| American Creek's JV Partner Tudor Gold Intersects Wide Gold Intervals in Two 150 Meter Northeast Step-out Holes at the Goldstorm Deposit, Treaty Creek Property, Golden Triangle British Columbia GS-23-167 1.31 g/t AuEq over 337.50 m from 880.50 m GS-23-168 1.02 g/t AuEq over 309.00 m from 462.00 m | Jul 11, 2023 | Goldstorm Deposit | GS-23-164 1.01 g/t AuEq over 412.50 m from 622.50 m |
|---|
| American Creek Intersects Strong Gold-Copper Porphyry Mineralization Returning 1.71 g/t AuEQ over 180 m Within 489 m of 1.12 g/t AuEQ Within the Step-Out Area Outside of the Goldstorm Deposit at Treaty Creek Joint Venture And (CS600) 1.12 g/t AuEq over 489.0 m from 1140.25 m Including (CS600) 0.44 g/t Au over 89.50 m from 1665.00 m | Nov 24, 2022 | Goldstorm Deposit | GS-22-157 (300H) 0.63 g/t Au over 205.50 m from 381.00 m |
|---|
| American Creek Intersects Strong Gold-Copper Porphyry Mineralization Returning 1.82 g/t AuEQ over 114.0 M Within 592.5 M of 1.16 g/t AuEQ in Northernmost Step-Out Section of the Goldstorm Deposit, at Joint Ventured Treaty Creek CB-22-01 0.65 g/t Au over 168.00 m from 21.00 m CB-22-02 0.62 g/t Au over 39.00 m from 322.50 m | Nov 1, 2022 | Goldstorm Deposit | KZ-22-01 2.29 g/t Au over 6.00 m from 90.50 m |
|---|
| American Creek Reports Preliminary Results from a 350m Step-Out Hole, with 59.53 G/T AuEq over 1.5m and In-Fill Hole with 2.02 G/T AuEq over 180m Including 3.18 G/T AuEq over 93m at the Joint Venture Treaty Creek Property, Golden Triangle, British Columbia GS-22-151-W1 (300H) 1.22 g/t Au over 82.50 m from 57.00 m (CS600) 59.53 g/t AuEq over 1.50 m from 744.00 m | Sep 13, 2022 | Joint Venture Treaty Creek Property | GS-22-151 (300H) 1.19 g/t Au over 18.00 m from 549.00 m |
|---|
| American Creek Reports 9.55 g/t AuEq Over 10.5 Meters Within 102.0 Meters of 2.64 g/t AuEq Within 517.5 Meters Of 1.10 g/t AuEq From The Goldstorm Deposit, At The Joint Venture Treaty Creek Property, Golden Triangle, British Columbia EZ-22-05 0.28 g/t Au over 97.50 m from 51.50 m EZ-22-06 0.30 g/t Au over 142.85 m from 63.15 m | Aug 23, 2022 | Goldstorm Deposit | EZ-22-04 0.25 g/t Au over 16.50 m from 92.00 m |
|---|
| American Creek Announces Extension of 2021 Drill Hole GS-21-113-W2 and Reports a Final Composite of 1.12 g/t AuEq over 1,497.5 Meters at the Goldstorm Deposit, Treaty Creek Project JV, Golden Triangle, British Columbia Including (300H) 1.25 g/t Au over 97.50 m from 255.00 m And including (300H) 1.80 g/t Au over 69.00 m from 590.00 m | Aug 11, 2022 | Goldstorm Deposit | GS-21-113-W2(1) (300H +CS600) 1.12 g/t AuEq over 1497.50 m from 255.00 m |
|---|
| American Creek Announces 70.96 g/t AuEq over 1.0 Meter Within 39.15 g/t AuEq over 2.0 Meters with a 225 Meter Northeast Step-Out Hole at the Goldstorm Deposit, Treaty Creek Project JV, Golden Triangle, British Columbia And (300H) 1.05 g/t Au over 27.00 m from 733.50 m | Jul 26, 2022 | Newcrest's Brucejack Lake Mine | GS-22-143 (300H) 39.15 g/t AuEq over 2.00 m from 559.00 m |
