Veris Gold Corp (TSX:VG) Drill core

Veris Gold Corp

Drill core

ReleaseDateProjectHeadline hole
Veris Gold Corp. drills 51.85 m averaging 7.68 g/t Au at SSX-Steer Mine, Jerritt Canyon Nevada
SSX-SR-249 3.12 g/t Au over 6.10 m from 85.40 m
SSX-SR-251 7.68 g/t Au over 51.85 m from 211.97 m
Dec 4, 2013SSX-Steer MineSSX-SR-248 3.67 g/t Au over 21.35 m from 154.02 m
Veris Gold Corp. Drills 49.71 m Grading 8.26 g/t Au at Jerritt Canyon, Nevada
SMI-LX-817 6.86 g/t Au over 4.88 m from 159.82 m
SMI-LX-818 6.45 g/t Au over 18.30 m from 111.63 m
Jan 22, 2013Smith MineSMI-LX-816 7.82 g/t Au over 14.94 m from 265.04 m