Mountain Boy Minerals Ltd (TSXV:MTB) Drill core

Mountain Boy Minerals Ltd

Drill core

ReleaseDateProjectHeadline hole
Step-Out Drilling at MTB's Telegraph Project Confirms Large Copper-Gold Porphyry SystemJan 17, 2024MTB's Telegraph ProjectDOK2023-03 0.67 % CuEq over 21.0 m from 5.0 m
Drilling On MTB's George Copper Project In BC's Golden Triangle Intersects Copper In Two Identified Horizons In All Three Holes
DDH 1927-06 1.84 % Cu over 4.6 m from 38.7 m
DDH 1976-103 0.62 % Cu over 2.9 m from 26.0 m
Oct 27, 2023George Copper ProjectDDH 1927-04 1.86 % Cu over 6.1 m from 33.5 m
MTB Reports Results from Drilling on the Red Cliff Copper-Gold Project; Further Drilling is Planned
MON-2023-8 5.6 g/t Au over 7.7 m from 10.0 m
MON-2023-9 26.1 g/t Au over 2.0 m from 8.5 m
Jul 18, 2023Red Cliff Copper-Gold ProjectMON-2023-7 1.7 g/t Au over 6.9 m from 5.6 m
Mountain Boy Announces Assays from the American Creek Project
MB-2020-002 0.576 ppm Au over 3 m from 42 m
MB-2020-002B 0.066 ppm Au over 4 m from 155 m
Feb 24, 2021American Creek propertyMB-2020-001 0.217 ppm Au over 0.44 m from 107.36 m
Mountain Boy Minerals Ltd. - 16.50 g/t Gold over 8.82 Metres Intersected on Down Dip extension of the Upper Montrose Zone in DDH-MON-11-37
DDH-MON-11-31 6.98 g/t Au over 2.22 m from 58.69 m
DDH-MON-11-36 18.0 g/t Au over 1.24 m from 52.13 m
Jan 26, 2012Red Cliff projectDDH-MON-11-29 10.90 g/t Au over 10.24 m from 80.18 m
Drilling Confirms High Grade Silver Lead Zinc Mineralization at BA, and Identifies New High Grade StructuresJul 26, 2010BA ProjectBA-2010-79 53.86 g/t Ag over 44.04 m from 0.46 m
2008 Drill Results for the Silver Coin Project
SC08-223 1.19 g/t Au over 9.15 m from 32.61 m
SC08-229 0.82 g/t Au over 27.44 m from 32.00 m
Nov 12, 2008Silver Coin projectSC08-222 0.95 g/t Au over 7.62 m from 32.00 m
DDH-2008-282 Intersects 8.86 g/t Gold over 45.72 Meters in Main Breccia Zone
2008-301A 1.15 g/t Au over 76.2 m from 14.33 m
Oct 15, 2008Silver Coin project2008-282 8.86 g/t Au over 45.72 m from 135.64 m
2008 Drill Results Have Extended the High Grade Silver - Massive Sulphide Horizon on the BA claims over at least 800 meters in Strike Length and 400 Meters Down Dip. Drilling Also Indicates that Mineralization Can Vary From 30 up to 80 Meters in Width.
2008-BA-28 136.5 g/t Ag over 13.11 m from 78.53 m
2008-BA-30 18.8 g/t Ag over 2.13 m from 13.72 m
Sep 29, 2008BA Project2008-BA-27 29.9 g/t Ag over 3.05 m from 8.23 m
Bonanza Silver in MB Silver Property Drill Results
2007-7 281.7 g/t Ag over 7.01 m from 132.63 m
HG-3 234.5 g/t Ag over 2.13 m from 12.20 m
Mar 3, 2008MB silver property2007-6 256.8 g/t Ag over 1.22 m from 0.61 m
Mountain Boy Minerals - Final Drill Results Received on the Red Cliff Property
RC-24 1.82 g/t Au over 0.30 m from 182.32 m
RC-30 1.28 g/t Au over 0.61 m from 13.72 m
Feb 5, 2008Red Cliff projectRC-10 2.17 g/t Au over 3.35 m from 16.62 m
Mountain Boy Minerals Ltd - Further Drill Results Continue to Indicate High Grade Silver Within the Massive Sulphide Horizon on the BA claims; DDH-2007-BA-17 intersects 2.44 meters of 1091 g/t Silver
2007-BA-12 26.4 g/t Ag over 5.49 m from 7.98 m
2007-BA-13 71.3 g/t Ag over 34.76 m from 3.05 m
Nov 20, 2007BA Project2007-BA-11 34.0 g/t Ag over 3.05 m from 16.46 m
Company Has Received Further Assays for the Red Cliff Property with DDH-RC-2007-19 Intersecting 3.81 Meters of 15.03 g/t Gold and 1.29 % Copper
RC-17 4.63 g/t Au over 3.59 m from 11.28 m
RC-18 9.78 g/t Au over 1.31 m from 12.96 m
Oct 4, 2007Red Cliff projectRC-16 5.66 g/t Au over 3.05 m from 10.06 m
Mountain Boy Minerals Ltd. - Drilling Continues to Indicate High Grade Silver in the Massive Sulphide Horizon on the BA claims.
2007-BA-2 276.65 g/t Ag over 6.1 m from 78.96 m
2007-BA-3 10.4 g/t Ag over 3.05 m from 13.72 m
Oct 2, 2007BA Project2007-BA-1 140.44 g/t Ag over 57.93 m from 39.33 m
Phase I Drilling indicates High Grade Copper-Gold-Silver Values on the Red Cliff Property with Values up to 3.51 % Copper over 4.02 meters.
RC-8 3.85 g/t Au over 4.72 m from 9.45 m
RC-9 1.96 g/t Au over 1.37 m from 12.35 m
Sep 4, 2007Red Cliff projectRC-7 3.51 % Cu over 4.02 m from 10.37 m
Bonanza style silver mineralization Intersected on Drilling on the MB Silver Property
2006-7 1501.0 g/t Ag over 2.71 m from 2.32 m
2006-8 1706.0 g/t Ag over 4.27 m from 2.13 m
Jan 30, 2007MB silver property2006-6 172.5 g/t Ag over 0.72 m from 0.62 m