StrikePoint Gold Inc. (TRADEGATE:NK6) Drill core

StrikePoint Gold Inc.

Drill core

ReleaseDateProjectHeadline hole
StrikePoint Announces Final Results of Drilling at Hercules Gold Project, H26005 Cut 67.06m Grading 0.53 g/t Au and 11.69 g/t Ag Including 7.62m of 2.93 g/t Au with 54.48 g/t Ag
H26007 0.25 g/t Au over 13.72 m from 27.43 m
H26009 0.42 g/t Au over 9.14 m from 71.63 m
Jul 21, 2026Hercules Gold ProjectH26005 0.53 g/t Au over 67.06 m from 118.87 m
StrikePoint Drills Best Hole to Date at Hercules Gold Project, H26004 Cuts 114.30m Grading 0.69 g/t Au and 5.03 g/t Ag Including 9.14 m of 2.95 g/t Au with 16.18 g/t Ag, New Broad Zone of Oxide Gold Mineralization Developing at Cliffs Target
H26008 0.15 g/t Au over 1.52 m from 1.52 m
H26010 0.28 g/t Au over 6.10 m from 1.52 m
May 26, 2026Hercules Gold ProjectH26004 0.69 g/t Au over 114.30 m from 135.64 m
StrikePoint Drills Multiple Gold-Silver Intercepts Including 21.34m grading 0.62 g/t Au and 8.6 g/t Ag at the Hercules Target and 13.72m grading 1.09 g/t Au and 4.6 g/t Ag at the Cliffs Target
H26002 0.11 g/t Au over 6.10 m from 7.62 m
H26003 0.37 g/t Au over 25.91 m from 80.77 m
May 4, 2026Hercules Gold ProjectH26001 0.34 g/t Au over 47.24 m from 103.63 m
StrikePoint Drills Near-Surface High Grade Oxide Gold at the Hercules Gold Project, Nevada, 32.04 Meters of 0.54 g/t Au and 4.62 g/t Ag Starting at Surface, Including 4.57 Meters of 1.14 g/t Au and 10.53 g/t Ag and an Additional 6.10m of 1.50 g/t Au and 11.75 g/t Ag
H25002 0.30 g/t Au over 18.29 m from 0.00 m
H25003 0.23 g/t Au over 3.05 m from 0.00 m
Apr 28, 2025Hercules Gold ProjectH25001 0.22 g/t Au over 4.57 m from 4.57 m
Drilling at Cuprite Gold Project Returns Multiple Gold Intercepts Including 6.10 Meters Grading 0.74 g/t Au and 14.75 g/t Ag
SKP24-003 0.17 g/t Au over 4.57 m from 271.27 m
SKP24-004 0.21 g/t Au over 6.10 m from 397.76 m
Jun 4, 2024Cuprite Gold ProjectSKP24-001 0.74 g/t Au over 6.10 m from 364.24 m
StrikePoint Intersects 2,980 g/t Silver over 0.51 meters at Porter and Discovers Potential Roots to the Vein System Returning 116 g/t Silver and 3.14 g/t Gold over 1.0 metersDec 19, 2022Porter-Idaho projectPIP22-030 2980.0 g/t Ag over 0.51 m from 216.10 m
StrikePoint Discovers Two New Zones of Surface Mineralization with Results Up to 156 g/t Gold and 91.7 g/t Silver and Extends North Zone with Results up to 53.9 g/t Gold and 1,240 g/t Silver at Willoughby
W22-126 0.59 g/t Au over 13.68 m from 110.70 m
W22-127 0.92 g/t Au over 8.78 m from 189.00 m
Nov 28, 2022Willoughby gold-silver projectW22-125 1.02 g/t Au over 5.49 m from 113.36 m
StrikePoint Gold's Willoughby Surface Sampling Identifies Strike Extensions at NN and Willow Zones with High Grade Samples Including 49 g/t Gold and 777 g/t Silver and 8.59 g/t AuEq over 3 Metres at Edge Zone
