Capstone Copper Corp. (SWB:0GJ) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Capstone Copper Reports Results of Phase 1 Drill Program at Mantoverde DDH25DS01 0.65 % Cu over 144 m from 528 m DDH25DS02 0.23 % Cu over 22 m from 410 m | Oct 7, 2025 | Mantoverde | DDH24DS02 0.65 % Cu over 52 m from 400 m |
| Capstone Mining Steps Out Into 5.1m of 7.6% Cu at Cozamin: Drilling Continues to Deliver Amongst the Best Results Ever CG-20-S473 5.16 % Cu over 5.9 m from 629.9 m CG-20-S466 3.70 % Cu over 10.4 m from 614.7 m | Apr 23, 2020 | Cozamin Mine | CG-20-S471 7.58 % Cu over 6.6 m from 567.5 m |
| Capstone Mining Steps Out Into 6.3m of 5.3% Cu: Expansion and Infill Drilling Amongst the Best Results Ever at Cozamin CG-19-S443 4.95 % Cu over 2.3 m from 588.7 m CG-19-S436 6.13 % Cu over 2.4 m from 642.8 m | Jan 16, 2020 | Cozamin Mine | CG-19-S445 5.31 % Cu over 9.9 m from 553.5 m |
| Capstone Intercepts 20m of 2.2% Cu Including 5m of 5.3% Cu: Exploration Program Pointing to Higher Grades and Wider Intercepts than in Current Reserve CG-19-S427 4.01 % Cu over 6.2 m from 626.9 m CG-19-S429 1.49 % Cu over 18.8 m from 569.3 m | Dec 2, 2019 | Cozamin Mine | CG-19-S434 2.20 % Cu over 23.4 m from 527.5 m |
| Capstone Intersects 20.1 Meters Grading 5.53% Copper, Including 6.4 Meters of 11.32% Copper at Cozamin Mine CG-19-U498 5.02 % Cu over 12.4 m from 511.1 m CG-19-S384 3.56 % Cu over 5.1 m from 566.0 m | Nov 5, 2019 | Cozamin Mine | CG-19-U499 1.75 % Cu over 4.8 m from 519.7 m |
| Capstone Reports Additional High Grade Copper-Gold Intercepts from the Copper Keel Deposit at the Minto Mine 11SWC-765 2.00 % Cu over 20.9 m from 268.1 m 11SWC-770 3.60 g/t Au over 6.1 m from 327.5 m | May 2, 2011 | Minto Mine | 11SWC-762 2.10 % Cu over 14.3 m from 265.3 m |
| Capstone Reports High Grade Intercepts at Cozamin Mine in Step Out and Infill Drilling U256 41.20 g/t Ag over 9.65 m from 290.80 m U259 59.01 g/t Ag over 5.65 m from 555.45 m | Apr 14, 2011 | Cozamin Mine | U255 2.81 % Cu over 3.80 m from 545.50 m |
| Capstone Reports Additional High Grade Intercepts at Cozamin Mine U254 180.53 g/t Ag over 8.15 m from 419.85 m U248 2.16 % Cu over 0.95 m from 403.70 m | Mar 7, 2011 | Cozamin Mine | U251 18.9 g/t Ag over 22.55 m from 326.10 m |