Avrupa Minerals Ltd. (SWB:8AMA) Drill core

Avrupa Minerals Ltd.

Drill core

ReleaseDateProjectHeadline hole
Avrupa Minerals Intersects Polymetallic VMS Mineralization at Sesmarias
including best copper intervals 1.78 % Cu over 35.2 m from 377.2 m
Includes stockwork to semi-massive replacement sulfide mineralization 0.31 % Cu over 13.15 m from 439.70 m
Sep 19, 2024Sesmarias VMS Project(includes Fault breccia, massive, semi-massive replacement, stockwork sulfides) 1.59 % Cu over 41.2 m from 377.2 m
Avrupa Minerals Updates Drilling Results at the Sesmarias VMS target, Alvalade JV, Portugal
SES23-048 1.20 % Cu over 9.20 m from 419.10 m
SES23-049 0.29 % Cu over 0.70 m from 332.55 m
Nov 28, 2023Alvalade Joint Venture ProjectSES23-047 2.18 % Cu over 26.95 m from 393.80 m
Avrupa Minerals Intersects 26.95 Meters @ 2.18% Copper, 2.58% Lead, 5.60% Zinc, and 88.2 ppm Silver at Sesmarias, PortugalJun 12, 2023Alvalade JV ProjectSES23-047 2.18 % Cu over 26.95 m from 393.80 m
Avrupa Drills 0.48% Cu over 22.9 meters - Proving Continuity of Copper-Zinc Mineralization at Sesmarias North, Alvalade Project, PortugalApr 4, 2022Alvalade ProjectSES21-046 0.48 % Cu over 22.9 m from 378.50 m
Avrupa Reports New Drill Results and Extends Massive Sulfide Mineralization at Sesmarias North, Alvalade Project, Portugal
SES21-038 0.72 % Cu over 6.0 m from 356.85 m
SES21-039 0.44 % Cu over 39.2 m from 348.0 m
Sep 21, 2021Sesmarias Copper-Zinc ProspectSES21-037 0.28 % Cu over 3.9 m from 476.85 m
Avrupa Intercepts 8 Lens Horizon at Sesmarias North and Reports on Early Positive Progress in Drilling ProgramFeb 24, 2021Sesmarias ProspectSES20-031 0.19 % Cu over 10.75 m from 277.70 m
Avrupa Minerals confirms high grade copper assays of Sesmarias "2" Lens on the Alvalade Project, PortugalMar 27, 2019Alvalade ProjectSES003 1.92 % Cu over 13.65 m from 132.05 m
Avrupa Minerals drills 28.95 meters of 0.48% Copper and 0.77 g/t Gold at Sesmarias
SES028 0.09 % Pb over 26.55 m from 373.40 m
Mar 11, 2019Sesmarias ProspectSES026 0.48 % Cu over 28.95 m from 385.70 m
Avrupa Minerals Announces New Drilling Results for Slivovo Gold Project
SLV049 1.53 g/t Au over 9.2 m from 16 m
SLV050 0.52 g/t Au over 12.25 m from 14.85 m
Aug 16, 2016Slivovo Gold ProjectDHIP001 5.98 g/t Au over 15 m from 84.5 m
Avrupa Reports Further Drill Results at Slivovo
SLV029 6.39 g/t Au over 27 m from 37 m
SLV031 3.98 g/t Au over 37 m from 0 m
Oct 26, 2015Slivovo projectSLV028 5.37 g/t Au over 120 m from 29 m