Home
Stocks
Meridian Mining PLC
Studies
Meridian Mining PLC (SWB:N2E0) Studies
Meridian Mining PLC
Studies
Study
Date
Project
Study
NPV
IRR
Meridian Announces Filing of the NI 43-101 Definitive Feasibility Study Technical Report for the Cabaçal Gold-Copper-Silver Deposit in Brazil
Nov 2, 2026
Cabaçal Au-Cu-Ag Project
Feasibility study
US$2.1B, after-tax, 5%
108%, after-tax
Meridian Mining's Definitive Feasibility Study for Cabaçal Delivers After-Tax NPV5 of USD 2.09 Billion, 108% IRR, and 0.9 Year Payback
Sep 22, 2026
Cabaçal
Feasibility study
US$2,092M, after-tax, 5%
108%, after-tax
Meridian Mining’s Cabaçal Pre-Feasibility Study Delivers USD 984 million NPV5 & 61.2% IRR (After-Tax), and Annual Average Production 141,000 AuEq Ounces
Mar 10, 2025
Cabaçal
Pre-feasibility study
US$984M, after-tax, 5%
61.2%, after-tax
Meridian Announces Filing of its PEA Technical Report for Cabaçal Gold-Copper Project, Brazil
Apr 3, 2023
Cabaçal Gold-Copper Project
Preliminary economic assessment
US$573M, after-tax, 5%
58.4%, after-tax
Meridian Delivers Strong Economics for Cabaçal's PEA:
Mar 6, 2023
Cabaçal
Preliminary economic assessment
US$573M, after-tax, 5%
58.4%, after-tax
Meridian Announces Filing of the NI 43 101 Technical Report on the Mineral Resource Estimate for the Cabaçal Deposit
Nov 10, 2022
Cabaçal Project
Technical report
Meridian Announces Maiden Mineral Resource Estimate for Cabaçal Deposit
Sep 26, 2022
Cabaçal Project
Technical report
Bom Futuro Tailings Maiden Resource Delivers Positive Preliminary Economic Assessment
Dec 7, 2017
Bom Futuro tailings project
Preliminary economic assessment
US$50.2M, after-tax, 10%
39.8%, after-tax