Surge Battery Metals Inc (OTC:NILIF) Drill core
Drill core
| Release | Date | Project | Headline hole |
|---|---|---|---|
| Surge Drills 116 Meters of 3,752 ppm Lithium in Infill Drilling; Including 32m of 4,521 ppm Lithium NNL-032 4081 ppm Li over 16.8 m from 8.23 m NNL-033 4386 ppm Li over 24.4 m from 17.07 m | Feb 25, 2026 | Nevada North Lithium Project | NNL-030 4521 ppm Li over 32.1 m from 28.22 m |
| Surge Continues to Encounter Robust Lithium Grades Including 31M Intercepts at 4196 PPM Li from Surface in a 640M Step Out to the SE NNL-031 4468 ppm Li over 33.62 m from 14.54 m NNL-034 2061 ppm Li over 10.76 m from 5.79 m | Feb 17, 2026 | Nevada North Lithium Project | NNL-029 3989 ppm Li over 11.5 m from 0 m |
| Surge Intercepts 80.7M @4,009 PPM Li in most South Easterly Hole to Date: New Record-High Grade sample of 8,190 PPM Li NNL-027 2322 ppm Li over 15 ft from 100 ft NNL-025 1121 ppm Li over 10 ft from 150 ft | Aug 14, 2024 | Nevada North Lithium Project | NNL-028 4674 ppm Li over 85 ft from 235 ft |
| Surge Battery Metals Expansion Drilling Intersects High Grade Lithium Clay South of Resource Area: Wide Intercepts up to 91.4 M @3,800 PPM Li Returned, Increases Strike Length 1.3KM NNL-022 4,605 ppm Li over 85 ft from 45 ft NNL-023 1,150 ppm Li over 5 ft from 5 ft | Jul 23, 2024 | Nevada North Lithium Project | NNL-021 2,696 ppm Li over 20 ft from 0 ft |
| Surge Battery Metals Announces Core Drilling Intercepts over 4,000 ppm Lithium at Surface with Assays up to 7,630 PPM; Deeper Drilling Confirms Multiple Horizons NN2308 4718 ppm Li over 82.0 ft from 25.0 ft NN2309 3446 ppm Li over 72 ft from 0 ft | Dec 5, 2023 | Nevada North | NN2306 4423 ppm Li over 32 ft from 0 ft |
| Surge Intersects 54.1m (177ft) at 3,003 ppm of Lithium Including 15.2m (50ft) at 3,926 ppm Li From Surface | Nov 7, 2023 | Nevada North Lithium Project | NN2305 3437 ppm Li over 62.5 ft from 0.0 ft |
| Surge Confirms 1.5km Extension of Lithium Mineralization with Grades up to 5,670 ppm Lithium from Holes 2303 and 2304 NN2304 3841 ppm Li over 97.5 ft from 70 ft | Oct 18, 2023 | Nevada North Lithium Project | NN2303 1210 ppm Li over 2.5 ft from 2.5 ft |
| Surge Continues to Intercept Significant Lithium Results with Second 2023 Hole up to 5820 ppm Lithium | Sep 26, 2023 | Nevada North Lithium Project | NN2302 5400 ppm Li over 2.5 ft from 67.5 ft |
| Surge Announces Highest Grade Lithium Assays to Date with up to 8070 ppm Lithium in the First 2023 Hole at Nevada North Lithium Project | Sep 12, 2023 | Nevada North Lithium Project | NN2301 5760 ppm Li over 2.5 ft from 27.5 ft |
| Surge Battery Metals Announces Best Lithium Results To Date from Drill Holes 7 and 8 at the Nevada North Lithium Project NN2208 3621 ppm Li over 75 ft from 0 ft NN2201 3826 ppm Li over 55 ft from 0 ft | Jan 3, 2023 | Nevada North Lithium Project | NN2207 4092 ppm Li over 110 ft from 35 ft |
| Surge Battery Metals Announces Strong Lithium Results From Drill Holes One and Six at the Nevada North Lithium Project NN2206 1590 ppm Li over 20 ft from 0 ft | Dec 8, 2022 | Nevada North Lithium Project | NN2201 3826 ppm Li over 55 ft from 0 ft |
| Surge Battery Metals Announces Strong Lithium Results From Drilling at the Nevada North Lithium Project NN2204 3929 ppm Li over 100 ft from 0 ft NN2205 4000 ppm Li over 115 ft from 0 ft | Dec 1, 2022 | Nevada North Lithium Project | NN2203 4008 ppm Li over 120 ft from 5 ft |