|---|
| American Creek Announces 20.86 G/T AuEQ over 4.5M Within 25.5M of 9.96 G/T AuEQ Within 663M of 0.97 G/T AuEQ in a 500M Step-Out Hole at the Goldstorm Deposit, Treaty Creek Project JV, Golden Triangle, British Columbia And (CS600) 0.97 g/t AuEq over 663.00 m from 879.00 m Or 9.96 g/t AuEq over 25.50 m from 1474.50 m | Jul 20, 2022 | Goldstorm Deposit | GS-22-134 (300H) 1.08 g/t Au over 109.50 m from 601.50 m |
|---|
| 237.3 M of 1.51 g/t AuEQ within 600 M of 0.91 g/t AuEQ from the Goldstorm Deposit on American Creek's JV Treaty Creek Or 1.84 g/t Au over 30.00 m from 195.50 m GS-22-129 (DS5) 0.88 g/t Au over 89.35 m from 968.15 m | Jul 13, 2022 | Goldstorm Deposit | GS-22-135(1) (R-66) 0.78 g/t Au over 190.50 m from 185.00 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 1.91 g/t Gold Eq Over 85.4 Meters in Step-Out Hole and Significantly Extends Gold-Copper Mineralization to the Northeast at the Goldstorm Deposit in BC's Golden Triangle And (DS5) 1.91 g/t AuEq over 85.40 m from 949.50 m GS-21-125 1.67 g/t Au over 27.00 m from 675.00 m | Jan 11, 2022 | Goldstorm Deposit | GS-21-128 0.56 g/t Au over 43.90 m from 162.10 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects Near-Surface Intercept of 1.09 G/T Gold Eq Over 476.1M and 1.22 G/T Gold Eq Over 355.15M including 1.45 G/T Gold Eq Over 247.5M at Goldstorm Deposit in BC'S Golden Triangle Including (300H) 1.09 g/t AuEq over 476.10 m from 33.00 m And including (CS600) 1.22 g/t AuEq over 355.15 m from 872.85 m | Dec 16, 2021 | Goldstorm Deposit | GS-21-122 0.42 g/t Au over 1035.00 m from 193.00 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 0.97 G/T Gold EQ Over 1,320M, Including 1.38 G/T Gold Eq Over 556.5 M, Ending In Strong Mineralization With 2.34 G/T Gold Eq Over 57M in Step Out hole At Goldstorm Deposit In BC'S Golden Triangle Includes (300H) 2.28 g/t Au over 159.00 m from 555.00 m With 2.34 g/t AuEq over 57.00 m from 1518.00 m | Nov 30, 2021 | Goldstorm Deposit | GS-21-113-W1 1.26 g/t Au over 459.00 m from 255.00 m |
|---|
| JV Partner Tudor Gold Confirms 4th Significant Gold-Silver Discovery at Treaty Creek with Drill Hole CBS-21-02 Intercepting 1.30 g/t Gold Eq over 53.9m Within 155.5m of 0.82 g/t Gold Eq at "Calm Before the Storm Zone" (CBS) | Nov 24, 2021 | Treaty Creek Project | CBS-21-02 0.82 g/t AuEq over 155.50 m from 150.50 m |
|---|
| Treaty Creek Drilling Expands Goldstorm System to Northeast with 1.76 G/t Gold Eq over 196.5 M Within 564 m of 1.09 G/t Gold Eq, and Cuts Near-Surface Gold Mineralization at the Eureka Zone with 0.76 G/t Gold Eq over 217.5 m GS-21-114 1.51 g/t Au over 11.00 m from 203.00 m GS-21-116 0.52 g/t Au over 1092.00 m from 296.00 m | Sep 28, 2021 | Seabridge's KSM Project | EK-21-01 0.76 g/t AuEq over 217.50 m from 12.50 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 972.0 Meters of 1.265 g/t Gold EQ Including 405.0 Meters of 1.439 g/t Gold EQ and 456.0 Meters of 1.352 g/t Gold EQ in Step-Out Drill Hole GS-21-113 