W21-CH-009 1.83 g/t Au over 1.00 m from 0.00 m
W21-CH-010 2.94 g/t Au over 11.00 m from 0.00 m
Apr 12, 2022Willoughby gold-silver projectW21-CH-008 8.60 g/t AuEq over 3.00 m from 1.00 m
StrikePoint Gold Extends Willoughby Mineralized Trend: 9.88 metres of 4.95 g/t Au Equivalent
W21-114 0.41 g/t Au over 20.40 m from 40.60 m
W21-115 4.95 g/t AuEq over 9.88 m from 36.12 m
Mar 2, 2022Willoughby PropertyW21-113 1.04 g/t Au over 2.00 m from 3.00 m
Strikepoint Gold's Step-out Drilling at Willoughby Intersects 10.24g/t Gold-Equivalent over 6.16 Meters
W21-109 10.24 g/t AuEq over 6.16 m from 285.34 m
W21-110 3.93 g/t AuEq over 4.00 m from 188.00 m
Dec 9, 2021Willoughby PropertyW21-108 0.96 g/t Au over 3.00 m from 183.00 m
StrikePoint Gold Intersects Massive Sulphides hosting 10.0 g/t Gold over 7.72 Meters within Edge Zone Discovery, Willoughby Project
W20-103 5.76 g/t Au over 0.65 m from 45.50 m
W20-104 1.49 g/t Au over 5.79 m from 145.00 m
Feb 3, 2021Edge Zone. The PropertyW20-102 0.88 g/t Au over 27.62 m from 75.00 m
Strikepoint Intersects 72 g/t Gold and 55 g/t Silver over 1.33 Meters at Willoughby
W19-096 1.52 g/t Au over 1.50 m from 60.00 m
W19-097 55.00 g/t Ag over 1.33 m from 91.17 m
Dec 3, 2019Willoughby PropertyW19-095 1.91 g/t Au over 0.65 m from 124.20 m
StrikePoint Intersects 102 g/t Gold and 356 g/t Silver over 1.0 Meters from a 100 Meter Step-out from the North Zone, Willoughby Property
W19-092 1.56 g/t Au over 4.17 m from 77.50 m
W19-094 356.00 g/t Ag over 1.00 m from 149.00 m
Oct 10, 2019Willoughby PropertyW19-091 1.36 g/t Au over 1.60 m from 27.55 m
StrikePoint Receives Assays from Initial Two Holes at Willoughby, Including: 3.87 g/t Au over 11.7 Meters at Wilby Zone
W19-099 3.87 g/t Au over 11.70 m from 120.55 m
Sep 16, 2019Willoughby gold-silver projectW19-090 2.20 g/t Au over 2.92 m from 46.08 m
StrikePoint Gold Inc. Releases Drill Results from the Porter Project, British Columbia, Including 5-meters at 819 Grams per Tonne Silver
PIP18-002 220 g/t Ag over 0.5 m from 57.5 m
PIP18-006 51 g/t Ag over 0.5 m from 75.5 m
Jan 9, 2019Porter ProjectPIP18-001 58 g/t Ag over 0.5 m from 56 m
StrikePoint Gold Drills 15.24 Metres of 1.05 g/t Gold at Pluto Project
17-CRN-02 1.05 g/t Au over 15.24 m from 21.34 m
17-CRN-03 0.12 % Cu over 3.05 m from 76.2 m
Oct 23, 2017Pluto Project17-CRN-01 0.74 g/t Au over 6.10 m from 4.57 m
StrikePoint Approves Winter IP Program at Angelina Following Drill Program Results
11AG-04 2960 ppb Au over 0.92 m from 17.24 m
11AG-05 180 ppb Au over 0.43 m from 21.10 m
Nov 29, 2011Angelina property11AG-03 910 ppb Au over 0.30 m from 17.70 m
Drill Results Extend Dufferin Mineralization, 38.52 g/t Gold over 1.9 m
F10-28 6.32 g/t Au over 1.25 m from 135.45 m
F10-29 8.19 g/t Au over 5.6 m from 89.00 m
Mar 1, 2011Dufferin MineF10-27 38.52 g/t Au over 1.9 m from 36.00 m