Viridian Metals Inc (OTC:VIRMF) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Viridian Intersects Sulphides Throughout 3 km of Step-Out Drilling at Kraken Main VKS26-053 0.05 % Cu over 3.5 m from 1.5 m VKS26-054 0.36 % Cu over 3.3 m from 0.7 m | Oct 2, 2026 | Kraken Main Zone | VKS26-052 0.07 % Cu over 2.3 m from 0.7 m |
| Viridian Metals Intersects Over 50 Metres of Mineralization from Surface at Kraken Main VKS26-053 0.05 % Cu over 3.5 m from 1.5 m VKS26-054 0.36 % Cu over 3.3 m from 0.7 m | Sep 8, 2026 | Kraken Main Zone | VKS26-052 0.07 % Cu over 2.3 m from 0.7 m |
| Viridian Releases Initial 2025 Drill Results Confirming Shallow, Continuous Sulphide Mineralization at Kraken VKS25-024 1.44 % CuEq over 0.8 m from 24.25 m VKS25-025 0.09 % Ni over 5.25 m from 21.00 m | Dec 10, 2025 | Kraken Project | VKS25-023 0.10 % Ni over 22.35 m from 0.00 m |
| Viridian Metals Defines Mineralized Footprint Within 5km Conductor at Kraken with Final 2024 Drill Results VKS24-009 0.29 % CuEq over 19.05 m from 1.50 m VKS24-012 0.17 % CuEq over 15.40 m from 1.00 m | Feb 26, 2025 | Kraken Project | VKS24-008 0.48 % CuEq over 20.90 m from 1.80 m |