Gold X2 Mining Inc. (TRADEGATE:DF8) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Gold X2 Intersects 258.4m of 0.97 g/t Au and 192.0m of 0.90 g/t Au in QES Extension Drilling MQD-26-477 0.90 g/t Au over 192.00 m from 447.00 m MQD-25-181 1.50 g/t Au over 100.75 m from 494.00 m | Nov 10, 2026 | Moss Gold Project | MQD-26-475 0.97 g/t Au over 258.35 m from 603.00 m |
| Gold X2 Drilling Intersects 173.0m of 0.89 g/t Au 100m Beneath the RPEEE Pit at QES MQD-26-474 0.89 g/t Au over 173.00 m from 685.00 m | Sep 10, 2026 | Moss Gold Project | MQD-26-465 0.77 g/t Au over 13.00 m from 273.00 m |
| Gold X2 Discovers Extension to the Span Prospect with Intersection of 40.4m of 2.05 g/t Au from 343.6m Indicating the Potential NE Extension of the Moss Deposit MSD-26-394 0.38 g/t Au over 3.00 m from 346.00 m MSD-26-395 0.54 g/t Au over 2.00 m from 131.00 m | Sep 8, 2026 | Span Prospect | MSD-26-391 0.39 g/t Au over 12.00 m from 329.00 m |
| Gold X2 Drilling Intersects Multiple Shears Near Surface Including 32.8m of 1.22 g/t Au from 166.2m MMD-26-375 7.43 g/t Au over 3.55 m from 199.45 m MMD-26-379 0.86 g/t Au over 57.95 m from 182.0 m | Jun 30, 2026 | Moss Gold Project | MMD-26-371 0.60 g/t Au over 40.0 m from 466.0 m |
| Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project MQD-25-160 1.10 g/t Au over 25.00 m from 107.20 m MQD-25-161 0.40 g/t Au over 2.75 m from 237.00 m | Jun 2, 2026 | Moss Gold Project | MQD-25-149 1.08 g/t Au over 4.06 m from 140.65 m |
| Gold X2 Intersects 27.0m of 3.87 g/t Au from 555.0m at Base of the Eastern QES Pit Including 11.0m of 8.84 g/t Au MQD-26-370 0.43 g/t Au over 3.00 m from 119.00 m MQD-26-374 2.92 g/t Au over 9.80 m from 205.00 m | May 20, 2026 | Moss Gold Project | MQD-26-365 0.32 g/t Au over 10.00 m from 194.00 m |
| Gold X2 Intersects 60.7m of 1.51 g/t Au from 47.0m at QES as Part of the Moss Gold Project Infill Drilling Program MQD-26-338 0.35 g/t Au over 5.10 m from 86.00 m MQD-26-339 0.37 g/t Au over 3.00 m from 61.00 m | May 13, 2026 | Moss Gold Project | MQD-26-336 0.40 g/t Au over 5.30 m from 59.30 m |
| Gold X2 Intersects Several Shallow, High-Grade Intercepts in the Superion Zone Including 6.10m of 10.4 g/t Au MQD-26-337 1.16 g/t Au over 18.25 m from 70.50 m MQD-26-347 0.70 g/t Au over 2.00 m from 121.00 m | Apr 28, 2026 | Moss Gold Project | MQD-26-335 0.86 g/t Au over 15.00 m from 66.00 m |
| Gold X2 QES Drilling Intercepts 100.75m of 1.50 g/t Au from 495m Including 14m of 3.94 g/t Au from 542m at the Base of the Resource Pit MQD-25-176 1.64 g/t Au over 5.00 m from 293.00 m MQD-25-177 0.94 g/t Au over 2.40 m from 274.00 m | Apr 13, 2026 | Moss Gold Project | MQD-25-148 0.57 g/t Au over 2.00 m from 282.00 m |
