| El Nino Ventures Inc. announces a 45.4 metre drill intersection assaying 8.49% Zinc, 0.18% Copper, 4.58% Lead, 0.59 gpt Gold and 152.2 gpt Silver at the Murray Brook Deposit, New Brunswick MB-2012-141 6.27 % Zn over 2.4 m from 178.3 m MB-2012-142 8.89 % Zn over 3.9 m from 53.0 m | Oct 2, 2012 | Murray Brook Deposit | MB-2012-138 152.2 g/t Ag over 45.4 m from 179.6 m |
|---|
| El Nino Ventures Inc. announces a 122 metre thick mineralized interval of massive sulfide mineralization assaying 6.15% Zinc, 0.10% Copper, 1.92% Lead, 0.64 gpt Gold and 70.6 gpt Silver at the Murray Brook Deposit, New Brunswick MB-2012-132 70.6 g/t Ag over 112.0 m from 89.0 m MB-2012-133 0.93 % Cu over 27.2 m from 183.0 m | Aug 28, 2012 | Murray Brook Deposit | MB-2012-131 0.73 % Cu over 21.0 m from 152.0 m |
|---|
| El Nino Ventures Inc. announces a 4.3% Zinc, 1.4% Lead and 54 g/t Silver over 81 Metres at the Murray Brook Polymetallic Deposit, Bathurst Mining Camp, New Brunswick MB-2012-123 0.80 % Cu over 36.9 m from 18.0 m MB-2012-124 54.0 g/t Ag over 81.0 m from 29.0 m | Aug 14, 2012 | Murray Brook Polymetallic Deposit | MB-2012-122 2.60 % Cu over 12.3 m from 17.0 m |
|---|
| El Nino Ventures Inc. announces a 10.34 % Zinc, 126.0 gpt Silver, 0.29 % Copper, 1.396 gpt Gold and 4.11% Lead drill intersection over 13 Metres at Murray Brook Polymetallic Deposit, Bathurst Mining Camp, New Brunswick MB-2012-115 0.59 % Cu over 52.0 m from 23.0 m MB-2012-116 0.35 % Cu over 66.6 m from 127.0 m | Jul 30, 2012 | Murray Brook Polymetallic Deposit | MB-2012-114 46.5 g/t Ag over 79.5 m from 56.0 m |
|---|
| El Nino Ventures Inc. Drills 9.23 % Zinc, 108.7 gpt Silver, 0.18 % Copper, 0.336 gpt gold and 2.58% Lead Over 31 Metres at Murray Brook Polymetallic Deposit Bathurst Mining Camp, New Brunswick MB-2012-103 0.79 % Cu over 17.20 m from 133.10 m MB-2012-104 1.37 % Cu over 17.00 m from 165.00 m | Jul 17, 2012 | Murray Brook Polymetallic Deposit | MB-2012-102 0.83 % Cu over 50.20 m from 68.00 m |
|---|
| El Nino Ventures Inc. continues to intersect High Grade Zinc, Gold and Silver Over Significant Intervals at Murray Brook Polymetallic Deposit, Bathurst Mining Camp, New Brunswick MB-2012-92 2.86 % Zn over 2.54 m from 208.06 m MB-2012-97 56.84 g/t Ag over 75.00 m from 126.00 m | Jun 27, 2012 | Murray Brook Polymetallic Deposit | MB-2012-98 57.38 g/t Ag over 7.05 m from 167.00 m |
|---|
| El Nino Ventures Inc. Announces High Grade Zinc, Gold and Silver intersections over significant intervals from the Phase II 18,000 metre Drill Program at Murray Brook Polymetallic Deposit, in Bathurst Mining Camp, New Brunswick MB-2012-76 0.49 % Cu over 48.70 m from 32.10 m MB-2012-77 69.8 g/t Ag over 60.00 m from 166.00 m | Jun 5, 2012 | Murray Brook Polymetallic Deposit | MB-2012-75 0.17 % Cu over 12.00 m from 142.00 m |
|---|
| El Nino Ventures Inc. Continues to Intersect High Grade Zinc, Lead and Silver Over Broad Intercepts at the Murray Brook Deposit, in the Bathurst Mining Camp MB-2011-38 0.777 g/t Au over 65.54 m from 46.10 m MB-2011-39 65.7 g/t Ag over 103.10 m from 118.90 m | Jan 16, 2012 | Murray Brook Deposit | MB-2011-37 0.454 g/t Au over 146.40 m from 88.00 m |
|---|
| El Nino Ventures Reports High Grade Zinc, Lead and Silver over Broad intercepts at Murray Brook deposit, in the Bathurst Mining Camp MB-2011-17 0.65 % Cu over 102.6 m from 24.10 m MB-2011-18 1.01 % Cu over 60.0 m from 47.00 m | Nov 28, 2011 | Murray Brook Massive-Sulfide Deposit | MB-2011-15 0.16 % Cu over 6.3 m from 29.00 m |
|---|
| Significant drill results continue to be intersected in the Murray Brook deposit, the fifth largest massive sulfide deposit in the Bathurst Mining Camp MB-2010-16 0.47 % Cu over 27.0 m from 44.0 m MB-2010-17 0.33 % Cu over 80.0 m from 15.0 m | Aug 30, 2011 | Murray Brook Massive-Sulfide Deposit | MB-2010-15 0.10 % Cu over 3.9 m from 163.8 m |
|---|
| Up to 27 Metres (88.6 ft) of 9.56% Zinc; 122.1 g/t (3.56 opt) Silver; 0.1 g/t Gold and 0.47% Copper, In Three-Hole Due Diligence Drill Program at Murray Brook Massive Sulphide Deposit, New Brunswick MB-10-16 0.47 % Cu over 27.0 m from 44.0 m MB-10-17 1.28 % Zn over 80.0 m from 15.0 m | May 11, 2011 | Murray Brook Deposit | MB-10-15 0.1 % Cu over 3.9 m from 163.8 m |
|---|
| El Nino Ventures Inc. makes significant Copper/Cobalt discovery (29 meters at 2.82% Cu and 0.34% Co) in the Democratic Republic of Congo | Oct 6, 2008 | Kasala Project | MDB-023 2.82 % Cu over 29 m from 17 m |
|---|
| El Nino Releases Results from Mount Fronsac North Infill Drilling Program ELN-06-101 5.04 % Zn over 3.0 m from 269.90 m ELN-06-100 1.15 % Zn over 4.9 m from 322.10 m | Dec 7, 2006 | Mount Fronsac North Deposit | ELN-06-097 5.68 % Zn over 3.0 m from 306.85 m |
|---|