at the Goldstorm Deposit, Treaty Creek, B.C.'s Golden Triangle GS-21-106-W1 0.717 g/t Au over 354.00 m from 0.00 m GS-21-111 0.802 g/t Au over 613.50 m from 193.50 m | Aug 31, 2021 | Seabridge's KSM Project | GS-21-106 0.754 g/t Au over 19.50 m from 73.50 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 130.5 Meters of 2.389 g/t Gold EQ Within 474.0 Meters of 1.039 g/t Gold EQ in Drill Hole GS-21-110 and 168.0 Meters of 1.391 g/t Gold EQ Within 801.0 Meters of 0.704 g/t Gold EQ in Drill Hole GS-21-103 at the Goldstorm Deposit on Treaty Creek, in B.C GS-21-104 0.385 g/t Au over 122.00 m from 174.00 m GS-21-105 0.433 g/t Au over 130.50 m from 211.00 m | Aug 4, 2021 | Seabridge's KSM Project | GS-21-103 0.704 g/t AuEq over 801.00 m from 27.00 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 3.286 gpt AuEq over 82.5 Meters Within 531.0 Meters of 0.999 gpt AuEq and 1.112 gpt AuEq over 532.5 Meters Within 1,033.5 Meters of 0.856 gpt AuEq at the Goldstorm Zone, Treaty Creek, Located in B.C.'s Golden Triangle GS-20-92 0.999 g/t AuEq over 531.0 m from 90.0 m GS-20-99 0.647 g/t AuEq over 109.5 m from 855.5 m | Jan 7, 2021 | Seabridge's KSM Project | GS-20-91 0.856 g/t AuEq over 1033.5 m from 60.0 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 1.215 gpt AuEq over 354.0 Meters Within 1225.5 Meters of 0.702 gpt AuEq (Hole GS-20-94) GS-20-81 0.422 g/t Au over 831.10 m from 558.40 m GS-20-82 0.629 g/t Au over 928.50 m from 113.00 m | Dec 16, 2020 | Seabridge's KSM Project | GS-20-80 0.369 g/t Au over 1126.50 m from 222.50 m |
|---|
| American Creek's JV Partner Tudor Gold Intersects 1,152 Meters of 0.741 gpt AuEq, Including 1.561 gpt AuEq over 121.5 Meters and 0.968 gpt AuEq over 414 Meters with Hole GS-20-75 GS-20-79 0.595 g/t AuEq over 1338 m from 81.5 m | Oct 26, 2020 | Seabridge's KSM Project | GS-20-75 0.741 g/t AuEq over 1152.0 m from 112.0 m |
|---|
| American Creek's JV Partner Tudor Gold Discovers a Significant New Gold-Silver-Copper Mineralized System at the Perfectstorm (PSZ) at Treaty Creek, as Well as, Expands the Goldstorm Mineralization Along the Northeast Axis to 1100 Meters GS-20-68 0.521 g/t Au over 793.15 m from 4.85 m GS-20-72 0.475 g/t Au over 726.0 m from 4.5 m | Sep 9, 2020 | Seabridges' KSM Project | GS-20-66 0.673 g/t Au over 523.5 m from 6.0 m |
|---|
| American Creek Reports 973 Meters Averaging 0.845 gpt AuEq From Hole GS-20-57, Including 1.40 gpt AuEq Over 217.5 Meters Making It the New Best Drill Intercept for the Treaty Creek Property In BC'S Golden Triangle GS-20-55 0.674 g/t Au over 156.0 m from 290.0 m GS-20-57 0.845 g/t AuEq over 973.05 m from 34.5 m | Jul 9, 2020 | Seabridges' KSM Project | GS-20-54 0.633 g/t Au over 121.55 m from 73.95 m |
|---|
| American Creek Reports Gold Equivalent Results for All Drill Holes at the Treaty Creek Project Located in B.C.'s Golden Triangle CB-18-32 0.542 g/t AuEq over 587.00 m from 196.50 m CB-18-34 0.499 g/t AuEq over 292.50 m from 419.00 m | Mar 4, 2020 | Treaty Creek Project | CB-17-29 0.321 g/t AuEq over 573.80 m from 1.20 m |