| Gold X2 Announces New Superion Shear with Intercept of 9.0m of 3.13 g/t Au Including 3.95m of 6.94 g/t Au MQD-25-264 0.43 g/t Au over 7.00 m from 131.00 m MQD-25-269 0.39 g/t Au over 3.00 m from 42.00 m | Apr 6, 2026 | Moss Gold Project | MQD-25-256 0.47 g/t Au over 7.15 m from 92.00 m |
| Gold X2 Mining Defines Additional High Grade Corridors with Intersects of 87.0m of 1.75 g/t Au and 83.0m @ 1.56 g/t Au at QES Zone Grade Control Drilling MQD-25-263 1.19 g/t Au over 10.00 m from 53.00 m MQD-25-265 0.34 g/t Au over 7.35 m from 58.00 m | Feb 24, 2026 | Moss Gold Project | MQD-25-262 1.86 g/t Au over 49.00 m from 55.00 m |
| Gold X2 Discovers Two Mineralized Shears on the Deaty Trend Including 17.0m @ 1.23 g/t Au DBD-25-003 1.23 g/t Au over 17.00 m from 21.00 m DBD-25-004 0.65 g/t Au over 2.00 m from 236.00 m | Feb 5, 2026 | Moss Gold Project | DBD-25-001 2.24 g/t Au over 5.60 m from 163.40 m |
| Gold X2 Announces Positive Reconciliation in Main Zone Grade Control Drilling with Intercepts Including 49.0m of 2.13 g/t Au MMD-25-235 1.30 g/t Au over 73.80 m from 7.00 m MMD-25-252 0.80 g/t Au over 31.35 m from 33.65 m | Jan 30, 2026 | Moss Gold Project | MMD-25-224 0.46 g/t Au over 8.30 m from 25.40 m |
| Grade Control Drilling at Moss Main Zone Defines Higher Grade Corridors Intersecting 78.4m of 1.44 g/t Au from 15.6m MMD-25-232 0.52 g/t Au over 18.00 m from 5.00 m MMD-25-233 0.74 g/t Au over 5.75 m from 13.65 m | Nov 13, 2025 | Moss Gold Project | MMD-25-228 0.85 g/t Au over 8.30 m from 8.00 m |
| Grade Control Drilling at Moss Main Zone Continues to Delineate High Grade Shear Corridors with Intersects of 69.65m of 1.63 g/t Au from 4.35m, Including 10.0m of 7.09 g/t Au MMD-25-218 0.37 g/t Au over 6.00 m from 9.00 m MMD-25-219 1.01 g/t Au over 73.25 m from 9.75 m | Oct 29, 2025 | Moss Gold Project | MMD-25-199 0.62 g/t Au over 37.55 m from 5.00 m |
| Gold X2 Intersects up to 50.85m of 2.18 g/t Au from 1.15m in Moss Main Zone Grade Control Drilling Program MMD-25-201 1.54 g/t Au over 49.85 m from 0.70 m MMD-25-202 0.56 g/t Au over 25.00 m from 40.00 m | Sep 10, 2025 | Moss Gold Project | MMD-25-200 0.71 g/t Au over 57.15 m from 16.85 m |
| Goldshore Intersects 53m of 2.03 g/t Au from 160m in the Main Zone MMD-25-193 1.46 g/t Au over 8.15 m from 21.85 m MMD-25-194 1.16 g/t Au over 62.50 m from 11.00 m | Aug 12, 2025 | Moss Gold Project | MMD-25-192 2.03 g/t Au over 53.00 m from 160.00 m |
| Goldshore Intersects 25.3m of 0.92 g/t Au, Including 3.15m of 5.15 g/t Au from 391.85m, Proving Continuity of Shears Between the Main and Southwest Zones MMD-25-173 0.88 g/t Au over 8.20 m from 90.80 m MMD-25-184 0.63 g/t Au over 8.30 m from 105.70 m | Aug 8, 2025 | Moss Gold Project | MMD-25-172 0.43 g/t Au over 2.00 m from 19.00 m |
| Goldshore Intersects Additional Mineralization Beneath the Conceptual Open Pit at the Southwest Zone with 22m of 1.30 g/t Au MMD-25-183 0.69 g/t Au over 5.00 m from 15.00 m MMD-25-185 0.91 g/t Au over 3.85 m from 98.70 m | Jul 25, 2025 | Moss Gold Project | MMD-25-182 1.60 g/t Au over 2.00 m from 56.00 m |
