au over 1.3 m from 32.55 m |
|---|
| Orsu Metals extends gold mineralization at Zone 23, Sergeevskoe Gold Project, Russia SDH17-16 (183.05 m) 1.58 g/t Au over 19.1 m from 105.0 m | Jan 30, 2018 | Sergeevskoe Gold Project | SDH17-17 (144.2 m) 1.78 g/t Au over 15.2 m from 74.6 m |
|---|
| Orsu Metals Completes Phase 2 Drilling Program and Announces Significant Intercepts in Drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia | Jan 22, 2018 | Sergeevskoe Gold Project | SDH17-15 0.91 g/t Au over 6.7 m from 123.2 m |
|---|
Open Drill core
People
6ix reads each seat by machine from the page it links to, and can misread one.
| Person | Seat |
|---|
| Ben Meyer | Until Jan 18, 2023 · Past |
|---|
| Mark Corra | Until Mar 21, 2023 · Past |
|---|
| Massimo Carello | Until Dec 21, 2016 · Past |
|---|
| Sergey Kurzin | Interim Managing Director · Since Nov 14, 2022 · Appointed, no departure found |
|---|
| Vladimir Pakhomov | Until Nov 14, 2022 · Past |
|---|
Open People
Log in to ask 6ix AI your own questions about Orsu Metals Corp.