|---|
| American Creek Drills Multiple High-Grade Polymetallic Zones Including 3.6m of 19.4 G/t AuEq at Dunwell Project in B.C.'s Golden Triangle DW19-05 0.070 % CU over 0.35 m from 21.29 m DW19-06 0.066 % CU over 0.80 m from 26.93 m | Feb 27, 2020 | Dunwell Project | DW19-04 0.036 % CU over 1.00 m from 86.26 m |
|---|
| American Creek Reports Signifcant Drill Results Including 2 g/t Gold over 87 Meters Within a Near-Surface Intercept of 1 g/t Gold over 336 Meters and 0.7 g/t over 826.5 Meters at Treaty Creek in the Golden Triangle GS19-51 0.721 g/t Au over 246.0 m from 119.0 m GS19-53 0.984 g/t Au over 147.0 m from 108.0 m | Oct 28, 2019 | Treaty Creek JV Project | GS19-50 0.602 g/t Au over 577.5 m from 148.0 m |
|---|
| American Creek Reports Composites on Treaty Creek Drill Holes Including GS19-48 (838.5m @ 0.728 g/t Gold) and GS19-49 (1081.5m @ 0.589 g/t Gold Including an Upper Interval of 301.5m @ 0.828 g/t Gold) Located in British Columbia's Golden Triangle GS19-41 0.589 g/t Au over 325 m from 27.5 m GS19-43 0.566 g/t Au over 493.5 m from 68 m | Sep 30, 2019 | Treaty Creek Project | GS19-40 0.443 g/t Au over 327 m from 23 m |
|---|
| American Creek Reports That 150m Step-out Intercepted the Largest Gold Interval Drilled to Date at Treaty Creek Project - 1081.5m Averaging 0.589 g/t Gold Including an Upper Interval of 301.5m Containing 0.828 g/t Gold GS19-48 0.725 g/t Au over 838.5 m from 97.5 m GS19-43 0.566 g/t Au over 493.5 m from 68 m | Sep 23, 2019 | Treaty Creek Project | GS19-47 0.589 g/t Au over 1081.5 m from 117.5 m |
|---|
| American Creek Reports 780 Meter Intercept of 0.683 g/t Gold Including a Higher Grade Upper Portion of 1.095 g/t over 370.5 Meters in New Hole at Treaty Creek Prompting Mobilization of Second Drill to Project GS19-41 0.589 g/t Au over 325 m from 27.5 m GS19-40 0.443 g/t Au over 327 m from 23 m | Jul 30, 2019 | Treaty Creek Joint Venture project | GS19-42 1.095 g/t Au over 370.5 m from 63.5 m |
|---|
| American Creek Reports JV Partner Intersects 0.98 g/t Gold Over 563.8M At Treaty Creek Property in the Golden Triangle CB-18-38 0.561 g/t Au over 19.5 m from 20.5 m CB-18-36 0.76 g/t Au over 46.5 m from 658 m | Nov 26, 2018 | Treaty Creek Project | CB-18-39 0.981 g/t Au over 563.8 m from 141.5 m |
|---|
| American Creek Reports That JV Partner Tudor Gold Continues to Grow Treaty Creek; Hole 37B Returns 482m of 0.486 g/t Gold, Including 175m of 0.79 g/t Gold CB-18-34 0.554 g/t Au over 178.50 m from 417.50 m CB-18-37 0.612 g/t Au over 30.00 m from 69.50 m | Oct 31, 2018 | Treaty Creek Project | CB-18-33B 0.502 g/t Au over 16.50 m from 548.00 m |
|---|
| American Creek Samples High Grade Gold up to 61.2 g/t from Dunwell Mine Property in BC's Golden Triangle D4-10-10 5.31 g/t Au over 5.18 m from 216.77 m D4-10-11 4.74 g/t Au over 5.85 m from 217.07 m | Sep 17, 2018 | Dunwell Project | D4-10-09 14.27 g/t Au over 6.71 m from 215.55 m |
|---|