| Goldshore Intersects 42.7m of 1.09 g/t Au at the Eastern QES Zone of the Moss Deposit MQD-25-157 1.07 g/t Au over 4.60 m from 30.40 m MQD-25-159 0.55 g/t Au over 4.40 m from 261.45 m | Jul 3, 2025 | Moss Gold Project | MQD-25-155 1.09 g/t Au over 42.70 m from 241.60 m |
| Goldshore Discovers New Mineralized Shear Zones as Part of Superion Exploration Drilling at the Moss Deposit with 17.7m of 1.52 g/t Au MQD-25-179 1.52 g/t Au over 17.70 m from 333.00 m MQD-25-180 0.73 g/t Au over 3.05 m from 175.00 m | Jun 11, 2025 | Moss Gold Project | MQD-25-178 0.31 g/t Au over 5.85 m from 57.00 m |
| Goldshore Expands the Superion Zone with 9.45m of 6.02 g/t Au in Follow Up Drilling at the Moss Deposit MQD-25-149 1.08 g/t Au over 4.06 m from 140.65 m MQD-25-150 0.35 g/t Au over 3.70 m from 109.95 m | May 15, 2025 | Moss Gold Project | MQD-25-146 0.44 g/t Au over 3.00 m from 160.00 m |
| Goldshore Expands Near Surface Mineralized Shears with 25.0m of 1.10 g/t Au at the Moss Deposit MQD-25-152 0.55 g/t Au over 5.10 m from 61.00 m MQD-25-158 0.43 g/t Au over 2.00 m from 135.00 m | May 1, 2025 | Moss Gold Project | MQD-25-151 0.40 g/t Au over 5.15 m from 67.85 m |
| Goldshore Intersects 124.35m of 1.65 g/t Au, Including 47.0m of 3.08 g/t Au, at the Moss Deposit MQD-25-154 0.36 g/t Au over 10.00 m from 107.00 m MQD-25-156 0.59 g/t Au over 13.55 m from 88.55 m | Apr 22, 2025 | Moss Gold Project | MQD-25-153 0.31 g/t Au over 10.00 m from 48.00 m |
| Goldshore Discovers Additional Mineralization Between the Southwest and Main Zones MMD-25-166 2.81 g/t Au over 2.00 m from 98.00 m MMD-25-167 0.35 g/t Au over 6.00 m from 66.00 m | Apr 15, 2025 | Moss Gold Project | MMD-25-165 2.64 g/t Au over 12.90 m from 243.40 m |
| Goldshore Intersects Shallow Mineralization at Moss with 25.89m of 1.15 g/t Au Including 3.17m of 6.8 g/t Au at 84.91m Depth Below Surface MMD-25-140 0.34 g/t Au over 2.00 m from 56.00 m MMD-25-141 0.39 g/t Au over 3.04 m from 50.96 m | Mar 20, 2025 | Moss Gold Project | MMD-24-137 0.41 g/t Au over 5.35 m from 163.00 m |
| Goldshore Discovers Shallow New Zone at Moss Gold with 17.6m of 3.03 g/t Au Including 6.8m of 7.06 g/t Au at 60m Depth Below Surface MMD-25-144 0.34 g/t Au over 12.00 m from 33.00 m MMD-25-145 0.44 g/t Au over 27.00 m from 32.00 m | Mar 3, 2025 | Moss Gold Project | MMD-25-143 0.40 g/t Au over 2.00 m from 16.00 m |
| Goldshore Intersects 20.55m of 2.58 g/t Au Down Dip on the Southwest Zone: Extends Mineralization 150 Meters Below the Conceptual Open Pit Resource MMD-24-138 0.76 g/t Au over 20.80 m from 108.80 m MMD-24-139 2.58 g/t Au over 20.55 m from 458.15 m | Feb 20, 2025 | Moss Gold Project | MMD-24-135 1.12 g/t Au over 5.95 m from 6.50 m |
