Home
Stocks
Blackwolf Copper and Gold Ltd
Drill core
Blackwolf Copper and Gold Ltd (TSXV:HTR) Drill core
Blackwolf Copper and Gold Ltd
Drill core
Release
Date
Project
Headline hole
Blackwolf Reports Final Results for Drilling and Surface Sampling on the Harry Property and The Inaugural Drilling on the Cantoo Property
H23-013 0.15 g/t Au over 0.50 m from 55.00 m
H23-014 0.07 g/t Au over 1.00 m from 66.00 m
Jan 19, 2024
Harry Property
H23-012 1.410 % Zn over 0.47 m from 67.32 m
Blackwolf Drills Significant New Discovery at the Harry Property; Intersecting 312 g/t Gold over 1.0 Meter (10.0 Opt) and 277 g/t Gold over 1.0 Meter (8.9 Opt)
Oct 30, 2023
Harry Property
H23-017 118.0 g/t Ag over 1.00 m from 199.00 m
Blackwolf Intersects 27.0 Meters Averaging 1.1% Copper, 1.9 g/t Gold, 32.8 g/t Silver and 1.0% Zinc or 3.1% Copper-Equivalent from Lookout Deposit at Niblack
U21-226 1.06 % Cu over 27.00 m from 326.00 m
U21-227 1.03 % Cu over 32.60 m from 321.90 m
Jun 16, 2021
Lookout Deposit
U21-225 0.11 % Cu over 2.66 m from 301.00 m
Blackwolf Intersects 7.59 Meters Averaging 5.2% Copper, 2.7 g/t Gold, 145.1 g/t Silver and 6.5% Zinc or 10.7% Copper-Equivalent in Massive Sulphides at Niblack
LO20-214 0.51 % Cu over 7.27 m from 25.95 m
LO20-215 5.18 % Cu over 7.59 m from 100.58 m
May 3, 2021
Niblack Mine
LO20-213 2.33 % Cu over 11.08 m from 26.50 m