Auriginal Mining Corp. (TSXV:AUME) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Auriginal Reports Updated NI 43-101 Mineral Resource Estimate at Roger: Nearly 1.40 Million Ounces of Gold Inferred at 0.54 g/t Gold - Zone Open to Resource Expansion AUR-26-12 1.05 g/t Au over 45.5 m from 397.0 m AUR-26-10 1.32 g/t Au over 29.4 m from 402.0 m | Oct 22, 2026 | Roger Project | AUR-26-07 0.67 g/t Au over 125.3 m from 346.0 m |
| Auriginal Intersects 45.5 m of 1.05 g/t Au and 29.4 m of 1.32 g/t Au at Roger, Extending Gold-Copper Mineralization at Depth; Updated Mineral Resource Estimate Expected Before Year-End 2026 AUR-26-09 (-65 0 ) 0.51 g/t Au over 6.0 m from 355.5 m AUR-26-10 (-65 0 ) 1.32 g/t Au over 29.4 m from 402.0 m | Oct 15, 2026 | Roger Project | AUR-26-08 (-65 0 ) 0.32 g/t Au over 6.7 m from 127.3 m |
| Auriginal Returns Wide Gold and Copper Intersections at Roger Project in Chibougamau, Expands Mineralization 125 meters at Depth AUR-26-06 0.69 g/t Au over 34.5 m from 70.5 m AUR-26-07 0.67 g/t Au over 125.3 m from 346.0 m | Sep 1, 2026 | Roger Project | AUR-26-05 1.12 g/t Au over 23.5 m from 210.5 m |
| Auriginal Mining Confirms Gold-Rich VMS System at Roger; Drills 32.6 g/t Gold Over 1.2 m AUR-26-04A 32.6 g/t Au over 1.2 m from 584.6 m AUR-26-05 1.11 g/t Au over 5.6 m from 210.5 m | Jul 14, 2026 | Roger Project | AUR-26-03 2.03 g/t Au over 1.5 m from 180.0 m |
| Auriginal Mining Confirms Two-Mineralization Style Potential at Roger: Drilling Hits Predicted VMS Sulphides and Expands the Porphyry Cu-Au System AUR-26-02 2.00 g/t Au over 4.4 m from 109.6 m | Jun 2, 2026 | Roger Project | AUR-26-01 1.13 g/t Au over 1.5 m from 52.5 m |
| Kintavar Exploration intersects 1.01% Cu, 19.3 g/t Ag near surface over 16.8m at Wabash Project WAB-21-20 0.11 % Cu over 16.95 m from 158.8 m WAB-21-11 0.23 % Cu over 6.60 m from 17.3 m | Mar 24, 2022 | Wabash Project | WAB-21-21 0.39 % Zn over 2.50 m from 30.5 m |
| Kintavar Drilling Results on Sherlock; Gold and Cobalt Trend Identified on Mitchi; Summer Exploration Begins MS-19-63 0.82 % Cu over 3.4 m from 1.45 m MS-19-64 0.60 % Cu over 16.1 m from 2.00 m | Jun 17, 2020 | Mitchi project | MS-19-62 0.73 % Cu over 8.5 m from 3.45 m |
| Kintavar intersects 45m @ 0.45% Cu and 23m @ 0.57% Cu; Provides update due to COVID19 virus outbreak MS-19-54 0.57 % Cu over 23.0 m from 27.0 m MS-19-55 0.17 % Cu over 12.0 m from 16.8 m | Mar 31, 2020 | Mitchi project | MS-19-53 0.52 % Cu over 4.65 m from 1.0 m |
| Kintavar intersects 0.53% Cu over 53m from 19m; Sub-horizontal model confirmed MS-19-48 0.48 % Cu over 4.5 m from 23 m MS-19-49 0.55 % Cu over 1.5 m from 1.25 m | Jan 20, 2020 | Mitchi project | MS-19-47 0.20 % Cu over 8.8 m from 3 m |
| Kintavar Exploration Inc. Confirms Near Surface Mineralization at the Conan Zone; Identifies a Large Copper Soil Anomaly in the Area MS-18-44 0.21 % Cu over 17.25 m from 4.45 m | Feb 21, 2019 | Conan zone | MS-18-43 0.33 % Cu over 10.00 m from 3.75 m |
| Kintavar Exploration Inc. drills 51m @ 0.24% Cu, Opens the Sherlock Zone to the East MS-18-38 0.20 % Cu over 46.30 m from 4.70 m MS-18-39 0.11 % Cu over 24.10 m from 11.90 m | Feb 11, 2019 | MS-18-37 0.14 % Cu over 56.60 m from 3.00 m | |
| Kintavar Exploration Inc.: Toby and Watson Assays Extends Mineralization in Drilling to Over 1 km East-West MS-18-25 0.22 % Cu over 4.1 m from 38.9 m MS-18-26 0.21 % Cu over 2.0 m from 30.0 m | Nov 29, 2018 | MS-18-24 0.59 % Cu over 11.6 m from 6.7 m | |
| Kintavar Exploration: Discovery of a New Copper Zone, Irene, 550 m North of Sherlock MS-18-19 0.31 % Cu over 45.0 m from 59.0 m MS-18-20 0.27 % Cu over 7.0 m from 10.0 m | Sep 17, 2018 | MS-18-18 0.14 % Cu over 10.9 m from 12.1 m | |
| Kintavar Discovers New Zone North of Sherlock, Intersects 0.61% Copper and 3.76 g/t Silver Over 30.0 Metres Within 120.0 Meters Grading at 0.34% Copper and 2,90 g/t Silver on Mitchi Property MS-17-03 3.76 g/t Ag over 30.00 m from 99.00 m MS-17-04 0.33 % Cu over 17.35 m from 3.75 m | Jan 31, 2018 | Mitchi project | MS-17-01 0.44 % Cu over 7.10 m from 2.90 m |