| Goldshore Reports Drill Results from Summer Program and Provides Corporate Update | Sep 10, 2024 | Moss Gold Project | MBD-24-123 1.27 g/t Au over 13.30 m from 131.5 m |
| Goldshore Adds More High-Grade Shears at the Southwest Zone; Intersects 3.25 g/t Au over 13.05m and 3.88 g/t over 5.6m MMD-22-110 0.41 g/t Au over 50.95 m from 7.00 m MMD-22-111 3.88 g/t Au over 5.60 m from 386.00 m | Apr 25, 2023 | Moss Gold Project | MMD-22-107 0.58 g/t Au over 37.70 m from 11.30 m |
| Goldshore Expands Gold Mineralization Along Strike and at Depth at the Southwest Zone; Includes Intersects 2.17 g/t Au over 50.35m and 6.96 g/t Au over 15.05m MMD-22-106 0.33 g/t Au over 22.00 m from 165.00 m MMD-22-108 0.36 g/t Au over 6.60 m from 126.55 m | Apr 20, 2023 | Moss Lake Project | MMD-22-105 0.33 g/t Au over 3.00 m from 45.00 m |
| Goldshore Intersects Multiple New Parallel Shears Increasing Width of QES Zone by Over 100 meters - Including 1.33 g/t Au over 54.45m MQD-22-099 0.45 g/t Au over 2.00 m from 18.00 m MQD-22-100 0.31 g/t Au over 4.60 m from 99.40 m | Mar 14, 2023 | Moss Lake Project | MQD-22-098 0.32 g/t Au over 2.00 m from 122.00 m |
| Goldshore Intersects 5.64 g/t Au over 15.65m at East Coldstream CED-22-010 5.64 g/t Au over 15.65 m from 87.55 m CED-22-011 1.49 g/t Au over 3.35 m from 248.40 m | Feb 27, 2023 | Moss Lake Project | CED-22-009 0.58 g/t Au over 14.65 m from 497.00 m |
| Goldshore Intersects 9.46 g/t Au over 7.45m in the Southwest Zone MMD-22-059 0.36 g/t Au over 75.65 m from 231.35 m MMD-22-060 0.40 g/t Au over 6.80 m from 95.20 m | Feb 2, 2023 | Moss Lake Project | MMD-22-058 0.41 g/t Au over 7.00 m from 314.00 m |
| Goldshore Continues to Intersect Multiple +100m Wide Mineralized Zones at QES Zone Including 1.03 g/t Au over 152.0m in MQD-22-072 MQD-22-070 0.52 g/t Au over 7.50 m from 332.50 m MQD-22-072 1.03 g/t Au over 152.00 m from 464.00 m | Jan 17, 2023 | Moss Lake Project | MQD-22-062 0.44 g/t Au over 2.00 m from 202.00 m |
| Goldshore Intersects Additional High-Grade Shears in the QES Zone at the Moss Lake Gold Project MQD-22-076 0.46 g/t Au over 4.00 m from 192.00 m MQD-22-080 0.35 g/t Au over 3.85 m from 82.75 m | Nov 28, 2022 | Moss Lake Gold Project | MQD-22-075 1.51 g/t Au over 6.00 m from 502.00 m |
| Goldshore Intersects 1.34 g/t Au over 90.95m in 100 Meter Step-Out to the North MMD-22-048 0.78 g/t Au over 2.40 m from 190.00 m MMD-22-052 0.46 g/t Au over 6.65 m from 104.35 m | Nov 2, 2022 | Moss Lake Project | MMD-22-036 0.62 g/t Au over 13.80 m from 22.00 m |
| Goldshore Intersects 62.8m @ 0.88% Copper Equivalent at North Coldstream with Significant Cobalt Assays | Oct 4, 2022 | Moss Lake Project | CND-22-006 0.88 % CuEq over 62.80 m from 8.20 m |
