Blossom Gold, Inc. (TSX:BGAU) Drill core

Blossom Gold, Inc.

Drill core

ReleaseDateProjectHeadline hole
Blossom Gold Surface Drilling Program Intercepts 128 meters at 1.19gAu/t including 37.1m at 2.82gAu/t at its Rosebud Project
RC26-008 0.006 oz/t Au over 149.4 m from 0.0 m
RC26-001 0.007 oz/t Au over 105.1 m from 77.7 m
Oct 28, 2026Rosebud ProjectBG26-044 0.005 oz/t Au over 269.2 m from 11.0 m
Blossom Gold Intercepts 106.8m at 0.42gAu/t and 44.8m at 1.22gAu/t, and Extends Near-Surface Mineralization at its Rosebud Open-Pit Heap-Leach Project
BG26-041 0.215 g/t Au over 60.7 m from 8.7 m
RC26-009 0.327 g/t Au over 60.1 m from 0.0 m
Sep 24, 2026Rosebud Open-Pit Heap-Leach ProjectBG26-031 1.224 g/t Au over 44.8 m from 149.8 m
Blossom Gold Reports Initial, Open Pit Expansion and Infill Drill Results from the Rosebud Open-Pit, Heap-Leach Project
BG26-005 0.794 g/t Au over 18.3 m from 126.5 m
BG26-007 0.385 g/t Au over 81.5 m from 27.1 m
Jun 30, 2026Rosebud ProjectBG26-002 0.385 g/t Au over 41.2 m from 19.8 m