Veris Gold Corp (TSX:VG) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Veris Gold Corp. drills 51.85 m averaging 7.68 g/t Au at SSX-Steer Mine, Jerritt Canyon Nevada SSX-SR-249 3.12 g/t Au over 6.10 m from 85.40 m SSX-SR-251 7.68 g/t Au over 51.85 m from 211.97 m | Dec 4, 2013 | SSX-Steer Mine | SSX-SR-248 3.67 g/t Au over 21.35 m from 154.02 m |
| Veris Gold Corp. Drills 49.71 m Grading 8.26 g/t Au at Jerritt Canyon, Nevada SMI-LX-817 6.86 g/t Au over 4.88 m from 159.82 m SMI-LX-818 6.45 g/t Au over 18.30 m from 111.63 m | Jan 22, 2013 | Smith Mine | SMI-LX-816 7.82 g/t Au over 14.94 m from 265.04 m |