| Goldshore Intersects 192.75m @ 1.02 g/t Au from 94.45m depth in MMD-22-051 MMD-22-046 0.50 g/t Au over 29.50 m from 8.00 m MMD-22-047 0.36 g/t Au over 33.20 m from 26.50 m | Sep 29, 2022 | Moss Lake Project | MMD-22-041 0.38 g/t Au over 4.00 m from 41.00 m |
| Goldshore Announces Strong Initial Drilling Results from the East Coldstream Deposit 13 Kilometers Northeast of Moss Lake CED-22-003 0.61 g/t Au over 3.05 m from 168.85 m CED-22-004 1.34 g/t Au over 23.00 m from 244.00 m | Sep 12, 2022 | Moss Lake Project | CED-22-001 0.80 g/t Au over 2.45 m from 322.00 m |
| Goldshore Sampling of Historic Core Expands Mineralization with 104.2m at 1.04 g/t Au and Identifies New Parallel Zone ML-04-018 0.34 g/t Au over 7.20 m from 111.00 m NS247 1.04 g/t Au over 104.20 m from 422.00 m | Aug 23, 2022 | Moss Lake Project | ML-04-016 0.51 g/t Au over 25.30 m from 156.20 m |
| Goldshore Intercepts 2.65 g/t Au over 14.6m in 200 m Step-Out Hole at Moss Lake MMD-22-027 0.76 g/t Au over 5.20 m from 22.80 m MMD-22-031 0.61 g/t Au over 48.80 m from 15.50 m | Aug 10, 2022 | Moss Lake Project | MMD-22-023 2.65 g/t Au over 14.60 m from 462.20 m |
| Goldshore Resources Confirms High Grade Mineralization in the Main Zone MMD-22-030 0.51 g/t Au over 81.55 m from 7.00 m MMD-22-032 0.90 g/t Au over 8.00 m from 247.10 m | Jul 20, 2022 | Moss Lake Project | MMD-22-028 1.49 g/t Au over 13.30 m from 48.60 m |
| Goldshore Resources Drills 78.35m at 1.17 g/t Au and Delineates Higher Grade Lenses Within Moss Lake Deposit MMD-22-017 0.48 g/t Au over 8.80 m from 49.20 m MMD-22-020 1.17 g/t Au over 78.35 m from 170.35 m | Jun 29, 2022 | Moss Lake Project | MMD-22-016 0.71 g/t Au over 14.85 m from 55.00 m |
| Goldshore Resources Drills 65.0m @ 1.04 g/t Au at the QES Zone MMD-22-026 0.71 g/t Au over 12.95 m from 47.00 m MMD-22-029 0.31 g/t Au over 23.70 m from 60.00 m | Jun 14, 2022 | Moss Lake Project | MQD-22-019 1.04 g/t Au over 65.00 m from 142.40 m |
| Goldshore Resources Drills 128.3m Grading 1.1 g/t Au from the Moss Lake Deposit Additional Parallel Zone Returned 16.0m at 5.31 g/t Au with Visible Gold Also Discovered | May 5, 2022 | Moss Lake Project | MQD-22-014 1.05 g/t Au over 128.30 m from 121.30 m |
| Goldshore Reports Additional Step-Out Intercepts on the Margin of the Main Zone at Moss Lake, Ontario MMD-22-011 1.25 g/t Au over 13.00 m from 192.00 m MMD-22-012A 0.65 g/t Au over 2.00 m from 150.00 m | Apr 19, 2022 | Moss Lake Project | MMD-21-010 0.34 g/t Au over 3.85 m from 38.15 m |
| Goldshore Resources Intersects Three +1 g/t Au Zones Over 810 Meters | Jan 17, 2022 | Moss Lake Gold Project | MMD-21-007 1.27 g/t Au over 36.75 m from 37.50 m |
| Goldshore Resources Intersects Widespread Gold Mineralization in First Holes of 100,000 Meter Drill Program at Moss Lake, Ontario MMD-21-002 1.09 g/t Au over 35.00 m from 100.00 m MMD-21-003 1.20 g/t Au over 57.00 m from 4.00 m | Oct 21, 2021 | MMD-21-001 1.18 g/t Au over 31.00 m from 122.00 m |